메뉴 건너뛰기




Volumn 42, Issue 1, 2014, Pages 16-24

An integrated supply chain model with errors in quality inspection and learning in production

Author keywords

EOQ EPQ; Imperfect quality; Integrated modeling of supply chains; Learning curve; Lotsizing; Supply chain coordination

Indexed keywords

DECISION MAKING; ERRORS; HUMAN RESOURCE MANAGEMENT; INSPECTION; PERSONNEL TRAINING; PRODUCT DESIGN;

EID: 84875255985     PISSN: 03050483     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.omega.2013.02.002     Document Type: Article
Times cited : (188)

References (51)
  • 1
    • 0016034767 scopus 로고
    • The effects of learning on optimal lot size determination-single product case
    • Adler GL, Nanda R. The effects of learning on optimal lot size determination-single product case. AIIE Transactions 1974, 6:614. -20.
    • (1974) AIIE Transactions , vol.6 , pp. 614-620
    • Adler, G.L.1    Nanda, R.2
  • 3
    • 0025021555 scopus 로고
    • Learning curves in manufacturing
    • Argote L, Epple D. Learning curves in manufacturing. Science 1990, 247:920-924.
    • (1990) Science , vol.247 , pp. 920-924
    • Argote, L.1    Epple, D.2
  • 4
    • 84985846646 scopus 로고
    • A joint economic-lot-size model for purchaser and vendor
    • Banerjee A. A joint economic-lot-size model for purchaser and vendor. Decision Sciences 1986, 17:292-311.
    • (1986) Decision Sciences , vol.17 , pp. 292-311
    • Banerjee, A.1
  • 5
    • 0033099395 scopus 로고    scopus 로고
    • Multistage lot sizing models with imperfect processes and inspection errors
    • Ben-Daya M, Rahim A Multistage lot sizing models with imperfect processes and inspection errors. Production Planning & Control 1999, 10:118-126.
    • (1999) Production Planning & Control , vol.10 , pp. 118-126
    • Ben-Daya, M.1    Rahim, A.2
  • 7
    • 0242333836 scopus 로고    scopus 로고
    • Optimal lot-sizing, quality improvement and inspection errors for multistage production systems
    • Ben-Daya M, Rahim A Optimal lot-sizing, quality improvement and inspection errors for multistage production systems. International Journal of Production Research 2003, 41:65-79.
    • (2003) International Journal of Production Research , vol.41 , pp. 65-79
    • Ben-Daya, M.1    Rahim, A.2
  • 8
    • 0016097940 scopus 로고
    • Economic effects of inspection error on attribute sampling plans
    • Bennett GK, Case KE, Schmidt JW Economic effects of inspection error on attribute sampling plans. Naval Research Logistics 1974, 21:431-443.
    • (1974) Naval Research Logistics , vol.21 , pp. 431-443
    • Bennett, G.K.1    Case, K.E.2    Schmidt, J.W.3
  • 9
    • 79953163480 scopus 로고    scopus 로고
    • Joint modified block replacement and production/inventory control policy for a failure-prone manufacturing cell
    • Berthaut F, Gharbi A, Dhouib K. Joint modified block replacement and production/inventory control policy for a failure-prone manufacturing cell. Omega 2011, 39:642-654.
    • (2011) Omega , vol.39 , pp. 642-654
    • Berthaut, F.1    Gharbi, A.2    Dhouib, K.3
  • 10
    • 46149106627 scopus 로고    scopus 로고
    • An integrated production-inventory deteriorating model for pricing policy considering imperfect production, inspection planning and warranty-period- and stock-level-dependent demand
    • Chung CJ, Wee HM An integrated production-inventory deteriorating model for pricing policy considering imperfect production, inspection planning and warranty-period- and stock-level-dependent demand. International Journal of Systems Science 2008, 39:823-837.
    • (2008) International Journal of Systems Science , vol.39 , pp. 823-837
    • Chung, C.J.1    Wee, H.M.2
  • 11
    • 84944981984 scopus 로고
    • Using the learning curve as a management tool
    • Cunningham J Using the learning curve as a management tool. IEEE Spectrum 1980, 17:43-48.
    • (1980) IEEE Spectrum , vol.17 , pp. 43-48
    • Cunningham, J.1
  • 13
    • 0000068350 scopus 로고
    • Treating progress functions as a managerial opportunity
    • Dutton J, Thomas A Treating progress functions as a managerial opportunity. Academic Management Review 1984, 9:235-247.
    • (1984) Academic Management Review , vol.9 , pp. 235-247
    • Dutton, J.1    Thomas, A.2
  • 14
  • 16
    • 84985781712 scopus 로고
    • A joint economic-lot-size model for purchaser and vendor: a comment
    • Goyal SK A joint economic-lot-size model for purchaser and vendor: a comment. Decision Sciences 1988, 19:236-241.
    • (1988) Decision Sciences , vol.19 , pp. 236-241
    • Goyal, S.K.1
  • 17
    • 0036568439 scopus 로고    scopus 로고
    • Note on: economic production quantity model for items with imperfect quality - a practical approach
    • Goyal SK, Caórdenas-Barroón LE Note on: economic production quantity model for items with imperfect quality - a practical approach. International Journal of Production Economics 2002, 77:85-87.
