메뉴 건너뛰기




Volumn 3, Issue 4, 2012, Pages 652-659

Coordinating large-scale wind integration and transmission planning

Author keywords

Benders decomposition; contingency reserve; cooptimization; generation expansion planning; transmission expansion planning; wind integration

Indexed keywords

BENDERS DECOMPOSITION; CO-OPTIMIZATION; CONTINGENCY RESERVE; GENERATION EXPANSION PLANNING; TRANSMISSION EXPANSION PLANNING; WIND INTEGRATION;

EID: 84875755756     PISSN: 19493029     EISSN: None     Source Type: Journal    
DOI: 10.1109/TSTE.2012.2204069     Document Type: Article
Times cited : (121)

References (33)
  • 3
    • 4043084055 scopus 로고    scopus 로고
    • Congestion-driven transmission expansion in competitive power market
    • Aug.
    • G. B. Shrestha and P. A. J. Fonseka, "Congestion-driven transmission expansion in competitive power market," IEEE Trans. Power Syst., vol. 19, no. 3, pp. 1658-1665, Aug. 2004.
    • (2004) IEEE Trans. Power Syst. , vol.19 , Issue.3 , pp. 1658-1665
    • Shrestha, G.B.1    Fonseka, P.A.J.2
  • 4
    • 57349152409 scopus 로고    scopus 로고
    • Economic analysis of electric power transmission expansion
    • S. Sozer, C. S. Park, and J. Valenzuela, "Economic analysis of electric power transmission expansion," Eng. Economist, vol. 53, pp. 293-317, 2008.
    • (2008) Eng. Economist , vol.53 , pp. 293-317
    • Sozer, S.1    Park, C.S.2    Valenzuela, J.3
  • 7
    • 0027595537 scopus 로고
    • Minimum cost assessment method for composite generation and transmission system expansion planning
    • DOI 10.1109/59.260818
    • W. Li and R. Billinton, "A minimum cost assessment method for composite generation and transmission system expansion planning," IEEE Trans. Power Syst., vol. 8, no. 2, pp. 628-635, May 1993. (Pubitemid 23699304)
    • (1993) IEEE Transactions on Power Systems , vol.8 , Issue.2 , pp. 628-635
    • Li, W.1    Billinton, R.2
  • 8
    • 0022152754 scopus 로고
    • A decomposition approach to automated generation/transmission expansion planning
    • Nov.
    • M. V. F. Pereira, L. M. V. G. Pinto, S. H. F. Cunha, and G. C. Oliveira, "A decomposition approach to automated generation/transmission expansion planning," IEEE Trans. Power App. Syst., vol. PAS-104, no. 11, pp. 3074-3083, Nov. 1985.
    • (1985) IEEE Trans. Power App. Syst. , vol.PAS-104 , Issue.11 , pp. 3074-3083
    • Pereira, M.V.F.1    Pinto, L.M.V.G.2    Cunha, S.H.F.3    Oliveira, G.C.4
  • 9
    • 36349005968 scopus 로고    scopus 로고
    • Market-based coordination of transmission and generation capacity planning
    • DOI 10.1109/TPWRS.2007.907894
    • J. Roh, M. Shahidehpour, and Y. Fu, "Market-based coordination of transmission and generation capacity planning," IEEE Trans. Power Syst., vol. 22, no. 4, pp. 1406-1419, Nov. 2007. (Pubitemid 350141941)
    • (2007) IEEE Transactions on Power Systems , vol.22 , Issue.4 , pp. 1406-1419
    • Roh, J.H.1    Shahidehpour, M.2    Fu, Y.3
  • 10
    • 68349154621 scopus 로고    scopus 로고
    • Market-based generation and transmission planning with uncertainties
    • Aug.
    • J. Roh, M. Shahidehpour, and L. Wu, "Market-based generation and transmission planning with uncertainties," IEEE Trans. Power Syst., vol. 24, no. 3, pp. 1587-1598, Aug. 2009.
    • (2009) IEEE Trans. Power Syst. , vol.24 , Issue.3 , pp. 1587-1598
    • Roh, J.1    Shahidehpour, M.2    Wu, L.3
  • 11
    • 33645694288 scopus 로고    scopus 로고
    • Wind energy delivery issues (transmission planning and competitive electric market operation)
    • Nov./Dec.
    • R. Piwko, D. Osborn, R. Gramlich, G. Jordan, D. Hawkins, and K. Porter, "Wind energy delivery issues (transmission planning and competitive electric market operation)," IEEE Power Energy Mag., vol. 3, no. 6, pp. 47-56, Nov./Dec. 2005.
    • (2005) IEEE Power Energy Mag. , vol.3 , Issue.6 , pp. 47-56
    • Piwko, R.1    Osborn, D.2    Gramlich, R.3    Jordan, G.4    Hawkins, D.5    Porter, K.6
  • 12
    • 9644308639 scopus 로고
    • Partitioning procedures for solving mixed-variables programming problems
    • Dec.
    • J. F. Benders, "Partitioning procedures for solving mixed-variables programming problems," J. NumerischeMathematik, vol. 4, no. 1, pp. 238-252, Dec. 1962.
