메뉴 건너뛰기




Volumn 28, Issue 3, 2013, Pages 2808-2818

Enhancing the dispatchability of variable wind generation by coordination with pumped-storage hydro units in stochastic power systems

Author keywords

Hourly coordination; pumped storage hydro units; stochastic security constrained unit commitment; wind energy

Indexed keywords

DAY-AHEAD SCHEDULING; ELECTRICITY MARKET; HOURLY COORDINATION; OPERATION STRATEGY; POWER SYSTEM OPERATORS; PUMPED-STORAGE HYDRO; SECURITY CONSTRAINED UNIT COMMITMENT; THERMAL POWER GENERATION;

EID: 84880918746     PISSN: 08858950     EISSN: None     Source Type: Journal    
DOI: 10.1109/TPWRS.2013.2242099     Document Type: Article
Times cited : (172)

References (23)
  • 1
    • 16244369142 scopus 로고    scopus 로고
    • Commercial successes in power storage
    • DOI 10.1109/MPAE.2005.1405867
    • B. Roberts and J. McDowall, "Commercial successes in power storage," IEEE Power and Energy Mag., vol. 3, no. 2, pp. 24-30, Mar.-Apr. 2005. (Pubitemid 40448908)
    • (2005) IEEE Power and Energy Magazine , vol.3 , Issue.2 , pp. 24-30
    • Roberts, B.1    McDowall, J.2
  • 2
    • 4043146595 scopus 로고    scopus 로고
    • Operation and sizing of energy storage for wind power plants in a market system
    • Sevilla, Spain, Jun.
    • M. Korpas, R. Hildrum, and A. T. Holen, "Operation and sizing of energy storage for wind power plants in a market system," in Proc. 14th PSCC, Sevilla, Spain, Jun. 2002.
    • (2002) Proc. 14th PSCC
    • Korpas, M.1    Hildrum, R.2    Holen, A.T.3
  • 3
    • 77957009056 scopus 로고    scopus 로고
    • A wind-hydro-pumped storage station leading to high res penetration in the autonomous island system of Ikaria
    • Oct
    • V. Papaefthymiou, E. G. Karamanou, S. A. Papathanassiou, and M. P. Papadopoulos, "A wind-hydro-pumped storage station leading to high res penetration in the autonomous island system of Ikaria," IEEE Trans. Sustain. Energy, vol. 1, no. 3, pp. 163-172, Oct. 2010.
    • (2010) IEEE Trans. Sustain. Energy , vol.1 , Issue.3 , pp. 163-172
    • Papaefthymiou, V.1    Karamanou, E.G.2    Papathanassiou, S.A.3    Papadopoulos, M.P.4
  • 4
    • 79959916706 scopus 로고    scopus 로고
    • Simulation and optimization of hybrid windsolar - Pumped storage power system
    • Wuhan, China, Apr.
    • R. Yen and L. Yanpin, "Simulation and optimization of hybrid windsolar- pumped storage power system," in Proc. Electric Information and Control Engineering, Wuhan, China, Apr. 2011, pp. 729-733.
    • (2011) Proc. Electric Information and Control Engineering , pp. 729-733
    • Yen, R.1    Yanpin, L.2
  • 5
    • 0037292301 scopus 로고    scopus 로고
    • Energy and reserve market design with explicit consideration to lost opportunity costs
    • Feb
    • D. Gan and E. Litvinov, "Energy and reserve market design with explicit consideration to lost opportunity costs," IEEE Trans. Power Syst., vol. 18, no. 1, pp. 53-59, Feb. 2003.
    • (2003) IEEE Trans. Power Syst. , vol.18 , Issue.1 , pp. 53-59
    • Gan, D.1    Litvinov, E.2
  • 7
    • 70349183734 scopus 로고    scopus 로고
    • Impact of load forecast uncertainty on LMP
    • Mar. , May 2012
    • R. Bo and F. Li, "Impact of load forecast uncertainty on LMP," in Proc. Power System Conf. Expo., Mar. 2009, May 2012, pp. 1-6.
    • (2009) Proc. Power System Conf. Expo. , pp. 1-6
    • Bo, R.1    Li, F.2
  • 11
    • 14544296200 scopus 로고    scopus 로고
    • Simulation of wind speed forecast errors for operation planning of multiarea power systems
    • Sep. 12-16
    • L. Söder, "Simulation of wind speed forecast errors for operation planning of multiarea power systems," in Proc. 2004 Int. Conf. Probabilistic Methods Applied to Power Systems, Sep. 12-16, 2004, pp. 723-728.