    • (2002) International Journal of Production Economics , vol.77 , pp. 85-87
    • Goyal, S.K.1    Caórdenas-Barroón, L.E.2
  • 18
    • 0347763702 scopus 로고    scopus 로고
    • A simple integrated production policy of an imperfect item for vendor and buyer
    • Goyal SK, Huang CK, Chen KC A simple integrated production policy of an imperfect item for vendor and buyer. Production Planning and Control 2003, 14:596-602.
    • (2003) Production Planning and Control , vol.14 , pp. 596-602
    • Goyal, S.K.1    Huang, C.K.2    Chen, K.C.3
  • 21
    • 85170008639 scopus 로고    scopus 로고
    • Erratum to An economic order quantity (EOQ) for items with imperfect quality and inspection errors
    • [ International Journal of Production Economics 136 (2012) 253]
    • Hsu LF Erratum to An economic order quantity (EOQ) for items with imperfect quality and inspection errors. International Journal of Production Economics 2011, 133:113-118. [ International Journal of Production Economics 136 (2012) 253].
    • (2011) International Journal of Production Economics , vol.133 , pp. 113-118
    • Hsu, L.F.1
  • 22
    • 0036610166 scopus 로고    scopus 로고
    • An integrated vendor-buyer cooperative inventory model for items with imperfect quality
    • Huang CK An integrated vendor-buyer cooperative inventory model for items with imperfect quality. Production Planning and Control 2002, 13:355-361.
    • (2002) Production Planning and Control , vol.13 , pp. 355-361
    • Huang, C.K.1
  • 23
    • 0031622471 scopus 로고    scopus 로고
    • The effects of learning and forgetting on the optimal lot size quantity of intermittent production runs
    • Jaber MY, Bonney M The effects of learning and forgetting on the optimal lot size quantity of intermittent production runs. Production Planning & Control 1998, 9:20-27.
    • (1998) Production Planning & Control , vol.9 , pp. 20-27
    • Jaber, M.Y.1    Bonney, M.2
  • 24
    • 0032649356 scopus 로고    scopus 로고
    • The economic manufacture/order quantity (EMQ/EOQ) and the learning curve: past, present, and future
    • Jaber MY, Bonney M The economic manufacture/order quantity (EMQ/EOQ) and the learning curve: past, present, and future. International Journal of Production Economics 1999, 59:93-102.
    • (1999) International Journal of Production Economics , vol.59 , pp. 93-102
    • Jaber, M.Y.1    Bonney, M.2
  • 25
    • 53549086386 scopus 로고    scopus 로고
    • Coordinating a three-level supply chain with multiple suppliers, a vendor and multiple buyers
    • Jaber MY, Goyal SK Coordinating a three-level supply chain with multiple suppliers, a vendor and multiple buyers. International Journal of Production Economics 2008, 116:95-103.
    • (2008) International Journal of Production Economics , vol.116 , pp. 95-103
    • Jaber, M.Y.1    Goyal, S.K.2
  • 26
    • 53549085479 scopus 로고    scopus 로고
    • Quantitative models for centralized supply chain coordination
    • I-Tech Educatinal and Publishing, Vienna, [Chapter 17], V. Kordic (Ed.)
    • Jaber MY, Zolfaghari S Quantitative models for centralized supply chain coordination. Supply Chains: Theory and Applications 2008, I-Tech Educatinal and Publishing, Vienna, pp. 307-338 [Chapter 17]. V. Kordic (Ed.).
    • (2008) Supply Chains: Theory and Applications , pp. 307-338
    • Jaber, M.Y.1    Zolfaghari, S.2
  • 28
    • 84867053140 scopus 로고    scopus 로고
    • An integrated production and inventory model for a whole manufacturing supply chain involving reverse logistics with finite horizon period
    • Jonrinaldi Zhang DZ. An integrated production and inventory model for a whole manufacturing supply chain involving reverse logistics with finite horizon period. Omega 2013, 41:598-620.
    • (2013) Omega , vol.41 , pp. 598-620
    • Jonrinaldi, Z.D.Z.1
  • 29
    • 74449083819 scopus 로고    scopus 로고
    • Economic order quantity model for items with imperfect quality with learning in inspection
    • Khan M, Jaber MY, Wahab WIM Economic order quantity model for items with imperfect quality with learning in inspection. International Journal of Production Economics 2010, 124:87-96.
    • (2010) International Journal of Production Economics , vol.124 , pp. 87-96
    • Khan, M.1    Jaber, M.Y.2    Wahab, W.I.M.3
  • 30
    • 79955470375 scopus 로고    scopus 로고
    • An economic order quantity (EOQ) for items with imperfect quality and inspection errors
    • Khan M, Jaber MY, Bonney M An economic order quantity (EOQ) for items with imperfect quality and inspection errors. International Journal of Production Economics 2011, 133:113-118.
    • (2011) International Journal of Production Economics , vol.133 , pp. 113-118
    • Khan, M.1    Jaber, M.Y.2    Bonney, M.3
