메뉴 건너뛰기




Volumn 95, Issue 2, 2013, Pages 109-125

Mixed integer programming of generalized hydro-thermal self-scheduling of generating units

Author keywords

Dynamic ramp rate; Hydro thermal self scheduling; Mixed integer programming; Prohibited operating zones; Valve loading effect

Indexed keywords

MIXED-INTEGER PROGRAMMING; PROHIBITED OPERATING ZONE; RAMP RATES; SELF-SCHEDULING; VALVE LOADING EFFECTS;

EID: 84877921692     PISSN: 09487921     EISSN: 14320487     Source Type: Journal    
DOI: 10.1007/s00202-012-0246-6     Document Type: Article
Times cited : (34)

References (46)
  • 1
    • 0042566221 scopus 로고    scopus 로고
    • Long-term unit commitment optimization for large power systems: Unit decommitment versus advanced priority listing
    • 10.1016/S0306-2619(03)00057-6
    • Voorspools KR, D'haeseleer WD (2003) Long-term unit commitment optimization for large power systems: unit decommitment versus advanced priority listing. Appl Energy 76(1-3): 157-167
    • (2003) Appl Energy , vol.76 , Issue.1-3 , pp. 157-167
    • Voorspools, K.R.1    D'Haeseleer, W.D.2
  • 2
    • 0024001651 scopus 로고
    • Short-term thermal unit commitment-a new method
    • 10.1109/59.192892
    • Lee FN (1988) Short-term thermal unit commitment-a new method. IEEE Trans Power Syst 3(2): 421-428
    • (1988) IEEE Trans Power Syst , vol.3 , Issue.2 , pp. 421-428
    • Lee, F.N.1
  • 3
    • 0029409019 scopus 로고
    • Hydrothermal scheduling via extended differential dynamic programming and mixed coordination
    • 10.1109/59.476071
    • Tang J, Luh PB (1995) Hydrothermal scheduling via extended differential dynamic programming and mixed coordination. IEEE Trans Power Syst 10(4): 2021-2028
    • (1995) IEEE Trans Power Syst , vol.10 , Issue.4 , pp. 2021-2028
    • Tang, J.1    Luh, P.B.2
  • 5
    • 0032640594 scopus 로고    scopus 로고
    • Unit commitment with transmission security and voltage constraints
    • 10.1109/59.761909
    • Ma H, Shahidehpour SM (1999) Unit commitment with transmission security and voltage constraints. IEEE Trans Power Syst 14(2): 757-764
    • (1999) IEEE Trans Power Syst , vol.14 , Issue.2 , pp. 757-764
    • Ma, H.1    Shahidehpour, S.M.2
  • 6
    • 1942471788 scopus 로고    scopus 로고
    • Comparison of Lagrangian relaxation and truncated dynamic programming methods for solving hydrothermal coordination problems
    • Salam MS (2004) Comparison of Lagrangian relaxation and truncated dynamic programming methods for solving hydrothermal coordination problems. In: Proceedings of international conference on intelligent sensing and information processing, pp 265-270
    • (2004) Proceedings of International Conference on Intelligent Sensing and Information Processing , pp. 265-270
    • Salam, M.S.1
  • 7
    • 33646075166 scopus 로고    scopus 로고
    • Improving the B&B search for large-scale hydrothermal weekly scheduling problems
    • 10.1016/j.ijepes.2005.12.008
    • Parrilla E, Garcia-Gonzlez J (2006) Improving the B&B search for large-scale hydrothermal weekly scheduling problems. Int J Electr Power Energy Syst 28(5): 339-348
    • (2006) Int J Electr Power Energy Syst , vol.28 , Issue.5 , pp. 339-348
    • Parrilla, E.1    Garcia-Gonzlez, J.2
  • 8
    • 44649156381 scopus 로고    scopus 로고
    • Hydrothermal self-scheduling problem in a day-ahead electricity market
    • 10.1016/j.epsr.2008.02.002
    • Bisanovic S, Hajro M, Dlakic M (2008) Hydrothermal self-scheduling problem in a day-ahead electricity market. Electr Power Syst Res 78(9): 1579-1596
    • (2008) Electr Power Syst Res , vol.78 , Issue.9 , pp. 1579-1596
