메뉴 건너뛰기




Volumn 51, Issue 12, 2013, Pages 3501-3515

Hybrid firefly-simulated annealing algorithm for the flow shop problem with learning effects and flexible maintenance activities

Author keywords

availability constraint; heuristic method; hybrid firefly simulated annealing algorithm; learning effect; non permutation flow shop; scheduling; Taguchi method

Indexed keywords

ANNEALING ALGORITHM; AVAILABILITY CONSTRAINTS; COMPUTATIONAL RESULTS; FLOW SHOP SCHEDULING PROBLEM; FLOW-SHOPS; LEARNING EFFECTS; MIXED INTEGER LINEAR PROGRAMMING MODEL; SIMULATED ANNEALING ALGORITHMS;

EID: 84880246100     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207543.2012.750771     Document Type: Article
Times cited : (58)

References (34)
  • 1
    • 27644520542 scopus 로고    scopus 로고
    • Flow shop scheduling problem with limited machine availability: A heuristic approach
    • Aggoune, R., and M.-C. Portmann. 2006. "Flow shop scheduling problem with limited machine availability: A heuristic approach." International Journal of Production Economics 99 (1-2): 4-15
    • (2006) International Journal of Production Economics , vol.99 , Issue.1-2 , pp. 4-15
    • Aggoune, R.1    Portmann, M.-C.2
  • 2
    • 0242658501 scopus 로고    scopus 로고
    • Minimizing the makespan for the flow shop scheduling problem with availability constraints
    • Aggoune, R. 2004. "Minimizing the makespan for the flow shop scheduling problem with availability constraints." European Journal of Operational Research 153 (3): 534-543
    • (2004) European Journal of Operational Research , vol.153 , Issue.3 , pp. 534-543
    • Aggoune, R.1
  • 4
    • 84455194528 scopus 로고    scopus 로고
    • Application of particle swarm optimization and simulated annealing algorithms in flow shop scheduling problem under linear deterioration
    • Bank, M., S.M.T. Fatemi Ghomi, F. Jolai, and J. Behnamian. 2012. "Application of particle swarm optimization and simulated annealing algorithms in flow shop scheduling problem under linear deterioration." Advances in Engineering Software 47 (1): 1-6
    • (2012) Advances in Engineering Software , vol.47 , Issue.1 , pp. 1-6
    • Bank, M.1    Fatemi Ghomi, S.M.T.2    Jolai, F.3    Behnamian, J.4
  • 5
    • 80052999268 scopus 로고    scopus 로고
    • No-wait scheduling of a two-machine flow-shop to minimize the makespan under non-Availability constraints and different release dates
    • Ben Chihaoui, F., I. Kacem, A.B. Hadj-Alouane, N. Dridi, and N. Rezg. 2011. "No-wait scheduling of a two-machine flow-shop to minimize the makespan under non-Availability constraints and different release dates." International Journal of Production Research 49 (21): 6273-6286
    • (2011) International Journal of Production Research , vol.49 , Issue.21 , pp. 6273-6286
    • Ben Chihaoui, F.1    Kacem, I.2    Hadj-Alouane, A.B.3    Dridi, N.4    Rezg, N.5
  • 6
    • 0345201636 scopus 로고    scopus 로고
    • Single-machine scheduling with learning considerations
    • Biskup, D. 1999. "Single-machine scheduling with learning considerations." European Journal of Operational Research 115 (1): 173-178
    • (1999) European Journal of Operational Research , vol.115 , Issue.1 , pp. 173-178
    • Biskup, D.1
  • 7
    • 38149027740 scopus 로고    scopus 로고
    • A state-Of-The-Art review on scheduling with learning effects
    • Biskup, D. 2008. "A state-Of-The-Art review on scheduling with learning effects." European Journal of Operational Research 188 (2): 315-329
    • (2008) European Journal of Operational Research , vol.188 , Issue.2 , pp. 315-329
    • Biskup, D.1
  • 8
    • 41449089275 scopus 로고    scopus 로고
    • Some scheduling problems with deteriorating jobs and learning effects
    • Cheng, T.C.E., C.-C. Wu, and W.-C. Lee. 2008. "Some scheduling problems with deteriorating jobs and learning effects." Computers and Industrial Engineering 54 (4): 972-982
    • (2008) Computers and Industrial Engineering , vol.54 , Issue.4 , pp. 972-982
    • Cheng, T.C.E.1    Wu, C.-C.2    Lee, W.-C.3
  • 9
    • 79960972998 scopus 로고    scopus 로고
    • Makespan minimization for m-machine permutation flowshop scheduling problem with learning considerations
    • Chung, Y.-H., and L.-I. Tong. 2011. "Makespan minimization for m-machine permutation flowshop scheduling problem with learning considerations." International Journal of Advanced Manufacturing Technology 56 (1-4): 355-367
