-
1
-
-
0023398475
-
On the portability of quantitative software estimation models
-
T. K. Abdel-Hamid and S. E. Madnick, On the portability of quantitative software estimation models, Information & Management 13(1) (1987) 1-10.
-
(1987)
Information & Management
, vol.13
, Issue.1
, pp. 1-10
-
-
Abdel-Hamid, T.K.1
Madnick, S.E.2
-
2
-
-
0034557951
-
Software development cost estimation approaches a survey
-
B. Boehm, C. Abts and S. Chulani, Software development cost estimation approaches a survey, Annals of Software Engineering 10(1) (2000) 177-205.
-
(2000)
Annals of Software Engineering
, vol.10
, Issue.1
, pp. 177-205
-
-
Boehm, B.1
Abts, C.2
Chulani, S.3
-
6
-
-
75149165233
-
The rise and fall of the chaos report figures
-
J. Eveleens and C. Verhoef, The rise and fall of the chaos report figures, IEEE Software 27 (1) (2010) 30-36.
-
(2010)
IEEE Software
, vol.27
, Issue.1
, pp. 30-36
-
-
Eveleens, J.1
Verhoef, C.2
-
8
-
-
69549103096
-
Understanding the effects of requirements volatility in software engineering by using analytical modeling and software process simulation
-
S. Ferreira, J. Collofello, D. Shunk and G. Mackulak, Understanding the effects of requirements volatility in software engineering by using analytical modeling and software process simulation, Journal of Systems and Software 82(10) (2009) 1568-1577.
-
(2009)
Journal of Systems and Software
, vol.82
, Issue.10
, pp. 1568-1577
-
-
Ferreira, S.1
Collofello, J.2
Shunk, D.3
MacKulak, G.4
-
11
-
-
33745145871
-
A study to investigate the impact of requirements instability on software defects
-
Talha Javed, Manzile Maqsood and Qaiser S. Durrani, A study to investigate the impact of requirements instability on software defects, SIGSOFT Softw. Eng. Notes 29(1-7) (2004).
-
(2004)
SIGSOFT Softw. Eng. Notes
, vol.29
, Issue.1-7
-
-
Javed, T.1
Maqsood, M.2
Durrani, Q.S.3
-
12
-
-
0037349232
-
An effort prediction interval approach based on the empirical distribution of previous estimation accuracy
-
M. Joergensen and D. I. K. Sjoeberg, An effort prediction interval approach based on the empirical distribution of previous estimation accuracy, Information and Software Technology 45(3) (2003) 123-136.
-
(2003)
Information and Software Technology
, vol.45
, Issue.3
, pp. 123-136
-
-
Joergensen, M.1
Sjoeberg, D.I.K.2
-
13
-
-
21244481371
-
Practical guidelines for expert-judgment-based software effort estimation
-
M. Jorgensen, Practical guidelines for expert-judgment-based software effort estimation, IEEE Software 22(3) (2005) 57-63.
-
(2005)
IEEE Software
, vol.22
, Issue.3
, pp. 57-63
-
-
Jorgensen, M.1
-
14
-
-
34548164613
-
Forecasting of software development work effort: Evidence on expert judgement and formal models
-
M. Jørgensen, Forecasting of software development work effort: Evidence on expert judgement and formal models, International Journal of Forecasting 23(3) (2007) 449-462.
-
(2007)
International Journal of Forecasting
, vol.23
, Issue.3
, pp. 449-462
-
-
Jørgensen, M.1
-
16
-
-
23844532694
-
Reasons for software effort estimation error: Impact of respondent role, information collection approach, and data analysis method
-
M. Jorgensen and K. Molokken-Ostvold, Reasons for software effort estimation error: Impact of respondent role, information collection approach, and data analysis method, IEEE Transactions on Software Engineering 30(12) (2004) 993-1007.
-
(2004)
IEEE Transactions on Software Engineering
, vol.30
, Issue.12
, pp. 993-1007
-
-
Jorgensen, M.1
Molokken-Ostvold, K.2
-
17
-
-
1642487659
-
The impact of customer expectation on software development effort estimates
-
M. Jørgensen and D. I. K. Sjøberg, The impact of customer expectation on software development effort estimates, International Journal of Project Management 22(4) (2004) 317-325.
-
(2004)
International Journal of Project Management
, vol.22
, Issue.4
, pp. 317-325
-
-
Jørgensen, M.1
Sjøberg, D.I.K.2
-
18
-
-
0025434552
-
Software size estimation of object-oriented systems
-
L. A. Laranjeira, Software size estimation of object-oriented systems, IEEE Transactions on Software Engineering 16(5) (1990) 510-522.
-
(1990)
IEEE Transactions on Software Engineering
, vol.16
, Issue.5
, pp. 510-522
-
-
Laranjeira, L.A.1
-
19
-
-
0037845141
-
Combining techniques to optimize effort predictions in software project management
-
S. G. MacDonell and M. J. Shepperd, Combining techniques to optimize effort predictions in software project management, Journal of Systems and Software 66(2) (2003) 91-98.
-
(2003)
Journal of Systems and Software
, vol.66
, Issue.2
, pp. 91-98
-
-
MacDonell, S.G.1
Shepperd, M.J.2
-
21
-
-
27644439483
-
A comparison of software project overruns- flexible versus sequential development models
-
K. Molokken-Ostvold and M. Jorgensen, A comparison of software project overruns- flexible versus sequential development models, IEEE Transactions on Software Engineering 31(9) (2005) 754-766.
-
(2005)
IEEE Transactions on Software Engineering
, vol.31
, Issue.9
, pp. 754-766
-
-
Molokken-Ostvold, K.1
Jorgensen, M.2
-
22
-
-
14844303750
-
A survey on software estimation in the norwegian industry in software metrics 2004
-
IEEE
-
K. Moløkken-Østvold, M. Jørgensen, S. S. Tanilkan, H. Gallis, A. C. Lien and S. W. Hove, A survey on software estimation in the Norwegian industry, in Software Metrics, 2004. Proc. 10th International Symposium on, IEEE, 2004, pp. 208-219.
-
(2004)
Proc. 10th International Symposium on
, pp. 208-219
-
-
Moløkken-ØStvold, K.1
Jørgensen, M.2
Tanilkan, S.S.3
Gallis, H.4
Lien, A.C.5
Hove, S.W.6
-
25
-
-
47949099831
-
Cognitive limits of software cost estimation
-
First International Symposium on, IEEE
-
R. Valerdi, Cognitive limits of software cost estimation, in Empirical Software Engineering and Measurement, 2007 (ESEM 2007). First International Symposium on, pp. 117-125. IEEE, 2007.
-
(2007)
Empirical Software Engineering and Measurement, 2007 (ESEM 2007)
, pp. 117-125
-
-
Valerdi, R.1
-
26
-
-
0026170795
-
Why is software late? An empirical study of reasons for delay in software development
-
M. Van Genuchten, Why is software late? an empirical study of reasons for delay in software development, IEEE Transactions on Software Engineering 17(6) (1991) 582-590.
-
(1991)
IEEE Transactions on Software Engineering
, vol.17
, Issue.6
, pp. 582-590
-
-
Van Genuchten, M.1
|