-
1
-
-
77953589830
-
Optimal selectivemaintenance strategy formultistate systems under imperfect maintenance
-
Jun
-
Y. Liu and H. Huang, "Optimal selectivemaintenance strategy formultistate systems under imperfect maintenance," IEEE Trans. Rel., vol. 59, no. 2, pp. 356-367, Jun. 2010.
-
(2010)
IEEE Trans. Rel
, vol.59
, Issue.2
, pp. 356-367
-
-
Liu, Y.1
Huang, H.2
-
2
-
-
78650882975
-
Substation maintenance strategy adaptation for life-cycle cost reduction using genetic algorithm
-
Jan
-
M. HinowandM. Mevissen, "Substation maintenance strategy adaptation for life-cycle cost reduction using genetic algorithm," IEEE Trans. Power Del., vol. 26, no. 1, pp. 197-207, Jan. 2011.
-
(2011)
IEEE Trans. Power Del
, vol.26
, Issue.1
, pp. 197-207
-
-
Hinowand, M.1
Mevissen, M.2
-
3
-
-
14544284446
-
Reliability-Centered maintenance strategy for high voltage networks
-
M. Zdrallek, "Reliability-Centered maintenance strategy for high voltage networks," in Proc. Probabilistic Meth. Appl. Power Syst. Conf., 2004, pp. 332-337.
-
(2004)
Proc. Probabilistic Meth. Appl. Power Syst. Conf
, pp. 332-337
-
-
Zdrallek, M.1
-
4
-
-
51149097575
-
Development and implementation of a conditionmonitoring system in a substation
-
J. L. Velásquez and R. Villafáfila, "Development and implementation of a conditionmonitoring system in a substation," in Proc. Elect. Power Qual. Utiliz. Conf., 2007, pp. 332-337.
-
(2007)
Proc. Elect. Power Qual. Utiliz. Conf
, pp. 332-337
-
-
Velásquez, J.L.1
Villafáfila, R.2
-
5
-
-
84875649192
-
Condition based maintenance on MV circuit breakers
-
A. Galati, S. Chell, P. Tuninetti, and M. Maddaluno, "Condition based maintenance on MV circuit breakers," in Proc. Elect. Distrib. Conf., 2009, pp. 1-4.
-
(2009)
Proc. Elect. Distrib. Conf
, pp. 1-4
-
-
Galati, A.1
Chell, S.2
Tuninetti, P.3
Maddaluno, M.4
-
7
-
-
33747623359
-
Reliability-centred maintenance of MV circuit-breakers
-
J. Schlabbach and T. Berka, "Reliability-centred maintenance of MV circuit-breakers," in Proc. IEEE Power Tech Conf., 2001, pp. 5-10.
-
(2001)
Proc IEEE Power Tech Conf
, pp. 5-10
-
-
Schlabbach, J.1
Berka, T.2
-
8
-
-
78650605068
-
Criticality assessment of GIS components
-
M. Al-Suhaily, S. Meijer, J. J. Smit, P. Sibbald, and J. Kanters, "Criticality assessment of GIS components," in Proc. High Voltage Eng. Appl. Conf., 2010, pp. 626-629.
-
(2010)
Proc. High Voltage Eng. Appl. Conf
, pp. 626-629
-
-
Al-Suhaily, M.1
Meijer, S.2
Smit, J.J.3
Sibbald, P.4
Kanters, J.5
-
9
-
-
80054942346
-
NewFMECAmethodology using structural importance and fuzzy theory
-
Nov
-
Y. Lee,H.Kim, J.Cha, and J.Kim, "NewFMECAmethodology using structural importance and fuzzy theory," IEEE Trans. Power Syst., vol. 26, no. 4, pp. 2364-2370, Nov. 2011.
-
(2011)
IEEE Trans. Power Syst
, vol.26
, Issue.4
, pp. 2364-2370
-
-
Lee, Y.1
Kim, H.2
Cha, J.3
Kim, J.4
-
10
-
-
77955212828
-
A new method for FMECA using expert system and fuzzy theory
-
Y. Lee, H. Kim, J. Cha, and J. Kim, "A new method for FMECA using expert system and fuzzy theory," in Proc. Environ. Elect. Eng. Conf., 2010, pp. 293-296.
-
(2010)
Proc. Environ. Elect. Eng. Conf
, pp. 293-296
-
-
Lee, Y.1
Kim, H.2
Cha, J.3
Kim, J.4
-
11
-
-
33846571919
-
Component criticality importance measures for the power industry
-
DOI 10.1016/j.epsr.2006.04.003, PII S037877960600099X
-
J. F. Espiritu, D. W. Coit, and U. Prakash, "Component criticality importance measures for the power industry," Elect. Power Syst. Res., vol. 77, pp. 407-420, Apr. 2007. (Pubitemid 46186795)
-
(2007)
Electric Power Systems Research
, vol.77
, Issue.5-6
, pp. 407-420
-
-
Espiritu, J.F.1
Coit, D.W.2
Prakash, U.3
-
12
-
-
0347968133
-
A cost-effective approach of prioritizing distribution maintenance based on system reliability
-
Jan
-
F. Li and R. E. Brown, "A cost-effective approach of prioritizing distribution maintenance based on system reliability," IEEE Trans. Power Del., vol. 19, no. 1, pp. 439-441, Jan. 2004.
