메뉴 건너뛰기




Volumn 2, Issue , 2008, Pages 950-958

Analysis of freeway incident duration for atis applications

Author keywords

Incident duration; Incident management; Prediction model; Tree model

Indexed keywords

CLASSIFICATION TREES; INCIDENT DURATION; INCIDENT MANAGEMENT; MODEL DEVELOPMENT; PREDICTION ACCURACY; PREDICTION MODEL; PRELIMINARY ANALYSIS; TREE MODELS;

EID: 84879016999     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: None     Document Type: Conference Paper
Times cited : (12)

References (9)
  • 1
    • 0004059863 scopus 로고
    • Special Report 209: Highway Capacity Manual
    • Transportation Research Board (TRB), National Research Council, Washington, D.C.,
    • Transportation Research Board (TRB), Special Report 209: Highway Capacity Manual, National Research Council, Washington, D.C., 1994
    • (1994)
  • 2
    • 0023434259 scopus 로고
    • An Analysis of the Severity and Incident Duration of Truck-Involved Freeway Accidents
    • August
    • T. F. Golob, W. W. Recker, and J. D. Leonard, "An Analysis of the Severity and Incident Duration of Truck-Involved Freeway Accidents", Accident Analysis and Prevention, Vol. 19, No. 4, August 1987, pp. 375-395
    • (1987) Accident Analysis and Prevention , vol.19 , Issue.4 , pp. 375-395
    • Golob, T.F.1    Recker, W.W.2    Leonard, J.D.3
  • 3
    • 0033622790 scopus 로고    scopus 로고
    • An Exploratory Hazard-Based Analysis of Highway Incident Duration
    • D. Nam, and F. Mannering, "An Exploratory Hazard-Based Analysis of Highway Incident Duration", Transportation Research - A, Vol. 34A, No. 2, 2000, pp. 85-102
    • (2000) Transportation Research - A , vol.34 A , Issue.2 , pp. 85-102
    • Nam, D.1    Mannering, F.2
  • 4
    • 1842729655 scopus 로고    scopus 로고
    • Estimating Magnitude and Duration of Incident Delays
    • November/December
    • A. Garib, A. E. Radwan, and H. Al-Deek, "Estimating Magnitude and Duration of Incident Delays", Journal of Transportation Engineering, Vol. 123, No. 6, November/December 1997, pp. 459-466
    • (1997) Journal of Transportation Engineering , vol.123 , Issue.6 , pp. 459-466
    • Garib, A.1    Radwan, A.E.2    Al-deek, H.3
  • 5
    • 0042637847 scopus 로고
    • A Simple Time Sequential Procedure for Predicting Freeway Incident Duration
    • A. J. Khattak, J. L. Schofer, and M-H. Wang, "A Simple Time Sequential Procedure for Predicting Freeway Incident Duration", IVHS Journal, Vol. 2, No. 2, 1995, pp. 113-138
    • (1995) IVHS Journal , vol.2 , Issue.2 , pp. 113-138
    • Khattak, A.J.1    Schofer, J.L.2    Wang, M.-H.3
  • 6
    • 33845333239 scopus 로고    scopus 로고
    • Forecasting the Clearance Time of Freeway Accidents
    • Research Report, STL-2001-01, Center for Transportation Studies, University of Virginia, Charlottesville, VA
    • K. Smith, and B. Smith, "Forecasting the Clearance Time of Freeway Accidents", Research Report, STL-2001-01, Center for Transportation Studies, University of Virginia, Charlottesville, VA, 2001
    • (2001)
    • Smith, K.1    Smith, B.2
  • 7
    • 84894064067 scopus 로고    scopus 로고
    • Integration of a Discrete Choice Model and a Rule- Based System for Estimation of Incident Duration: a Case Study in Maryland
    • CD-ROM of Proceedings of the 83rd TRB Annual Meeting, Washington, D.C.
    • P-W. Lin, N. Zou, and G-L. Chang, "Integration of a Discrete Choice Model and a Rule- Based System for Estimation of Incident Duration: a Case Study in Maryland", CD-ROM of Proceedings of the 83rd TRB Annual Meeting, Washington, D.C., 2004
    • (2004)
    • Lin, P.-W.1    Zou, N.2    Chang, G.-L.3
  • 9
    • 33646019037 scopus 로고    scopus 로고
    • Statistics: Methods and Applications
    • T. Hill, and P. Lewicki, Statistics: Methods and Applications
    • Hill, T.1    Lewicki, P.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.