    • (2011) International Journal of Advanced Manufacturing Technology , vol.56 , Issue.1-4 , pp. 355-367
    • Chung, Y.-H.1    Tong, L.-I.2
  • 11
    • 77957696176 scopus 로고    scopus 로고
    • Solving a single-machine scheduling problem with maintenance, job deterioration and learning effect by simulated annealing
    • Ghodratnama, A., M. Rabbani, R. Tavakkoli-Moghaddam, and A. Baboli. 2010. "Solving a single-machine scheduling problem with maintenance, job deterioration and learning effect by simulated annealing." Journal of Manufacturing Systems 29 (1): 1-9
    • (2010) Journal of Manufacturing Systems , vol.29 , Issue.1 , pp. 1-9
    • Ghodratnama, A.1    Rabbani, M.2    Tavakkoli-Moghaddam, R.3    Baboli, A.4
  • 12
  • 13
    • 26444479778 scopus 로고
    • Optimization by simulated annealing
    • Kirkpatrick, S., C.D. Gelatt, and M.P. Vecchi. 1983. "Optimization by simulated annealing." Science 220 (4598): 671-680
    • (1983) Science , vol.220 , Issue.4598 , pp. 671-680
    • Kirkpatrick, S.1    Gelatt, C.D.2    Vecchi, M.P.3
  • 14
    • 69549116446 scopus 로고    scopus 로고
    • Some single-machine and m-machine flowshop scheduling problems with learning considerations
    • Lee, W.-C., and C.-C. Wu. 2009. "Some single-machine and m-machine flowshop scheduling problems with learning considerations." Information Sciences 179 (22): 3885-3892
    • (2009) Information Sciences , vol.179 , Issue.22 , pp. 3885-3892
    • Lee, W.-C.1    Wu, C.-C.2
  • 15
    • 57049116045 scopus 로고    scopus 로고
    • Applying a hybrid simulated annealing and tabu search approach to non-permutation flowshop scheduling problems
    • Lin, S.-W., and K.-C. Ying. 2009. "Applying a hybrid simulated annealing and tabu search approach to non-permutation flowshop scheduling problems." International Journal of Production Research 47 (5): 1411-1424
    • (2009) International Journal of Production Research , vol.47 , Issue.5 , pp. 1411-1424
    • Lin, S.-W.1    Ying, K.-C.2
  • 16
    • 76349087153 scopus 로고    scopus 로고
    • A survey of scheduling with deterministic machine availability constraints
    • Ma, Y., C. Chu, and C. Zuo. 2010. "A survey of scheduling with deterministic machine availability constraints." Computers and Industrial Engineering 58 (2): 199-211
    • (2010) Computers and Industrial Engineering , vol.58 , Issue.2 , pp. 199-211
    • Ma, Y.1    Chu, C.2    Zuo, C.3
  • 17
    • 0020699921 scopus 로고
    • A heuristic algorithm for the m-machine, n-job flowshop sequencing problem
    • Nawaz, M., E.E. Enscore, and I. Ham. 1983. "A heuristic algorithm for the m-machine, n-job flowshop sequencing problem." Omega 11: 91-95
    • (1983) Omega , vol.11 , pp. 91-95
    • Nawaz, M.1    Enscore, E.E.2    Ham, I.3
  • 18
    • 38249025037 scopus 로고
    • Simulated annealing for permutation flow-shop scheduling
    • Osman, I., and C. Potts. 1989. "Simulated annealing for permutation flow-shop scheduling." Omega 17 (6): 551-557
    • (1989) Omega , vol.17 , Issue.6 , pp. 551-557
    • Osman, I.1    Potts, C.2
  • 20
    • 62549108160 scopus 로고    scopus 로고
    • Scheduling permutation flowshops with initial availability constraint: Analysis of solutions and constructive heuristics
    • Perez-Gonzalez, P., and J. Framinan. 2009. "Scheduling permutation flowshops with initial availability constraint: Analysis of solutions and constructive heuristics." Computers and Operations Research 36 (10): 2866-2876
    • (2009) Computers and Operations Research , vol.36 , Issue.10 , pp. 2866-2876
    • Perez-Gonzalez, P.1    Framinan, J.2
  • 22
    • 78049530061 scopus 로고    scopus 로고
    • A hybrid method for flowshops scheduling with condition-based maintenance constraint and machines breakdown
    • Safari, E., and S.J. Sadjadi. 2011. "A hybrid method for flowshops scheduling with condition-based maintenance constraint and machines breakdown." Expert Systems with Applications 38 (3): 2020-2029
    • (2011) Expert Systems with Applications , vol.38 , Issue.3 , pp. 2020-2029
    • Safari, E.1    Sadjadi, S.J.2
  • 23
    • 79960566619 scopus 로고    scopus 로고
    • A discrete firefly meta-heuristic with local search for makespan minimization in permutation flow shop scheduling problems
    • Sayadi, M.K., R. Ramezanian, and N. Ghaffari-Nasab. 2010. "A discrete firefly meta-heuristic with local search for makespan minimization in permutation flow shop scheduling problems." Int. J. of Industrial Engineering Computations 1 (1): 1-10
