-
1
-
-
70449569422
-
Non-dominated archiving multi-colony ant algorithm for multi-objective optimization: Application to multi-purpose reservoir operation
-
Afshar, A., Sharifi, F., and Jalali, M.R., 2009. Non-dominated archiving multi-colony ant algorithm for multi-objective optimization: application to multi-purpose reservoir operation. Engineering Optimization, 41 (4), 313-325.
-
(2009)
Engineering Optimization
, vol.41
, Issue.4
, pp. 313-325
-
-
Afshar, A.1
Sharifi, F.2
Jalali, M.R.3
-
2
-
-
0032045130
-
Anewlower bounding scheme for the total weighted tardiness problem
-
Akturk, M.S. andYildirim, M.B., 1998.Anewlower bounding scheme for the total weighted tardiness problem. Computers and Operations Research, 25 (4), 265-278.
-
(1998)
Computers and Operations Research
, vol.25
, Issue.4
, pp. 265-278
-
-
Akturk, M.S.1
Yildirim, M.B.2
-
3
-
-
0016952078
-
The complexity of flowshop and jobshop scheduling
-
Garey, M.R., Johnson, D.S., and Sethi, R., 1976. The complexity of flowshop and jobshop scheduling. Mathematics of Operations Research, 1 (2), 117-129.
-
(1976)
Mathematics of Operations Research
, vol.1
, Issue.2
, pp. 117-129
-
-
Garey, M.R.1
Johnson, D.S.2
Sethi, R.3
-
4
-
-
0038273913
-
Balance between genetic search and local search in memetic algorithms for multiobjective permutation flowshop scheduling
-
Ishibuchi, H.,Yoshida,T., and Murata,T 2003. Balance between genetic search and local search in memetic algorithms for multiobjective permutation flowshop scheduling IEEE Transactions on Evolutionary Computation 7 2 204-223.
-
(2003)
IEEE Transactions on Evolutionary Computation
, vol.7
, Issue.2
, pp. 204-223
-
-
Ishibuchi, H.1
Yoshida, T.2
Murata, T.3
-
5
-
-
77958151592
-
On metrics for comparing nondominated sets
-
12-17 May 2002 Honolulu, HI, USA
-
Knowles, J.D. and Corne, D.W., 2002. On metrics for comparing nondominated sets. In: Proceedings of congress on evolutionary computation (CEC'02), 12-17 May 2002 Honolulu, HI, USA, pp. 711-716.
-
(2002)
Proceedings of Congress on Evolutionary Computation (CEC'02)
, pp. 711-716
-
-
Knowles, J.D.1
Corne, D.W.2
-
6
-
-
79957469535
-
Implementing co-evolution and parallelization in a multi-objective particle swarm optimizer
-
Kotinis, M., 2011. Implementing co-evolution and parallelization in a multi-objective particle swarm optimizer. Engineering Optimization, 43 (6), 635-656.
-
(2011)
Engineering Optimization
, vol.43
, Issue.6
, pp. 635-656
-
-
Kotinis, M.1
-
8
-
-
0024770469
-
Sequencing in an assembly line with blocking to minimize cycle time
-
McCormick, S.T., et al., 1989. Sequencing in an assembly line with blocking to minimize cycle time. Operations Research, 37 (6), 925-936.
-
(1989)
Operations Research
, vol.37
, Issue.6
, pp. 925-936
-
-
McCormick, S.T.1
-
10
-
-
44849083459
-
An effective hybrid DE-based algorithm for multi-objective flow shop scheduling with limited buffers
-
Qian, B., et al., 2009. An effective hybrid DE-based algorithm for multi-objective flow shop scheduling with limited buffers. Computers and Operations Research, 36 (1), 209-233.
-
(2009)
Computers and Operations Research
, vol.36
, Issue.1
, pp. 209-233
-
-
Qian, B.1
-
11
-
-
33751071385
-
A taxonomy of flexible flow line scheduling procedures
-
Quadt, D. and Kuhn, H., 2007.A taxonomy of flexible flow line scheduling procedures. European Journal of Operational Research, 178 (3), 686-698.
-
(2007)
European Journal of Operational Research
, vol.178
, Issue.3
, pp. 686-698
-
-
Quadt, D.1
Kuhn, H.2
-
12
-
-
41549086546
-
A multi-objective scatter search for a bi-criteria no-wait flow shop scheduling problem
-
Rahimi-Vahed, A.R., et al., 2008.A multi-objective scatter search for a bi-criteria no-wait flow shop scheduling problem. Engineering Optimization, 40 (4), 331-346.
-
(2008)
Engineering Optimization
, vol.40
, Issue.4
, pp. 331-346
-
-
Rahimi-Vahed, A.R.1
-
13
-
-
77956226560
-
An improved hybrid multi-objective parallel genetic algorithm for hybrid flow shop scheduling with unrelated parallel machines
-
Rashidi, E., Jahandar, M., and Zandieh, M., 2010. An improved hybrid multi-objective parallel genetic algorithm for hybrid flow shop scheduling with unrelated parallel machines. International Journal of Advanced Manufacturing Technology, 49 (9-12), 1129-1139.
