-
1
-
-
23344444777
-
-
AA. Garcia, R. Schirru, & PF. Melo., "A fuzzy DEA approach for FMEA," Profess in Nuclear Energy 46(3-4):359-373 (2005) .
-
(2005)
A Fuzzy DEA Approach for FMEA Profess in Nuclear Energy
, vol.46
, Issue.3-4
, pp. 359-373
-
-
Garcia, A.A.1
Schirru, R.2
Melo, P.F.3
-
2
-
-
51849154728
-
Development of a fuzzy FMEA based product design system
-
K S. Chin, A. Chan, & J. B. Yang., "Development of a fuzzy FMEA based product design system," International Journal of Advanced Manufacturing Technology, 36, 633-649 (2008).
-
(2008)
International Journal of Advanced Manufacturing Technology
, vol.36
, pp. 633-649
-
-
Chin, K.S.1
Chan, J.B.2
Yang, A.3
-
3
-
-
0035840765
-
A new approach for evaluation of risk priorities of failure modes in FMEA
-
F. Franceschini, & M. Galetto, "A new approach for evaluation of risk priorities of failure modes in FMEA," Int J Prod Res 39 (13):2991-3002 (2001)..
-
(2001)
Int J Prod Res
, vol.39
, Issue.13
, pp. 2991-3002
-
-
Franceschini, F.1
Galetto, M.2
-
4
-
-
10644279458
-
-
John Wiley & ons.,New York, US
-
R. Rausand, & A. Hoyland, "System Reliability Theory-Models and Statistical Methods," John Wiley & ons.,New York, US., 2004.
-
(2004)
System Reliability Theory-Models and Statistical Methods
-
-
Rausand, R.1
Hoyland, A.2
-
5
-
-
27144556954
-
Systematic failure mode effect analysis (FMEA) using fuzzy linguistic modeling
-
R. K. Sharma, D. Kumar, & P. Kumar,. "Systematic failure mode effect analysis (FMEA) using fuzzy linguistic modeling," International Journal of Quality and Reliability Management, 22(9), 986-1004 (2005).
-
(2005)
International Journal of Quality and Reliability Management
, vol.22
, Issue.9
, pp. 986-1004
-
-
Sharma, R.K.1
Kumar, D.2
Kumar, P.3
-
6
-
-
0002528746
-
Failure mode and effects analysis: An integrated approach for product design and process control
-
SH. Teng, & SY. HO, "Failure mode and effects analysis: an integrated approach for product design and process control," Int J Qual Reliab Manage 13(5):8-26 (1996)
-
(1996)
Int J Qual Reliab Manage
, vol.13
, Issue.5
, pp. 8-26
-
-
Teng, S.H.1
Ho, S.Y.2
-
7
-
-
58349118905
-
Risk evaluation of green components to hazardous substance using FMEA and FAHP
-
A. H. Hua, C.-W. Hsu, T.-C. Kuo, , & W.-C. Wua,," Risk evaluation of green components to hazardous substance using FMEA and FAHP,". Expert Systems with Applications, 36, 7142-7147 (2009).
-
(2009)
Expert Systems with Applications
, vol.36
, pp. 7142-7147
-
-
Hua, A.H.1
Hsu, C.-W.2
Kuo, T.-C.3
Wua, W.-C.4
-
10
-
-
6344270169
-
An assessment of PRN prioritization in a failure modes effects and criticality analysis
-
J. B. Bowles.,." An assessment of PRN prioritization in a failure modes effects and criticality analysis," Journal of the IEST, 47, 51-56, (2004).
-
(2004)
Journal of the IEST
, vol.47
, pp. 51-56
-
-
Bowles, J.B.1
-
11
-
-
33748305597
-
Fuzzy FMEA with a guided rules reduction system for prioritization of failures
-
K. M. Tay, & C. P. Lim,." Fuzzy FMEA with a guided rules reduction system for prioritization of failures," International Journal of Quality and Reliability Management, 23(8), 1047-1066 (2006).
-
(2006)
International Journal of Quality and Reliability Management
, vol.23
, Issue.8
, pp. 1047-1066
-
-
Tay, K.M.1
Lim, C.P.2
-
12
-
-
0032186949
-
Failure mode and effects analysis of complex engineering systems using functional models
-
PG. Hawkins, DJ. Woollons,." Failure mode and effects analysis of complex engineering systems using functional models". Artificial Intelligence Engineering. 12:375-397 (1998).
-
(1998)
Artificial Intelligence Engineering
, vol.12
, pp. 375-397
-
-
Hawkins, P.G.1
Woollons, D.J.2
-
13
-
-
0242333107
-
An approach based on fuzzy sets for manufacturing system design
-
D. Gien, S. Jacqmart, , A. Seklouli & M. Barad.,. "An approach based on fuzzy sets for manufacturing system design," Int J Prod Res 41(2):315-335 (2003).
-
(2003)
Int J Prod Res
, vol.41
, Issue.2
, pp. 315-335
-
-
Gien, D.1
Jacqmart, S.2
Seklouli, A.3
Barad, M.4
-
14
-
-
1542617837
-
Aspects of decision support in water management -example Berlin and Postdam (Germany) I, spacially differenciated evaluation
-
U. Simon, Bruggmann, R. S. Buden.,."Aspects of decision support in water management -example Berlin and postdam (Germany) I, spacially differenciated evaluation," water research 38 (2004).
-
(2004)
Water Research
, vol.38
-
-
Simon, U.1
Buden, S.B.R.2
-
16
-
-
0008655878
-
The PROMETHEE VI procedure. How to differentiate hard from soft multicriteria problems
-
J P. Brans, & B. Mareschal.,."The PROMETHEE VI procedure. How to differentiate hard from soft multicriteria problems," Journal of Decision Systems 4, 213-223 (1995).
-
(1995)
Journal of Decision Systems
, vol.4
, pp. 213-223
-
-
Brans, J.P.1
Mareschal, B.2
-
18
-
-
0042513331
-
PROMETHEE V-MCDM problems with segmentation constraints
-
JP. Brans, & B. Mareschal., "PROMETHEE V-MCDM problems with segmentation constraints," INFOR 30 (2), 85-96 (1992).
-
(1992)
INFOR
, vol.30
, Issue.2
, pp. 85-96
-
-
Brans, J.P.1
Mareschal, B.2
-
19
-
-
0033745917
-
An extension of the PROMETHEE method for decision making in fuzzy environment: Ranking of alternative energy exploitation projects
-
M. Goumas, & V. Lygerou., "An extension of the PROMETHEE method for decision making in fuzzy environment: Ranking of alternative energy exploitation projects," European Journal of Operational Research, 123(3):606-613 (2000).
-
(2000)
European Journal of Operational Research
, vol.123
, Issue.3
, pp. 606-613
-
-
Goumas, M.1
Lygerou, V.2
-
20
-
-
0029635354
-
The conflictanalysis method -Bridging the gap between ELECTRE,PROMETHEE and ORESTE
-
G. Vanhuylenbroeck.,. "The conflictanalysis method -Bridging the gap between ELECTRE,PROMETHEE and ORESTE," European Journal of Operational Research, 82(3):490-502. G (1995).
-
(1995)
European Journal of Operational Research
, vol.82
, Issue.3
, pp. 490-502
-
-
Vanhuylenbroeck, G.1
|