-
2
-
-
79955975745
-
The design of a market mechanism to allocate Air Traffic Flow Management slots
-
10.1016/j.trc.2010.06.003
-
10.1016/j.trc.2010.06.003 Castelli L. Pesenti R. Ranieri A. The design of a market mechanism to allocate Air Traffic Flow Management slots Transp. Res. C 2011 19 5 931-943
-
(2011)
Transp. Res. C
, vol.19
, Issue.5
, pp. 931-943
-
-
Castelli, L.1
Pesenti, R.2
Ranieri, A.3
-
7
-
-
0001700496
-
A review of conflict detection and resolution modeling methods
-
10.1109/6979.898217 1524-9050
-
10.1109/6979.898217 Kuchar J.K. Yang L.C. A review of conflict detection and resolution modeling methods IEEE Trans. Intell. Transp. Syst. 1524-9050 2000 4 1 179-189
-
(2000)
IEEE Trans. Intell. Transp. Syst.
, vol.4
, Issue.1
, pp. 179-189
-
-
Kuchar, J.K.1
Yang, L.C.2
-
8
-
-
79952959077
-
An integer optimization approach to large-scale air traffic flow management
-
10.1287/opre.1100.0899 0030-364X
-
10.1287/opre.1100.0899 Bertsimas D. Lulli G. Odoni A. An integer optimization approach to large-scale air traffic flow management Oper. Res. 0030-364X 2011 59 1 211-227
-
(2011)
Oper. Res.
, vol.59
, Issue.1
, pp. 211-227
-
-
Bertsimas, D.1
Lulli, G.2
Odoni, A.3
-
9
-
-
78651342824
-
Flight delay propagation impact on strategic air traffic flow management
-
10.3141/2177-13
-
10.3141/2177-13 Churchill A.M. Lovell D.J. Ball M.O. Flight delay propagation impact on strategic air traffic flow management Transp. Res. Rec. 2010 2177 105-113
-
(2010)
Transp. Res. Rec.
, vol.2177
, pp. 105-113
-
-
Churchill, A.M.1
Lovell, D.J.2
Ball, M.O.3
-
10
-
-
76249090985
-
Resource allocation in flow-constrained areas with stochastic termination times
-
10.3141/2106-11
-
10.3141/2106-11 Ganji M. Lovell D.J. Ball M.O. Nguyen A. Resource allocation in flow-constrained areas with stochastic termination times Transp. Res. Rec. 2009 2106 90-99
-
(2009)
Transp. Res. Rec.
, vol.2106
, pp. 90-99
-
-
Ganji, M.1
Lovell, D.J.2
Ball, M.O.3
Nguyen, A.4
-
14
-
-
18944396945
-
Scheduling aircraft using constraint satisfaction
-
10.1016/S1571-0661(04)80797-7 1571-0661
-
10.1016/S1571-0661(04)80797-7 van Leeuwen P. Hesselink H. Rohling J. Scheduling aircraft using constraint satisfaction Electron. Notes Theor. Comput. Sci. 1571-0661 2002 76 1-17
-
(2002)
Electron. Notes Theor. Comput. Sci.
, vol.76
, pp. 1-17
-
-
Van Leeuwen, P.1
Hesselink, H.2
Rohling, J.3
-
15
-
-
73349131078
-
Towards adaptive temporal planning at airports
-
0137-1223
-
van Leeuwen P. Oei L. Buzing P. Witteveen C. Towards adaptive temporal planning at airports Syst. Sci. 0137-1223 2008 34 4 67-77
-
(2008)
Syst. Sci.
, vol.34
, Issue.4
, pp. 67-77
-
-
Van Leeuwen, P.1
Oei, L.2
Buzing, P.3
Witteveen, C.4
-
17
-
-
71549158818
-
A tabu search algorithm for rerouting trains during rail operations
-
10.1016/j.trb.2009.05.004
-
10.1016/j.trb.2009.05.004 Corman F. D'Ariano A. Pacciarelli D. Pranzo M. A tabu search algorithm for rerouting trains during rail operations Transp. Res., B 2010 44 1 175-192
-
(2010)
Transp. Res., B
, vol.44
, Issue.1
, pp. 175-192
-
-
Corman, F.1
D'Ariano, A.2
Pacciarelli, D.3
Pranzo, M.4
-
18
-
-
70449635732
-
Reordering and local rerouting strategies to manage train traffic in real-time
-
10.1287/trsc.1080.0247 0041-1655
-
10.1287/trsc.1080.0247 D'Ariano A. Corman F. Pacciarelli D. Pranzo M. Reordering and local rerouting strategies to manage train traffic in real-time Transp. Sci. 0041-1655 2008 42 4 405-419
-
(2008)
Transp. Sci.
, vol.42
, Issue.4
, pp. 405-419
-
-
D'Ariano, A.1
Corman, F.2
Pacciarelli, D.3
Pranzo, M.4
-
19
-
-
0037121475
-
Job shop scheduling with blocking and no-wait constraints
-
10.1016/S0377-2217(01)00338-1 0377-2217
-
10.1016/S0377-2217(01)00338-1 Mascis A. Pacciarelli D. Job shop scheduling with blocking and no-wait constraints Eur. J. Oper. Res. 0377-2217 2002 143 3 498-517
-
(2002)
Eur. J. Oper. Res.
, vol.143
, Issue.3
, pp. 498-517
-
-
Mascis, A.1
Pacciarelli, D.2
-
20
-
-
33646551431
-
Scheduling models for air traffic control in terminal areas
-
10.1007/s10951-006-6779-7
-
10.1007/s10951-006-6779-7 Bianco L. Dell'Olmo P. Giordani S. Scheduling models for air traffic control in terminal areas J. Sched. 2006 9 3 180-197
-
(2006)
J. Sched.
, vol.9
, Issue.3
, pp. 180-197
-
-
Bianco, L.1
Dell'Olmo, P.2
Giordani, S.3
-
21
-
-
34249982545
-
A branch and bound algorithm for scheduling trains in a railway network
-
10.1016/j.ejor.2006.10.034 0377-2217
-
10.1016/j.ejor.2006.10.034 D'Ariano A. Pacciarelli D. Pranzo M. A branch and bound algorithm for scheduling trains in a railway network Eur. J. Oper. Res. 0377-2217 2007 183 2 643-657
-
(2007)
Eur. J. Oper. Res.
, vol.183
, Issue.2
, pp. 643-657
-
-
D'Ariano, A.1
Pacciarelli, D.2
Pranzo, M.3
|