메뉴 건너뛰기




Volumn 2, Issue 1, 2012, Pages 70-73

Model based in-process monitoring with optical coherence tomography

Author keywords

In process monitoring; OCT; STEP AP242; System integration

Indexed keywords

DATA INTEGRATION; ELECTRONIC DATA INTERCHANGE; IMAGE PROCESSING; OPTICAL DATA PROCESSING; PROCESS CONTROL; PROCESS MONITORING; PRODUCTION; THICKNESS MEASUREMENT; TOMOGRAPHY; UNITS OF MEASUREMENT; WEB CRAWLER;

EID: 84879192557     PISSN: None     EISSN: 22128271     Source Type: Conference Proceeding    
DOI: 10.1016/j.procir.2012.05.042     Document Type: Conference Paper
Times cited : (3)

References (8)
  • 1
    • 82755177474 scopus 로고    scopus 로고
    • Multilayer: A large scale production of micro devices via new rolled multi material layered 3D shaping technology
    • Karlsruhe, Germany
    • Bredeau, S. and Federzoni, L., 2009. "Multilayer: a large scale production of micro devices via new rolled multi material layered 3D shaping technology," 4M/ICOMM 2009 Conference. Karlsruhe, Germany, p. 419-422.
    • (2009) 4M/ICOMM 2009 Conference , pp. 419-419
    • Bredeau, S.1    Federzoni, L.2
  • 3
    • 84857331392 scopus 로고    scopus 로고
    • Optical coherence tomography for quality assessment of embedded microchannels in alumina ceramic
    • Su, R., Kirillin, M., Ekberg, P. Roos, A., Sergeeva, E., Mattsson, L., 2012. Optical coherence tomography for quality assessment of embedded microchannels in alumina ceramic, Optics Express 20(4), p. 4603-4618.
    • (2012) Optics Express , vol.20 , Issue.4 , pp. 4603-4603
    • Su, R.1    Kirillin, M.2    Ekberg Roos, P.A.3    Sergeeva, E.4    Mattsson, L.5
  • 4
    • 77956619234 scopus 로고    scopus 로고
    • Automatic reconstruction of as-built building information models from laser-scanned point clouds: A review of related techniques
    • Tang, P., Huber, D., Akinci, B., Lipman, R., Lytle, A., 2010. Automatic reconstruction of as-built building information models from laser-scanned point clouds: A review of related techniques, Automation in Construction 19(7), p. 829-843.
    • (2010) Automation in Construction , vol.19 , Issue.7 , pp. 829-829
    • Tang, P.1    Huber, D.2    Akinci, B.3    Lipman, R.4    Lytle, A.5
  • 6
    • 0033895371 scopus 로고    scopus 로고
    • Overview of threedimensional shape measurement using optical methods
    • Chen, F., Brown, G., Song, M., 2000. Overview of threedimensional shape measurement using optical methods, Optical Engineering 39(1), p. 10-22.
    • (2000) Optical Engineering , vol.39 , Issue.1 , pp. 10-10
    • Chen, F.1    Brown, G.2    Song, M.3
  • 7
    • 0346487427 scopus 로고    scopus 로고
    • Information system integration
    • Hasselbring W., 2000. Information system integration, Communications of the ACM 43(6), p. 33-38.
    • (2000) Communications of the ACM , vol.43 , Issue.6 , pp. 33-33
    • Hasselbring, W.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.