-
(2010)
International Journal of Advanced Manufacturing Technology
, vol.49
, Issue.9-12
, pp. 1129-1139
-
-
Rashidi, E.1
Jahandar, M.2
Zandieh, M.3
-
14
-
-
18144431039
-
Flow shop scheduling with multiple objective of minimizing makespan and total flow time
-
Ravindran, D., et al., 2005. Flow shop scheduling with multiple objective of minimizing makespan and total flow time. International Journal of Advanced Manufacturing Technology, 25 (9-10), 1007-1012.
-
(2005)
International Journal of Advanced Manufacturing Technology
, vol.25
, Issue.9-10
, pp. 1007-1012
-
-
Ravindran, D.1
-
15
-
-
73449099561
-
Review and classification of hybrid flow shop scheduling problems from a production system and a solutions procedure perspective
-
Ribas, I., Leisten, R., and Framinan, J.M., 2010. Review and classification of hybrid flow shop scheduling problems from a production system and a solutions procedure perspective. Computers and Operations Research, 37 (8), 1439-1454.
-
(2010)
Computers and Operations Research
, vol.37
, Issue.8
, pp. 1439-1454
-
-
Ribas, I.1
Leisten, R.2
Framinan, J.M.3
-
16
-
-
0035922495
-
Mixed integer programming for scheduling surface mount technology lines
-
Sawik, T., 2001. Mixed integer programming for scheduling surface mount technology lines. International Journal of Production Research, 39 (14), 3219-3235.
-
(2001)
International Journal of Production Research
, vol.39
, Issue.14
, pp. 3219-3235
-
-
Sawik, T.1
-
18
-
-
27144431814
-
An introduction to multiobjective metaheuristics for scheduling and timetabling
-
Berlin: Springer
-
Silva, J.D.L., Burke, E.K., and Petrovic, S., 2004. An introduction to multiobjective metaheuristics for scheduling and timetabling. In: Lecture notes in economics and mathematical systems, Vol. 535. Berlin: Springer, pp. 91-129.
-
(2004)
Lecture Notes in Economics and Mathematical Systems
, vol.535
, pp. 91-129
-
-
Silva, J.D.L.1
Burke, E.K.2
Petrovic, S.3
-
19
-
-
33644617884
-
Lagrangian relaxation algorithms for real-time hybrid flowshop scheduling with finite intermediate buffers
-
Tang, L.X. and Xuan, H., 2006. Lagrangian relaxation algorithms for real-time hybrid flowshop scheduling with finite intermediate buffers. Journal of the Operational Research Society, 57 (3), 316-324.
-
(2006)
Journal of the Operational Research Society
, vol.57
, Issue.3
, pp. 316-324
-
-
Tang, L.X.1
Xuan, H.2
-
20
-
-
55749087118
-
A priori landscape analysis in guiding interactive multi-objective metaheuristics
-
1-6 June 2008 Hong Kong
-
Tantar, E., et al., 2008. A priori landscape analysis in guiding interactive multi-objective metaheuristics. In: Proceedings of IEEE congress on evolutionary computation (CEC'08), 1-6 June 2008 Hong Kong, pp. 4104-4111.
-
(2008)
Proceedings of IEEE Congress on Evolutionary Computation (CEC'08)
, pp. 4104-4111
-
-
Tantar, E.1
-
21
-
-
79957516714
-
Multi-objective topology optimization using evolutionary algorithms
-
Tawatchai, K. and Sujin, B., 2011. Multi-objective topology optimization using evolutionary algorithms. Engineering Optimization, 43 (5), 541-557.
-
(2011)
Engineering Optimization
, vol.43
, Issue.5
, pp. 541-557
-
-
Tawatchai, K.1
Sujin, B.2
-
22
-
-
81155126164
-
A water-flow algorithm for flexible flow shop scheduling with intermediate buffers
-
Tran, T.H. and Ng, K.M., 2011. A water-flow algorithm for flexible flow shop scheduling with intermediate buffers. Journal of Scheduling, 14 (5), 483-500.
-
(2011)
Journal of Scheduling
, vol.14
, Issue.5
, pp. 483-500
-
-
Tran, T.H.1
Ng, K.M.2
-
23
-
-
0003808330
-
-
Thesis (PhD). Department of Electrical and Computer Engineering, Air Force Institute of Technology, Wright-Patterson AFB, Ohio, USA
-
Van Veldhuizen, D.A., 1999. Multiobjective evolutionary algorithms: classifications, analyses, and new innovations. Thesis (PhD). Department of Electrical and Computer Engineering, Air Force Institute of Technology, Wright-Patterson AFB, Ohio, USA.
-
(1999)
Multiobjective Evolutionary Algorithms: Classifications, Analyses, and New Innovations
-
-
Van Veldhuizen, D.A.1
-
24
-
-
1642518689
-
A tabu search algorithm for the multi-stage parallel machine problem with limited buffer capacities
-
Wardono, B. and Fathi,Y., 2004.A tabu search algorithm for the multi-stage parallel machine problem with limited buffer capacities. European Journal of Operational Research, 155 (2), 380-401.
-
(2004)
European Journal of Operational Research
, vol.155
, Issue.2
, pp. 380-401
-
-
Wardono, B.1
Fathi, Y.2
-
25
-
-
0024016313
-
An adaptable scheduling algorithm for flexible flow lines
-
Wittrock, R.J., 1988. An adaptable scheduling algorithm for flexible flow lines. Operations Research, 36 (3), 445-453.
-
(1988)
Operations Research
, vol.36
, Issue.3
, pp. 445-453
-
-
Wittrock, R.J.1
|