    • Bisanovic, S.1    Hajro, M.2    Dlakic, M.3
  • 9
    • 37449023876 scopus 로고    scopus 로고
    • Adaptive mixed-integer programming unit commitment strategy for determining the value of forecasting
    • 10.1016/j.apenergy.2007.07.007
    • Delarue E, D'haeseleer W (2008) Adaptive mixed-integer programming unit commitment strategy for determining the value of forecasting. Appl Energy 85(4): 171-181
    • (2008) Appl Energy , vol.85 , Issue.4 , pp. 171-181
    • Delarue, E.1    D'Haeseleer, W.2
  • 10
    • 0041784238 scopus 로고    scopus 로고
    • Transmission-constrained unit commitment based on benders decomposition
    • 10.1016/S0142-0615(97)00058-6
    • Ma H, Shahidehpour M (1998) Transmission-constrained unit commitment based on benders decomposition. Int J Electr Power Energy Syst 20(4): 287-294
    • (1998) Int J Electr Power Energy Syst , vol.20 , Issue.4 , pp. 287-294
    • Ma, H.1    Shahidehpour, M.2
  • 11
    • 77951665563 scopus 로고    scopus 로고
    • Extended benders decomposition for two-stage SCUC
    • 10.1109/TPWRS.2009.2038019
    • Liu C, Shahidehpour M, Wu L (2010) Extended benders decomposition for two-stage SCUC. IEEE Trans Power Syst 25(2): 1192-1194
    • (2010) IEEE Trans Power Syst , vol.25 , Issue.2 , pp. 1192-1194
    • Liu, C.1    Shahidehpour, M.2    Wu, L.3
  • 13
    • 0034140869 scopus 로고    scopus 로고
    • What is evolutionary computation
    • 1743559 10.1109/6.819926
    • Fogel DB (2000) What is evolutionary computation. IEEE Spectr 37(2): 28-32
    • (2000) IEEE Spectr , vol.37 , Issue.2 , pp. 28-32
    • Fogel, D.B.1
  • 14
    • 0030216464 scopus 로고    scopus 로고
    • Unit commitment by genetic algorithm with penalty methods and a comparison of lagrangian search and genetic algorithm - Economic dispatch example
    • 10.1016/0142-0615(95)00013-5
    • Sheblé GB, Maifeld TT, Brittig K, Fahd G, Fukurozaki- Coppinger S (1996) Unit commitment by genetic algorithm with penalty methods and a comparison of lagrangian search and genetic algorithm - economic dispatch example. Int J Electr Power Energy Syst 18(6): 339-346
    • (1996) Int J Electr Power Energy Syst , vol.18 , Issue.6 , pp. 339-346
    • Sheblé, G.B.1    Maifeld, T.T.2    Brittig, K.3    Fahd, G.4    Fukurozaki- Coppinger, S.5
  • 16
    • 0028508056 scopus 로고
    • Short-term hydrothermal scheduling. II. Parallel simulated annealing approach
    • 10.1049/ip-gtd:19941351
    • Wong KP, Wong YW (1994) Short-term hydrothermal scheduling. II. Parallel simulated annealing approach. Proc IEEE Gener Transm Distrib 141(5): 502-506
    • (1994) Proc IEEE Gener Transm Distrib , vol.141 , Issue.5 , pp. 502-506
    • Wong, K.P.1    Wong, Y.W.2
  • 17
    • 32144445924 scopus 로고    scopus 로고
    • Unit commitment by an enhanced simulated annealing algorithm
    • 10.1109/TPWRS.2005.860922
    • Simopoulos DN, Kavatza SD, Vournas CD (2006) Unit commitment by an enhanced simulated annealing algorithm. IEEE Trans Power Syst 21(1): 68-76
    • (2006) IEEE Trans Power Syst , vol.21 , Issue.1 , pp. 68-76
    • Simopoulos, D.N.1    Kavatza, S.D.2    Vournas, C.D.3
  • 18
    • 27144521151 scopus 로고    scopus 로고
    • Unit commitment using particle swarm optimization combined with Lagrange relaxation
    • Sriyanyong P, Song YH (2005) Unit commitment using particle swarm optimization combined with Lagrange relaxation. IEEE Power Eng Soc Gen Meet 3: 2752-2759
    • (2005) IEEE Power Eng Soc Gen Meet , vol.3 , pp. 2752-2759
    • Sriyanyong, P.1    Song, Y.H.2
  • 19
    • 70350475533 scopus 로고    scopus 로고
