메뉴 건너뛰기




Volumn 2, Issue , 1999, Pages 1022-1029

An iterative sampling procedure for resource constrained project

Author keywords

[No Author keywords available]

Indexed keywords

COMPARATIVE PERFORMANCE ANALYSIS; CONFLICT RESOLUTION; GENERALIZED PRECEDENCE RELATIONS; OPTIMIZATION PROBLEMS; RESOURCE CONSTRAINED SCHEDULING; RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM; SAMPLING PROCEDURES; STATE-OF-THE-ART PROCEDURES;

EID: 84880684460     PISSN: 10450823     EISSN: None     Source Type: Conference Proceeding    
DOI: None     Document Type: Conference Paper
Times cited : (13)

References (17)
  • 1
  • 5
    • 0031517380 scopus 로고    scopus 로고
    • Applying constraint satisfaction techniques to job shop scheduling
    • C. Cheng and S.F. Smith. Applying Constraint Satisfaction Techniques to Job Shop Scheduling. Annals of Operations Research, 70:327-357, 1997. (Pubitemid 127429163)
    • (1997) Annals of Operations Research , vol.70 , pp. 327-357
    • Cheng, C.-C.1    Smith, S.F.2
  • 6
    • 0032210246 scopus 로고    scopus 로고
    • A Branch-and-Bound Procedure for the Resource-Constrained Project Scheduling Problem with Generalized Precedence Relations
    • to appear
    • B. De Reyck and W. Herroelen. A Branch-and-Bound Procedure for the Resource-Constrained Project Scheduling Problem with Generalized Precedence Relations. European Journal on Operations Research, 1998. to appear.
    • (1998) European Journal on Operations Research
    • De Reyck, B.1    Herroelen, W.2
  • 13
    • 0030125477 scopus 로고    scopus 로고
    • A Computational Study of Constraint Satisfaction for Multiple Capacitated Job Shop Scheduling
    • W.P.M. Nuijten and E.H.L. Aarts. A Computational Study of Constraint Satisfaction for Multiple Capacitated Job Shop Scheduling. European Journal of Operational Research, 90(2):269 284, 1996.
    • (1996) European Journal of Operational Research , vol.90 , Issue.2 , pp. 269284
    • Nuijten, W.P.M.1    Aarts, E.H.L.2
  • 14
    • 0032014495 scopus 로고    scopus 로고
    • Constraint-Based Job Shop Scheduling with ILOG-SCHEDULER
    • W.P.M. Nuijten and C. Le Pape. Constraint-Based Job Shop Scheduling with ILOG-SCHEDULER. Journal of Heuristics, 3:271 286, 1998.
    • (1998) Journal of Heuristics , vol.3 , pp. 271-286
    • Nuijten, W.P.M.1    Le Pape, C.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.