    • (2004) Proc. 2004 Int. Conf. Probabilistic Methods Applied to Power Systems , pp. 723-728
    • Söder, L.1
  • 16
    • 34248512634 scopus 로고    scopus 로고
    • Stochastic security-constrained unit commitment
    • DOI 10.1109/TPWRS.2007.894843
    • L. Wu, M. Shahidehpour, and T. Li, "Stochastic security-constrained unit commitment," IEEE Trans. Power Syst., vol. 22, no. 2, pp. 800-811, May 2007. (Pubitemid 46746244)
    • (2007) IEEE Transactions on Power Systems , vol.22 , Issue.2 , pp. 800-811
    • Wu, L.1    Shahidehpour, M.2    Li, T.3
  • 17
    • 70350512842 scopus 로고    scopus 로고
    • GENCO's risk-constrained hydrothermal scheduling
    • Nov
    • L. Wu, M. Shahidehpour, and Z. Li, "GENCO's risk-constrained hydrothermal scheduling," IEEE Trans. Power Syst., vol. 23, no. 4, pp. 1847-1858, Nov. 2008.
    • (2008) IEEE Trans. Power Syst. , vol.23 , Issue.4 , pp. 1847-1858
    • Wu, L.1    Shahidehpour, M.2    Li, Z.3
  • 18
    • 33751071102 scopus 로고    scopus 로고
    • Scenario reduction in stochastic programming An approach using probability metrics
    • DOI 10.1007/s10107-002-0331-0
    • J. Dupacová, N. Gröwe-Kuska, and W. Römisch, "Scenario reduction in stochastic programming: An approach using probability metrics," Math. Program., vol. A95, pp. 493-511, 2003. (Pubitemid 44769765)
    • (2003) Mathematical Programming, Series B , vol.95 , Issue.3 , pp. 493-511
    • Dupacova, J.1    Growe-Kuska, N.2    Romisch, W.3
  • 19
    • 84880924277 scopus 로고    scopus 로고
    • [Online]
    • GAMS/SCENRED Documentation. [Online]. Available: http://www.gams.com/dd/ docs/solvers/scenred.pdf.
    • GAMSSCENRED Documentation
  • 20
    • 24944563890 scopus 로고    scopus 로고
    • Security-constrained unit commitment with ac constraints
    • DOI 10.1109/TPWRS.2005.854375
    • Y. Fu, M. Shahidehpour, and Z. Li, "Security-constrained unit commitment with AC constraints," IEEE Trans. Power Syst., vol. 20, no. 3, pp. 1538-1550, Aug. 2005. (Pubitemid 41300968)
    • (2005) IEEE Transactions on Power Systems , vol.20 , Issue.3 , pp. 1538-1550
    • Fu, Y.1    Shahidehpour, M.2    Li, Z.3
  • 21
    • 74949119272 scopus 로고    scopus 로고
    • Dispatch of head dependent hydro units: Modeling of optimal generation in electricity market
    • Jun.
    • S. Mariano, M. Calado, and L. Ferreira, "Dispatch of head dependent hydro units: modeling of optimal generation in electricity market," in Proc. IEEE Power Tech 2009 Bucharest, Jun. 2009.
    • (2009) Proc. IEEE Power Tech 2009 Bucharest
    • Mariano, S.1    Calado, M.2    Ferreira, L.3
  • 22
    • 0028426230 scopus 로고
    • Optimization-based scheduling of hydrothermal power systems with pumped storage units
    • May
    • X. Guan, P. B. Luh, and H. Yan, "Optimization-based scheduling of hydrothermal power systems with pumped storage units," IEEE Trans. Power Syst., vol. 9, no. 2, pp. 1023-1031, May 1994.
    • (1994) IEEE Trans. Power Syst. , vol.9 , Issue.2 , pp. 1023-1031
    • Guan, X.1    Luh, P.B.2    Yan, H.3
  • 23
    • 0029352926 scopus 로고
    • Stochastic Hopfield artificial neural network for electrical power production costing
    • Aug
    • V. B. A. Kasangaki, H. M. Sendaula, and S. K. Biswas, "Stochastic Hopfield artificial neural network for electrical power production costing," IEEE Trans. Power Syst., vol. 10, no. 3, pp. 1525-1533, Aug. 1995.
    • (1995) IEEE Trans. Power Syst. , vol.10 , Issue.3 , pp. 1525-1533
    • Kasangaki, V.B.A.1    Sendaula, H.M.2    Biswas, S.K.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.