-
2
-
-
78650777231
-
Climate change impact assessment and evaluation of agro-adaptation measures for rice production in Eastern India
-
Swain DK, Thomas D. Climate change impact assessment and evaluation of agro-adaptation measures for rice production in Eastern India. Journal of Environmental Informatics 2010; 16(2):94-101.
-
(2010)
Journal of Environmental Informatics
, vol.16
, Issue.2
, pp. 94-101
-
-
Swain, D.K.1
Thomas, D.2
-
4
-
-
34548724404
-
Fuzzy possibilistic model for mediumterm power generation planning with environmental criteria
-
Muela E, Schweickardt G, Garces F. Fuzzy possibilistic model for mediumterm power generation planning with environmental criteria. Energy Policy 2007; 35:5643-5655.
-
(2007)
Energy Policy
, vol.35
, pp. 5643-5655
-
-
Muela, E.1
Schweickardt, G.2
Garces, F.3
-
5
-
-
0004197396
-
Fundamentals of Fuzzy Sets
-
Dubois D, Prade H (eds.). In Kluwer Academic Publishers: Boston
-
Dubois D, Prade H (eds.). Fundamentals of Fuzzy Sets. In The Handbooks of Fuzzy Sets Series. Kluwer Academic Publishers: Boston, 2000.
-
(2000)
The Handbooks of Fuzzy Sets Series
-
-
-
6
-
-
0033361405
-
Minimax regret strategies for greenhouse gas abatement: methodology and application
-
Loulou R, Kanudia A. Minimax regret strategies for greenhouse gas abatement: methodology and application. Operations Research Letters 1999; 25:219-230.
-
(1999)
Operations Research Letters
, vol.25
, pp. 219-230
-
-
Loulou, R.1
Kanudia, A.2
-
10
-
-
77954163191
-
Potential of biomass-fired combined heat and power plants considering the spatial distribution of biomass supply and heat demand
-
Schmidt J, Leduc S, Dotzauer E, Kindermann G, Schmid E. Potential of biomass-fired combined heat and power plants considering the spatial distribution of biomass supply and heat demand. International Journal of Energy Research 2010; 34:970-985.
-
(2010)
International Journal of Energy Research
, vol.34
, pp. 970-985
-
-
Schmidt, J.1
Leduc, S.2
Dotzauer, E.3
Kindermann, G.4
Schmid, E.5
-
11
-
-
42049121081
-
A sustainable energy future: Construction of demand and renewable energy supply scenarios
-
Sørensen B. A sustainable energy future: Construction of demand and renewable energy supply scenarios. International Journal of Energy Research 2010; 32:436-470.
-
(2010)
International Journal of Energy Research
, vol.32
, pp. 436-470
-
-
Sørensen, B.1
-
12
-
-
78649882286
-
An interval fixed-mix stochastic programming method for greenhouse gas mitigation in energy systems under uncertainty
-
Xie YL, Li YP, Huang GH, Li YF. An interval fixed-mix stochastic programming method for greenhouse gas mitigation in energy systems under uncertainty. Energy 2010; 35(2):4627-4644.
-
(2010)
Energy
, vol.35
, Issue.2
, pp. 4627-4644
-
-
Xie, Y.L.1
Li, Y.P.2
Huang, G.H.3
Li, Y.F.4
-
13
-
-
78650772797
-
A fuzzy inference system prototype for indoor air and temperature quality monitoring and hazard detection
-
Tennakoon M, Mayorga RV, Shirif E. A fuzzy inference system prototype for indoor air and temperature quality monitoring and hazard detection. Journal of Environmental Informatics 2010; 16(2):70-79.
-
(2010)
Journal of Environmental Informatics
, vol.16
, Issue.2
, pp. 70-79
-
-
Tennakoon, M.1
Mayorga, R.V.2
Shirif, E.3
-
14
-
-
77954377305
-
An inexact transportation planning model for supporting vehicle emissions management
-
Yan XP, Ma XF, Huang GH, Wu CZ. An inexact transportation planning model for supporting vehicle emissions management. Journal of Environmental Informatics 2010; 15(2):87-98.
-
(2010)
Journal of Environmental Informatics
, vol.15
, Issue.2
, pp. 87-98
-
-
Yan, X.P.1
Ma, X.F.2
Huang, G.H.3
Wu, C.Z.4
-
15
-
-
17344363628
-
A two-stage planning model for power scheduling in a hydro-thermal system under uncertainty
-
Nürnberg R, Römisch W. A two-stage planning model for power scheduling in a hydro-thermal system under uncertainty. Optimization and Engineering 2002; 3:355-378.
-
(2002)
Optimization and Engineering
, vol.3
, pp. 355-378
-
-
Nürnberg, R.1
Römisch, W.2
-
16
-
-
0142090715
-
Financial Risk Management in the Planning of Energy Recovery in the Total Site
-
Bagajewicz M, Barbaro AF. Financial Risk Management in the Planning of Energy Recovery in the Total Site. Industrial and Engineering Chemistry Research 2003; 42(21):5239-5248.
-
(2003)
Industrial and Engineering Chemistry Research
, vol.42
, Issue.21
, pp. 5239-5248
-
-
Bagajewicz, M.1
Barbaro, A.F.2
-
18
-
-
18744410051
-
2 emissions in Greek manufacturing: Assessing the impact of a carbon tax
-
2 emissions in Greek manufacturing: Assessing the impact of a carbon tax. Energy Economics 2005; 27(3):387-413.