  • 33
    • 34249688614 scopus 로고    scopus 로고
    • Economic ordering policy for an item with imperfect quality subject to the in-house inspection
    • Konstantaras I, Goyal SK, Papachristos S Economic ordering policy for an item with imperfect quality subject to the in-house inspection. International Journal of Systems Science 2007, 38:473-482.
    • (2007) International Journal of Systems Science , vol.38 , pp. 473-482
    • Konstantaras, I.1    Goyal, S.K.2    Papachristos, S.3
  • 34
  • 37
    • 0022613610 scopus 로고
    • Optimal lot sizing, process quality improvement and setup cost reduction
    • Porteus EL Optimal lot sizing, process quality improvement and setup cost reduction. Operations Research 1986, 34:137-144.
    • (1986) Operations Research , vol.34 , pp. 137-144
    • Porteus, E.L.1
  • 38
    • 0020810766 scopus 로고
    • A cost-minimization model for multicharacteristic component inspection
    • Raouf A, Jain JK, Sathe PT A cost-minimization model for multicharacteristic component inspection. IIE Transactions 1983, 15:187-194.
    • (1983) IIE Transactions , vol.15 , pp. 187-194
    • Raouf, A.1    Jain, J.K.2    Sathe, P.T.3
  • 39
    • 0022676316 scopus 로고
    • Economic production cycles with imperfect production processes
    • Rosenblatt MJ, Lee HL Economic production cycles with imperfect production processes. IIE Transactions 1986, 18:48-55.
    • (1986) IIE Transactions , vol.18 , pp. 48-55
    • Rosenblatt, M.J.1    Lee, H.L.2
  • 40
    • 0027700977 scopus 로고
    • Mathematical modelling of the effect of human learning in the finite production inventory model
    • Salameh MK, Abdul-Malak MAU, Jaber MY Mathematical modelling of the effect of human learning in the finite production inventory model. Applied Mathematical Modelling 1993, 17:613-615.
    • (1993) Applied Mathematical Modelling , vol.17 , pp. 613-615
    • Salameh, M.K.1    Abdul-Malak, M.A.U.2    Jaber, M.Y.3
  • 43
    • 0016924731 scopus 로고
    • Establishing the order quantity when the amount received is uncertain
    • Silver EA Establishing the order quantity when the amount received is uncertain. INFOR 1976, 14:32-39.
    • (1976) INFOR , vol.14 , pp. 32-39
    • Silver, E.A.1
  • 44
    • 0035427489 scopus 로고    scopus 로고
    • Questioning the rules of dynamic lot sizing rules
    • Simpson NC Questioning the rules of dynamic lot sizing rules. Computers & Operations Research 2001, 28:899-914.
    • (2001) Computers & Operations Research , vol.28 , pp. 899-914
    • Simpson, N.C.1
  • 46
    • 10444289915 scopus 로고    scopus 로고
    • Integrated production and product inspection policy for a deteriorating production system
    • Wang CH Integrated production and product inspection policy for a deteriorating production system. International Journal of Production Economics 2005, 95:123-134.
    • (2005) International Journal of Production Economics , vol.95 , pp. 123-134
    • Wang, C.H.1
  • 47
    • 33748163005 scopus 로고    scopus 로고
    • Optimal inventory model for items with imperfect quality and shortage backordering
    • Wee HM, Yu J, Chen MC Optimal inventory model for items with imperfect quality and shortage backordering. Omega 2007, 35:7-11.
    • (2007) Omega , vol.35 , pp. 7-11
    • Wee, H.M.1    Yu, J.2    Chen, M.C.3
  • 48
    • 70349620176 scopus 로고    scopus 로고
    • Lean supply chain and its effect on product cost and quality: a case study on Ford Motor Company
    • Wee HM, Wu S Lean supply chain and its effect on product cost and quality: a case study on Ford Motor Company. International Journal of Supply Chain Management 2009, 14:335-341.
    • (2009) International Journal of Supply Chain Management , vol.14 , pp. 335-341
    • Wee, H.M.1    Wu, S.2
  • 49
    • 84873820359 scopus 로고    scopus 로고
    • A production model for deteriorating items with stochastic preventive maintenance time and rework process with FIFO rule
    • Wee HM, Widyadana GA. A production model for deteriorating items with stochastic preventive maintenance time and rework process with FIFO rule. Omega 2013, 41:941-954.
    • (2013) Omega , vol.41 , pp. 941-954
    • Wee, H.M.1    Widyadana, G.A.2
  • 50
    • 0343812961 scopus 로고
    • Learning considerations with economic order quantity
    • Wortham AW, Mayyasi AM Learning considerations with economic order quantity. AIIE Transactions 1972, 4:69-71.
    • (1972) AIIE Transactions , vol.4 , pp. 69-71
    • Wortham, A.W.1    Mayyasi, A.M.2
  • 51
    • 0001250106 scopus 로고
    • Factors affecting the cost of airplanes
    • Wright T Factors affecting the cost of airplanes. Journal of Aeronautical Science 1936, 3:122-128.
    • (1936) Journal of Aeronautical Science , vol.3 , pp. 122-128
    • Wright, T.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.