    • (1962) J. NumerischeMathematik , vol.4 , Issue.1 , pp. 238-252
    • Benders, J.F.1
  • 13
    • 0015419856 scopus 로고
    • Generalized benders decomposition
    • Oct.
    • A. M. Geoffrion, "Generalized benders decomposition," J. Optimizat. Theory Applicat., vol. 10, no. 4, pp. 237-260, Oct. 1972.
    • (1972) J. Optimizat. Theory Applicat. , vol.10 , Issue.4 , pp. 237-260
    • Geoffrion, A.M.1
  • 14
    • 0028371606 scopus 로고
    • A hierarchical decomposition approach for transmission network expansion planning
    • Feb.
    • R. Romero and A. Monticelli, "A hierarchical decomposition approach for transmission network expansion planning," IEEE Trans. Power Syst., vol. 9, no. 1, pp. 373-380, Feb. 1994.
    • (1994) IEEE Trans. Power Syst. , vol.9 , Issue.1 , pp. 373-380
    • Romero, R.1    Monticelli, A.2
  • 16
    • 57349152409 scopus 로고    scopus 로고
    • Economic analysis of electric power transmission expansion
    • S. Sozer, C. S. Park, and J. Valenzuela, "Economic analysis of electric power transmission expansion," Eng. Economist, vol. 53, pp. 293-317, 2008.
    • (2008) Eng. Economist , vol.53 , pp. 293-317
    • Sozer, S.1    Park, C.S.2    Valenzuela, J.3
  • 17
    • 18944371663 scopus 로고    scopus 로고
    • A new approach to quantify reserve demand in systems with significant installed wind capacity
    • DOI 10.1109/TPWRS.2005.846206
    • R. Doherty and M. O'Malley, "A new approach to quantify reserve demand in systems with significant installed wind capacity," IEEE Trans. Power Syst., vol. 20, no. 2, pp. 587-595, May 2005. (Pubitemid 40699684)
    • (2005) IEEE Transactions on Power Systems , vol.20 , Issue.2 , pp. 587-595
    • Doherty, R.1    O'Malley, M.2
  • 18
    • 84871486938 scopus 로고    scopus 로고
    • Apr. 13, [Online]. Available
    • MISO Market Subcommittee, Dispatchable Intermittent Resource Implementation Guide Apr. 13, 2011 [Online]. Available: https://www.midwestiso. org/Library/Repository/Meeting%20Material/Stakeholder/MSC/2011/20110301/ 20110301%20MSC%20Item%2012a%20DIR%20Implementation%20Update.pdf
    • (2011) Dispatchable Intermittent Resource Implementation Guide
  • 20
    • 85081456680 scopus 로고    scopus 로고
    • Available
    • EGEAS software [Online]. Available: http://portfolio.epri.com/ProgramTab. aspx?sId=GEN&rId=196&pId=6573&suId=6581
    • EGEAS Software [Online]
  • 22
    • 0034244117 scopus 로고    scopus 로고
    • Energy and ancillary service dispatch for the interim ISO new england electricity market
    • Aug.
    • K. W. Cheung, P. Shamsollahi, D. Sun, J. Milligan, and M. Potishnak, "Energy and ancillary service dispatch for the interim ISO new england electricity market," IEEE Trans. Power Syst., vol. 15, no. 3, pp. 968-974, Aug. 2000.
    • (2000) IEEE Trans. Power Syst. , vol.15 , Issue.3 , pp. 968-974
    • Cheung, K.W.1    Shamsollahi, P.2    Sun, D.3    Milligan, J.4    Potishnak, M.5
  • 25
    • 84861408123 scopus 로고    scopus 로고
    • Power reserve in interconnected systems with high wind power penetration
    • G. Dany, "Power reserve in interconnected systems with high wind power penetration," in Proc. IEEE Porto Power Tech Conf., 2011, vol. 4.
    • Proc. IEEE Porto Power Tech Conf., 2011 , vol.4
    • Dany, G.1
  • 26
    • 77951667814 scopus 로고    scopus 로고
    • Maximizing firm wind connection to security constrained transmission networks
    • May
    • D. J. Burke and M. J. O'Malley, "Maximizing firm wind connection to security constrained transmission networks," IEEE Trans. Power Syst., vol. 25, no. 2, pp. 749-759, May 2010.
    • (2010) IEEE Trans. Power Syst. , vol.25 , Issue.2 , pp. 749-759
    • Burke, D.J.1    O'Malley, M.J.2
  • 27
    • 85081459139 scopus 로고    scopus 로고
    • Available
    • Eastern Wind Dataset [Online]. Available: http://www.nrel.gov/wind/ integrationdatasets/eastern/methodology.html#forecasts
    • Eastern Wind Dataset [Online]
  • 31
    • 0018544097 scopus 로고
    • IEEE Reliability Test System
    • APM Subcommittee
    • APM Subcommittee, "IEEE Reliability Test System," IEEE Trans. Power App. Syst., vol. PAS-98, pp. 2047-2054, 1979.
    • (1979) IEEE Trans. Power App. Syst. , vol.PAS-98 , pp. 2047-2054


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.