-
(2005)
Energy Economics
, vol.27
, Issue.3
, pp. 387-413
-
-
Floros, N.1
Vlachou, A.2
-
19
-
-
77950329738
-
An inexact two-stage stochastic energy systems planning model for managinggreenhouse gas emission at a municipal level
-
Lin QG, Huang GH. An inexact two-stage stochastic energy systems planning model for managinggreenhouse gas emission at a municipal level. Energy 2010; 35:2270-2280.
-
(2010)
Energy
, vol.35
, pp. 2270-2280
-
-
Lin, Q.G.1
Huang, G.H.2
-
20
-
-
71849108978
-
A two-stage inexact-stochastic programming model for planning carbon dioxide emission trading under uncertainty
-
Chen WT, Li YP, Huang GH, Chen X, Li YF. A two-stage inexact-stochastic programming model for planning carbon dioxide emission trading under uncertainty. Applied Energy 2010; 87:1033-1047.
-
(2010)
Applied Energy
, vol.87
, pp. 1033-1047
-
-
Chen, W.T.1
Li, Y.P.2
Huang, G.H.3
Chen, X.4
Li, Y.F.5
-
21
-
-
77954029125
-
Energy and environmental systems planning under uncertainty-An inexact fuzzy-stochastic programming approach
-
Li YF, Li YP, Huang GH, Chen X. Energy and environmental systems planning under uncertainty-An inexact fuzzy-stochastic programming approach. Applied Energy 2010; 87(10):3189-3211.
-
(2010)
Applied Energy
, vol.87
, Issue.10
, pp. 3189-3211
-
-
Li, Y.F.1
Li, Y.P.2
Huang, G.H.3
Chen, X.4
-
22
-
-
32044454425
-
Energy supply planning in Iran by using fuzzy linear programming approach (regarding uncertainties of investment costs)
-
Sadeghi M, Hosseini HM. Energy supply planning in Iran by using fuzzy linear programming approach (regarding uncertainties of investment costs). Energy Policy 2006; 34:993-1003.
-
(2006)
Energy Policy
, vol.34
, pp. 993-1003
-
-
Sadeghi, M.1
Hosseini, H.M.2
-
23
-
-
44649117461
-
A mathematical programming framework for energy planning in services' sector buildings under uncertainty in load demand: The case of a hospital in Athens
-
Mavrotas G, Diakoulaki D, Florios K, Georgiou P. A mathematical programming framework for energy planning in services' sector buildings under uncertainty in load demand: The case of a hospital in Athens. Energy Policy 2008; 36:2415-2429.
-
(2008)
Energy Policy
, vol.36
, pp. 2415-2429
-
-
Mavrotas, G.1
Diakoulaki, D.2
Florios, K.3
Georgiou, P.4
-
24
-
-
77649334753
-
Interval-parameter robust minimax-regret programming and its application to energy and environmental systems planning
-
Li YP, Huang GH, Chen X, Cheng SY. Interval-parameter robust minimax-regret programming and its application to energy and environmental systems planning. Energy Sources Part B 2009; 4(3):278-294.
-
(2009)
Energy Sources Part B
, vol.4
, Issue.3
, pp. 278-294
-
-
Li, Y.P.1
Huang, G.H.2
Chen, X.3
Cheng, S.Y.4
-
26
-
-
41749091114
-
Interval-parameter two-stage stochastic nonlinear programming for water resources management under uncertainty
-
Li YP, Huang GH. Interval-parameter two-stage stochastic nonlinear programming for water resources management under uncertainty. Water Resources Management 2008; 22(6):681-698.
-
(2008)
Water Resources Management
, vol.22
, Issue.6
, pp. 681-698
-
-
Li, Y.P.1
Huang, G.H.2
-
28
-
-
53549129522
-
Development of an optimization model for energy systems planning in the Region of Waterloo
-
Cai YP, Huang GH, Yang ZF, Lin QG, Tan G. Development of an optimization model for energy systems planning in the Region of Waterloo. International Journal of Energy Research 2008; 32(11):988-1005.
-
(2008)
International Journal of Energy Research
, vol.32
, Issue.11
, pp. 988-1005
-
-
Cai, Y.P.1
Huang, G.H.2
Yang, Z.F.3
Lin, Q.G.4
Tan, G.5
-
29
-
-
77950863790
-
Optimal energy planning models with carbon footprint constraints
-
Pekala ŁM, Tan RR, Foo DCY, Jezowski JM. Optimal energy planning models with carbon footprint constraints. Applied Energy 2010; 87:1903-1910.
-
(2010)
Applied Energy
, vol.87
, pp. 1903-1910
-
-
Pekala, Ł.1
Tan, R.R.2
Foo, D.C.Y.3
Jezowski, J.M.4
-
30
-
-
24944591345
-
How to achieve the Kyoto target in Belgium, modelling methodology and some results
-
ETE Working Paper 2000-2009, University Leuven (K.U. Leuven), CES. (Available from:
-
Proost S, Van Regemorter D. How to achieve the Kyoto target in Belgium, modelling methodology and some results. ETE Working Paper 2000-2009, University Leuven (K.U. Leuven), CES. 2000 (Available from: http://www.econ. kuleuven.be/ete/publications/)
-
(2000)
-
-
Proost, S.1
Van Regemorter, D.2
|