메뉴 건너뛰기




Volumn 41, Issue 3, 2013, Pages 290-293

Integrated production and distribution with fixed delivery departure dates

Author keywords

Fixed departure dates; Integrated production and distribution; Maximum lateness

Indexed keywords

DISTRIBUTION SCHEDULING; FINITE NUMBER; FIXED DEPARTURE DATES; INTEGRATED PRODUCTION; MAXIMUM LATENESS; NUMBER OF VEHICLES; POLYNOMIAL-TIME ALGORITHMS; PRODUCTION LINE;

EID: 84875406435     PISSN: 01676377     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.orl.2013.02.006     Document Type: Article
Times cited : (49)

References (9)
  • 1
    • 77249147436 scopus 로고    scopus 로고
    • Integrated production and outbound distribution scheduling: Review and extensions
    • Z.-L. Chen Integrated production and outbound distribution scheduling: review and extensions Operations Research 58 2010 130 148
    • (2010) Operations Research , vol.58 , pp. 130-148
    • Chen, Z.-L.1
  • 2
    • 84856599130 scopus 로고    scopus 로고
    • Coordinated scheduling of production and delivery with production window and delivery capacity constraints
    • B. Fu, Y. Hou, and H. Zhao Coordinated scheduling of production and delivery with production window and delivery capacity constraints Theoretical Computer Science 422 2012 39 51
    • (2012) Theoretical Computer Science , vol.422 , pp. 39-51
    • Fu, B.1    Hou, Y.2    Zhao, H.3
  • 5
    • 27944436124 scopus 로고    scopus 로고
    • Synchronized scheduling of assembly and multi-destination air-transportation in a consumer electronics supply chain
    • K.P. Li, V.K. Ganesan, and A.I. Sivakumar Synchronized scheduling of assembly and multi-destination air-transportation in a consumer electronics supply chain International Journal of Production Research 43 2005 2671 2685
    • (2005) International Journal of Production Research , vol.43 , pp. 2671-2685
    • Li, K.P.1    Ganesan, V.K.2    Sivakumar, A.I.3
  • 6
    • 33750012584 scopus 로고    scopus 로고
    • Scheduling of single stage assembly with air transportation in a consumer electronic supply chain
    • K.P. Li, V.K. Ganesan, and A.I. Sivakumar Scheduling of single stage assembly with air transportation in a consumer electronic supply chain Computers & Industrial Engineering 51 2006 264 278
    • (2006) Computers & Industrial Engineering , vol.51 , pp. 264-278
    • Li, K.P.1    Ganesan, V.K.2    Sivakumar, A.I.3
  • 7
    • 36048991730 scopus 로고    scopus 로고
    • Complexities and algorithms for synchronized scheduling of parallel machine assembly and air transportation in consumer electronic supply chain
    • K.P. Li, A.I. Sivakumar, and V.K. Ganesan Complexities and algorithms for synchronized scheduling of parallel machine assembly and air transportation in consumer electronic supply chain European Journal of Operational Research 187 2008 442 455
    • (2008) European Journal of Operational Research , vol.187 , pp. 442-455
    • Li, K.P.1    Sivakumar, A.I.2    Ganesan, V.K.3
  • 8
    • 9644294269 scopus 로고    scopus 로고
    • Sequencing the processing of incoming mail to match an outbound truck delivery schedule
    • Q. Wang, R. Batta, and R.J. Szczerba Sequencing the processing of incoming mail to match an outbound truck delivery schedule Computers & Operations Research 32 2005 1777 1791
    • (2005) Computers & Operations Research , vol.32 , pp. 1777-1791
    • Wang, Q.1    Batta, R.2    Szczerba, R.J.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.