-
(2004)
IEEE Trans. Power Del
, vol.19
, Issue.1
, pp. 439-441
-
-
Li, F.1
Brown, R.E.2
-
13
-
-
0037261844
-
An assessment of RPN prioritization in a failure modes effects and criticality analysis
-
J. B. Bowles, "An assessment of RPN prioritization in a failure modes effects and criticality analysis," in Proc. Annu. Symp. Rel. Maintain., 2003, pp. 380-386.
-
(2003)
Proc. Annu. Symp. Rel. Maintain
, pp. 380-386
-
-
Bowles, J.B.1
-
14
-
-
0037261844
-
An assessment of RPN prioritization in a failure modes effects and criticality analysis
-
J. B. Bowles, "An assessment of RPN prioritization in a failure modes effects and criticality analysis," in Proc. Annu. Symp. Rel. Maintain., 2003, pp. 380-386.
-
(2003)
Proc. Annu. Symp. Rel. Maintain
, pp. 380-386
-
-
Bowles, J.B.1
-
16
-
-
0002425683
-
The analytic hierarchy process: A survey of the method and its applications
-
F. Zahedi, "The analytic hierarchy process: A survey of the method and its applications," Interfaces J., pp. 96-108, 1986.
-
(1986)
Interfaces J
, pp. 96-108
-
-
Zahedi, F.1
-
17
-
-
40649115248
-
Fuzzy AHP in prioritizing feeders for maintenance in nuclear power plants
-
DOI 10.1109/IEEM.2007.4419169, 4419169, IEEM 2007: 2007 IEEE International Conference on Industrial Engineering and Engineering Management
-
A. Srividya, N. Suresh, and A. Verma, "Fuzzy AHP in prioritizing feeders for maintenance in nuclear power plants," in Proc. Ind. Eng. Manage. Conf., 2007, pp. 149-153. (Pubitemid 351370977)
-
(2007)
IEEM 2007: 2007 IEEE International Conference on Industrial Engineering and Engineering Management
, pp. 149-153
-
-
Srividya, A.1
Suresh, H.N.2
Verma, A.K.3
-
18
-
-
13844255532
-
Analytic hierarchy process with fuzzy scoring in evaluating multidisciplinary R&D projects in China
-
DOI 10.1109/TEM.2004.839964
-
K.Wang, C.Wang, and C. Hu, "Analytic hierarchy process with fuzzy scoring in evaluating multidisciplinary R&D projects in China," IEEE Trans. Engi. Manage., vol. 52, no. 1, pp. 119-129, Feb. 2005. (Pubitemid 40241904)
-
(2005)
IEEE Transactions on Engineering Management
, vol.52
, Issue.1
, pp. 119-129
-
-
Wang, K.1
Wang, C.K.2
Hu, C.3
-
19
-
-
39849083178
-
A group decision support approach to evaluate experts for R&D project selection
-
DOI 10.1109/TEM.2007.912934
-
Y. Sun, J. Ma, Z. Fan, and J. Wang, "A group decision support approach to evaluate experts for R&D project selection," IEEE Trans. Eng. Manage., vol. 55, no. 1, pp. 158-170, Feb. 2008. (Pubitemid 351314647)
-
(2008)
IEEE Transactions on Engineering Management
, vol.55
, Issue.1
, pp. 158-170
-
-
Sun, Y.-H.1
Ma, J.2
Fan, Z.-P.3
Wang, J.4
-
20
-
-
76649122805
-
Quantitative decision-making model for distribution system restoration
-
Feb
-
W. Chen, "Quantitative decision-making model for distribution system restoration," IEEE Trans. Power Syst., vol. 25, no. 1, pp. 313-321, Feb. 2010.
-
(2010)
IEEE Trans. Power Syst
, vol.25
, Issue.1
, pp. 313-321
-
-
Chen, W.1
-
21
-
-
79551619977
-
Selecting the individual numerical scale and prioritization method in the Analytic Hierarchy process
-
Feb
-
Y. Dong, W. Hong, and Y. X. Yu, "Selecting the individual numerical scale and prioritization method in the Analytic Hierarchy process," IEEE Trans. Fuzzy Syst., vol. 19, no. 1, pp. 13-25, Feb. 2011.
-
(2011)
IEEE Trans. Fuzzy Syst
, vol.19
, Issue.1
, pp. 13-25
-
-
Dong, Y.1
Hong, W.2
Yu, Y.X.3
-
26
-
-
2342482374
-
Optimal design of a condition-based maintenance model
-
Jan. 26-29
-
S. V. Amari and L. McLaughlin, "Optimal design of a condition-based maintenance model," in Proc. Rel. Maintain. Annu. Symp., Jan. 26-29, 2004, pp. 528-533.
-
(2004)
Proc. Rel. Maintain. Annu. Symp
, pp. 528-533
-
-
Amari, S.V.1
McLaughlin, L.2
|