    • A hybrid method for optimal scheduling of short-term electric power generation of cascaded hydroelectric plants based on particle swarm optimization and chance-constrained programming
    • 10.1109/TPWRS.2008.2004822
    • Jiekang W, Jianquan Z, Guotong C, Hongliang Z (2008) A hybrid method for optimal scheduling of short-term electric power generation of cascaded hydroelectric plants based on particle swarm optimization and chance-constrained programming. IEEE Trans Power Syst 23(4): 1570-1579
    • (2008) IEEE Trans Power Syst , vol.23 , Issue.4 , pp. 1570-1579
    • Jiekang, W.1    Jianquan, Z.2    Guotong, C.3    Hongliang, Z.4
  • 20
    • 0026820890 scopus 로고
    • A hybrid artificial neural network-dynamic programming approach to unit commitment
    • 10.1109/59.141709
    • Ouyang Z, Shahidehpour SM (1992) A hybrid artificial neural network-dynamic programming approach to unit commitment. IEEE Trans Power Syst 7(1): 236-242
    • (1992) IEEE Trans Power Syst , vol.7 , Issue.1 , pp. 236-242
    • Ouyang, Z.1    Shahidehpour, S.M.2
  • 22
    • 70349456188 scopus 로고    scopus 로고
    • A new fuzzy adaptive hybrid particle swarm optimization algorithm for non-linear, non-smooth and non-convex economic dispatch problem
    • 10.1016/j.apenergy.2009.05.016
    • Niknam T (2010) A new fuzzy adaptive hybrid particle swarm optimization algorithm for non-linear, non-smooth and non-convex economic dispatch problem. Appl Energy 87(1): 327-339
    • (2010) Appl Energy , vol.87 , Issue.1 , pp. 327-339
    • Niknam, T.1
  • 23
    • 1442288866 scopus 로고    scopus 로고
    • An evolutionary programming-based tabu search method for solving the unit commitment problem
    • 10.1109/TPWRS.2003.821472
    • Rajan CCA, Mohan MR (2004) An evolutionary programming-based tabu search method for solving the unit commitment problem. IEEE Trans Power Syst 19(1): 577-585
    • (2004) IEEE Trans Power Syst , vol.19 , Issue.1 , pp. 577-585
    • Rajan, C.C.A.1    Mohan, M.R.2
  • 24
    • 0030084669 scopus 로고    scopus 로고
    • Evolutionary programming based economic dispatch for units with non-smooth fuel cost functions
    • 10.1109/59.485992
    • Yang HT, Yang PC, Huang CL (1996) Evolutionary programming based economic dispatch for units with non-smooth fuel cost functions. IEEE Trans Power Syst 11(1): 112-118
    • (1996) IEEE Trans Power Syst , vol.11 , Issue.1 , pp. 112-118
    • Yang, H.T.1    Yang, P.C.2    Huang, C.L.3
  • 25
    • 63449111241 scopus 로고    scopus 로고
    • A new decomposition approach for the thermal unit commitment problem
    • 10.1016/j.apenergy.2009.01.022
    • Niknam T, Khodaei A, Fallahi F (2009) A new decomposition approach for the thermal unit commitment problem. Appl Energy 86(9): 1667-1674
    • (2009) Appl Energy , vol.86 , Issue.9 , pp. 1667-1674
    • Niknam, T.1    Khodaei, A.2    Fallahi, F.3
  • 26
    • 74249109985 scopus 로고    scopus 로고
    • A practical approach for profit-based unit commitment with emission limitations
    • 10.1016/j.ijepes.2009.07.006
    • Catalao JPS, Mariano SJPS, Mendes VMF, Ferreira LAFM (2010) A practical approach for profit-based unit commitment with emission limitations. Electr Power Energy Syst 32(3): 218-224
    • (2010) Electr Power Energy Syst , vol.32 , Issue.3 , pp. 218-224
    • Catalao, J.P.S.1    Mariano, S.2    Mendes, V.M.F.3    Ferreira, L.4
  • 27
    • 78650866387 scopus 로고    scopus 로고
    • Risk-constrained self-scheduling of a fuel and emission constrained power producer using rolling window procedure
    • 10.1016/j.ijepes.2010.08.034