    • (2010) Int. J. of Industrial Engineering Computations , vol.1 , Issue.1 , pp. 1-10
    • Sayadi, M.K.1    Ramezanian, R.2    Ghaffari-Nasab, N.3
  • 24
    • 0343963100 scopus 로고    scopus 로고
    • Scheduling with limited machine availability
    • Schmidt, G. 2000. "Scheduling with limited machine availability." European Journal of Operational Research 121 (1): 1-15
    • (2000) European Journal of Operational Research , vol.121 , Issue.1 , pp. 1-15
    • Schmidt, G.1
  • 25
    • 82955165759 scopus 로고    scopus 로고
    • Worst-case analysis for flow shop scheduling problems with an exponential learning effect
    • Wang, J.-B., and M.-Z. Wang. 2012. "Worst-case analysis for flow shop scheduling problems with an exponential learning effect." Journal of the Operational Research Society 63 (1): 130-137
    • (2012) Journal of the Operational Research Society , vol.63 , Issue.1 , pp. 130-137
    • Wang, J.-B.1    Wang, M.-Z.2
  • 27
    • 33749005938 scopus 로고    scopus 로고
    • A note on scheduling problems with learning effects and deteriorating jobs
    • Wang, J.-B. 2006. "A note on scheduling problems with learning effects and deteriorating jobs." International Journal of Systems Science 37 (12): 827-833
    • (2006) International Journal of Systems Science , vol.37 , Issue.12 , pp. 827-833
    • Wang, J.-B.1
  • 28
    • 34250846679 scopus 로고    scopus 로고
    • A note on single-machine scheduling with learning effect and an availability constraint
    • Wu, C.-C., and W.-C. Lee. 2007. "A note on single-machine scheduling with learning effect and an availability constraint." International Journal of Advanced Manufacturing Technology 33 (5-6): 540-544
    • (2007) International Journal of Advanced Manufacturing Technology , vol.33 , Issue.5-6 , pp. 540-544
    • Wu, C.-C.1    Lee, W.-C.2
  • 29
    • 51049094449 scopus 로고    scopus 로고
    • A note on the total completion time problem in a permutation flowshop with a learning effect
    • Wu, C.-C., and W.-C. Lee. 2009a. "A note on the total completion time problem in a permutation flowshop with a learning effect." European Journal of Operational Research 192 (1): 343-347
    • (2009) European Journal of Operational Research , vol.192 , Issue.1 , pp. 343-347
    • Wu, C.-C.1    Lee, W.-C.2
  • 30
    • 67349243757 scopus 로고    scopus 로고
    • Single-machine and flowshop scheduling with a general learning effect model
    • Wu, C.-C., and W.-C. Lee. 2009b. "Single-machine and flowshop scheduling with a general learning effect model." Computers and Industrial Engineering 56 (4): 1553-1558
    • (2009) Computers and Industrial Engineering , vol.56 , Issue.4 , pp. 1553-1558
    • Wu, C.-C.1    Lee, W.-C.2
  • 32
    • 78049316679 scopus 로고    scopus 로고
    • Single-machine scheduling problems with both start-Time dependent learning and position dependent aging effects under deteriorating maintenance consideration
    • Yang, S.-J. 2010. "Single-machine scheduling problems with both start-Time dependent learning and position dependent aging effects under deteriorating maintenance consideration." Applied Mathematics and Computation 217 (7): 3321-3329
    • (2010) Applied Mathematics and Computation , vol.217 , Issue.7 , pp. 3321-3329
    • Yang, S.-J.1
  • 33
    • 79961051725 scopus 로고    scopus 로고
    • Nature-inspired metaheuristic algorithms
    • Luniver Press. Yang, X.-S. 2009. Firefly algorithms for multimodal optimization SAGA, Lecture Notes in Computer Sciences
    • Yang, X.S., 2008. Nature-inspired metaheuristic algorithms. Luniver Press. Yang, X.-S. 2009. "Firefly algorithms for multimodal optimization." Stochastic Algorithms: Foundations and Applications, SAGA, Lecture Notes in Computer Sciences 5792: 169-178
    • (2008) Stochastic Algorithms: Foundations and Applications , vol.5792 , pp. 169-178
    • Yang, X.S.1
  • 34
    • 67349130285 scopus 로고    scopus 로고
    • Some scheduling problems with general position-Dependent and time-Dependent learning effects
    • Yin, Y., D. Xu, K. Sun, and H. Li. 2009. "Some scheduling problems with general position-Dependent and time-Dependent learning effects." Information Sciences 179 (14): 2416-2425
    • (2009) Information Sciences , vol.179 , Issue.14 , pp. 2416-2425
    • Yin, Y.1    Xu, D.2    Sun, K.3    Li, H.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.