    • Kazempour SJ, Moghaddam MP (2011) Risk-constrained self-scheduling of a fuel and emission constrained power producer using rolling window procedure. Electr Power Energy Syst 33(2): 359-368
    • (2011) Electr Power Energy Syst , vol.33 , Issue.2 , pp. 359-368
    • Kazempour, S.J.1    Moghaddam, M.P.2
  • 28
    • 2542598480 scopus 로고    scopus 로고
    • Unit commitment - A bibliographical survey
    • 10.1109/TPWRS.2003.821611
    • Padhy NP (2004) Unit commitment - a bibliographical survey. IEEE Trans Power Syst 19(2): 1196-2005
    • (2004) IEEE Trans Power Syst , vol.19 , Issue.2 , pp. 1196-2005
    • Padhy, N.P.1
  • 30
    • 0031079225 scopus 로고    scopus 로고
    • Hydro unit start-up costs and their impact on the short term scheduling strategies of swedish power producers
    • 10.1109/59.574921
    • Nilsson O, Sjelvgren D (1997) Hydro unit start-up costs and their impact on the short term scheduling strategies of swedish power producers. IEEE Trans Power Syst 12(1): 38-44
    • (1997) IEEE Trans Power Syst , vol.12 , Issue.1 , pp. 38-44
    • Nilsson, O.1    Sjelvgren, D.2
  • 32
    • 0034244118 scopus 로고    scopus 로고
    • Optimal response of a thermal unit to an electricity spot market
    • 10.1109/59.871739
    • Arroyo JM, Conejo AJ (2000) Optimal response of a thermal unit to an electricity spot market. IEEE Trans Power Syst 15(3): 1098-1104
    • (2000) IEEE Trans Power Syst , vol.15 , Issue.3 , pp. 1098-1104
    • Arroyo, J.M.1    Conejo, A.J.2
  • 33
    • 28244479344 scopus 로고    scopus 로고
    • Price-based unit commitment: A case of lagrangian relaxation versus mixed integer programming
    • 10.1109/TPWRS.2005.857391
    • Li T, Shahidehpour M (2005) Price-based unit commitment: a case of lagrangian relaxation versus mixed integer programming. IEEE Trans Power Syst 20(4): 2015-2025
    • (2005) IEEE Trans Power Syst , vol.20 , Issue.4 , pp. 2015-2025
    • Li, T.1    Shahidehpour, M.2
  • 34
    • 0027646347 scopus 로고
    • Genetic algorithm solution of economic dispatch with valve point loading
    • 10.1109/59.260861
    • Walters DC, Sheble GB (1993) Genetic algorithm solution of economic dispatch with valve point loading. IEEE Trans Power Syst 8(3): 1325-1332
    • (1993) IEEE Trans Power Syst , vol.8 , Issue.3 , pp. 1325-1332
    • Walters, D.C.1    Sheble, G.B.2
  • 35
    • 33947321134 scopus 로고    scopus 로고
    • A new particle swarm optimization solution to non-convex economic dispatch problems
    • 10.1109/TPWRS.2006.889132
    • Selvakumar AI, Thanushkodi K (2007) A new particle swarm optimization solution to non-convex economic dispatch problems. IEEE Trans Power Syst 22(1): 42-51
    • (2007) IEEE Trans Power Syst , vol.22 , Issue.1 , pp. 42-51
    • Selvakumar, A.I.1    Thanushkodi, K.2
  • 36
    • 68349155820 scopus 로고    scopus 로고
    • Non-convex economic dispatch with AC constraints by a new real coded genetic algorithm
    • 10.1109/TPWRS.2009.2022998
    • Amjady N, Rad HN (2009) Non-convex economic dispatch with AC constraints by a new real coded genetic algorithm. IEEE Trans Power Syst 24(3): 1489-1502
    • (2009) IEEE Trans Power Syst , vol.24 , Issue.3 , pp. 1489-1502
    • Amjady, N.1    Rad, H.N.2
  • 37
    • 39749084088 scopus 로고    scopus 로고
    • GENCO's risk-based maintenance outage scheduling
    • 1174.68673 10.1109/TPWRS.2007.913295
    • Wu L, Shahidehpour M, Li T (2008) GENCO's risk-based maintenance outage scheduling. IEEE Trans Power Syst 23(1): 127-136
    • (2008) IEEE Trans Power Syst , vol.23 , Issue.1 , pp. 127-136
    • Wu, L.1    Shahidehpour, M.2    Li, T.3
  • 38
    • 34548052493 scopus 로고    scopus 로고
    • Dynamic ramping in unit commitment
    • 10.1109/TPWRS.2007.901453
    • Li T, Shahidehpour M (2007) Dynamic ramping in unit commitment. IEEE Trans Power Syst 22(3): 1379-1381
    • (2007) IEEE Trans Power Syst , vol.22 , Issue.3 , pp. 1379-1381
    • Li, T.1    Shahidehpour, M.2
  • 39
    • 18944367302 scopus 로고    scopus 로고
    • Security-constrained unit commitment for simultaneous clearing of energy and ancillary services markets
    • 10.1109/TPWRS.2005.846063
    • Li Z, Shahidehpour M (2005) Security-constrained unit commitment for simultaneous clearing of energy and ancillary services markets. IEEE Trans Power Syst 20(2): 1079-1088
    • (2005) IEEE Trans Power Syst , vol.20 , Issue.2 , pp. 1079-1088
    • Li, Z.1    Shahidehpour, M.2
  • 40
    • 34248512634 scopus 로고    scopus 로고
    • Stochastic security-constrained unit commitment
    • 10.1109/TPWRS.2007.894843
    • Wu L, Shahidehpour M, Li T (2007) Stochastic security-constrained unit commitment. IEEE Trans Power Syst 22(2): 800-811
    • (2007) IEEE Trans Power Syst , vol.22 , Issue.2 , pp. 800-811
    • Wu, L.1    Shahidehpour, M.2    Li, T.3
  • 41
    • 34548029408 scopus 로고    scopus 로고
    • Risk-constrained generation asset arbitrage in power systems
    • 10.1109/TPWRS.2007.901753
    • Li T, Shahidehpour M (2007) Risk-constrained generation asset arbitrage in power systems. IEEE Trans Power Syst 22(3): 1330-1339
    • (2007) IEEE Trans Power Syst , vol.22 , Issue.3 , pp. 1330-1339
    • Li, T.1    Shahidehpour, M.2
  • 42
    • 33847610285 scopus 로고    scopus 로고
    • Short term hydrothermal scheduling with bilateral transactions via bundle method
    • 10.1016/j.ijepes.2006.10.002
    • Mezger AJ, de-Almeida KC (2007) Short term hydrothermal scheduling with bilateral transactions via bundle method. Int J Electr Power Energy Syst 29(5): 387-396
    • (2007) Int J Electr Power Energy Syst , vol.29 , Issue.5 , pp. 387-396
    • Mezger, A.J.1    De-Almeida, K.C.2
  • 43
    • 0036474025 scopus 로고    scopus 로고
    • Combined pool/bilateral dispatch - Part I: Performance of trading strategies
    • 10.1109/59.982198
    • Galiana FD, Kockar I, Franco PC (2002) Combined pool/bilateral dispatch - part I: performance of trading strategies. IEEE Trans Power Syst 17(1): 92-99
    • (2002) IEEE Trans Power Syst , vol.17 , Issue.1 , pp. 92-99
    • Galiana, F.D.1    Kockar, I.2    Franco, P.C.3
  • 44
    • 0036872146 scopus 로고    scopus 로고
    • Self-scheduling of a hydro producer in a pool-based electricity market
    • 10.1109/TPWRS.2002.804951
    • Conejo AJ, Arroyo JM, Contreras J, Villamor FA (2002) Self-scheduling of a hydro producer in a pool-based electricity market. IEEE Trans Power Syst 17(4): 1265-1272
    • (2002) IEEE Trans Power Syst , vol.17 , Issue.4 , pp. 1265-1272
    • Conejo, A.J.1    Arroyo, J.M.2    Contreras, J.3    Villamor, F.A.4
  • 45
    • 84877925840 scopus 로고    scopus 로고
    • Generalized algebraic modeling systems (GAMS)
    • Generalized algebraic modeling systems (GAMS). http://www.gams.com
  • 46
    • 77950858509 scopus 로고    scopus 로고
    • Stochastic multiobjective self-scheduling of a power producer in joint energy and reserves markets
    • 10.1016/j.epsr.2009.11.007
    • Vahidinasab V, Jadid S (2010) Stochastic multiobjective self-scheduling of a power producer in joint energy and reserves markets. Electr Power Syst Res 80(7): 760-769
    • (2010) Electr Power Syst Res , vol.80 , Issue.7 , pp. 760-769
    • Vahidinasab, V.1    Jadid, S.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.