Incorporating residential AC load control into ancillary service markets: Measurement and settlement

Author keywords

Ancillary services; Load management; Measurement

Indexed keywords

AIR CONDITIONING; COMMERCE; DOMESTIC APPLIANCES; ELECTRIC LOAD MANAGEMENT; HOUSING; MEASUREMENT; REGRESSION ANALYSIS;

EID: 84875214002     PISSN: 03014215     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.enpol.2012.12.024     Document Type: Article
Times cited : (19)

References (20)
  • 1
    • 84875581380 scopus 로고    scopus 로고
    • Assessment of Settlement Baseline Methods for Ontario Power Authority's Commercial a Industrial Event Based Demand Response Programs
    • Bode, J., M. Perry, Morgan, S., 2010. Assessment of Settlement Baseline Methods for Ontario Power Authority's Commercial a Industrial Event Based Demand Response Programs. Prepared for Ontario Power Authority.
    • (2010) Prepared for Ontario Power Authority
    • Bode, J.1    Perry, M.2    Morgan, S.3
  • 2
    • 84875212228 scopus 로고    scopus 로고
    • Load Impact Evaluation of California Statewide Aggregator Demand Response Programs, vol. 2. Baseline Analysis of AMP Aggregator Demand Response Program
    • Braithwait, S., Armstrong, D., 2009. Load Impact Evaluation of California Statewide Aggregator Demand Response Programs, vol. 2. Baseline Analysis of AMP Aggregator Demand Response Program. Prepared for the California Demand Response Measurement and Evaluation Committee.
    • (2009) Prepared for the California Demand Response Measurement and Evaluation Committee
    • Braithwait, S.1    Armstrong, D.2
  • 3
    • 84875212877 scopus 로고    scopus 로고
    • Highly Volatile-Load Customer Study
    • Pacific Gas and Electric, and San Diego Gas and Electric
    • Braithwait, S., Armstrong, D., 2010. Highly Volatile-Load Customer Study. Prepared for Southern California Edison, Pacific Gas and Electric, and San Diego Gas and Electric.
    • (2010) Prepared for Southern California Edison
    • Braithwait, S.1    Armstrong, D.2
  • 4
    • 76249102712 scopus 로고    scopus 로고
    • Estimating Demand Response Load Impacts: Evaluation of Baseline Load Models for Non-Residential Buildings in California
    • LBNL-63728
    • Coughlin, K., Piette, M.A., Goldman, C., Kiliccote, S., 2008. Estimating Demand Response Load Impacts: Evaluation of Baseline Load Models for Non-Residential Buildings in California. Ernest Orlando Lawrence Berkeley National Laboratory. LBNL-63728. http://www.eetd.lbl.gov/ea/EMS/EMS_pubs.html.
    • (2008) Ernest Orlando Lawrence Berkeley National Laboratory
    • Coughlin, K.1    Piette, M.A.2    Goldman, C.3    Kiliccote, S.4
  • 5
    • 84875226204 scopus 로고    scopus 로고
    • Kueck, J., Kirby B.Oak Ridge National Laboratory; Dagle, J., Pacific Northwest National Laboratory; Alvarado, F., Mount, T., Oren, S., PSERC; Martinez, C., Southern California Edison, 2010. An R&D Agenda to Enhance Electricity System Reliability by Increasing Customer Participation in Emerging Competitive Markets. IEEE Power Engineering Society Winter Meeting, January
    • Eto, J., Marnay, C., Goldman, C. Lawrence Berkeley National Laboratory; Kueck, J., Kirby B.Oak Ridge National Laboratory; Dagle, J., Pacific Northwest National Laboratory; Alvarado, F., Mount, T., Oren, S., PSERC; Martinez, C., Southern California Edison, 2010. An R&D Agenda to Enhance Electricity System Reliability by Increasing Customer Participation in Emerging Competitive Markets. IEEE Power Engineering Society Winter Meeting, January 28-31, 2001.
    • (2001) Lawrence Berkeley National Laboratory , Issue.28-31
    • Eto, J.1    Marnay, C.2    Goldman, C.3
  • 8
    • 84875216563 scopus 로고    scopus 로고
    • 2010 Assessment of Demand Response and Advanced Metering. Available at
    • Federal Regulatory Energy Commission, 2011. 2010 Assessment of Demand Response and Advanced Metering. Available at http://www.ferc.gov/industries/electric/indus-act/demand-response/2010/survey.asp.
    • (2011) Federal Regulatory Energy Commission
  • 9
    • 84875219853 scopus 로고    scopus 로고
    • 2011 Statewide Evaluation of California Aggregator Demand Response Programs
    • Prepared for Pacific Gas & Electric, Sand Diego Gas & Electric and Southern California Edison. Submitted to the California Public Utilities Commission on June 1, 2012. Available at
    • George, S.G., Bode, J., Berghman, D., 2012. 2011 Statewide Evaluation of California Aggregator Demand Response Programs, vol. II. Baseline Calculation Rules and Accuracy. Prepared for Pacific Gas & Electric, Sand Diego Gas & Electric and Southern California Edison. Submitted to the California Public Utilities Commission on June 1, 2012. Available at: http://www.apps.pge.com/regulation/search.aspx.
    • (2012) Baseline Calculation Rules and Accuracy , vol.2
    • George, S.G.1    Bode, J.2    Berghman, D.3
  • 13
    • 84875211917 scopus 로고    scopus 로고
    • Protocol Development For Demand Response Calculation-Findings and Recommendations
    • KEMA, Inc.
    • KEMA, Inc., 2003. Protocol Development For Demand Response Calculation-Findings and Recommendations. Prepared for the California Energy Commission. http://www.energy.ca.gov/reports/2003-03-10_400-02-017F.PDF.
    • (2003) Prepared for the California Energy Commission
  • 14
    • 84875227545 scopus 로고    scopus 로고
    • Pacific Gas & Electric SmartAC™ 2008 Residential Ex Post Load Impact Evaluation and Ex Ante Load Impact Estimates
    • KEMA, Inc.
    • KEMA, Inc., 2009. Pacific Gas & Electric SmartAC™ 2008 Residential Ex Post Load Impact Evaluation and Ex Ante Load Impact Estimates. Prepared for Pacific Gas & Electric. http://www.calmac.org/publications/FINAL_SmartAC_Load_Impact_2009_03_31_-_CALMAC_Study_Id_PGE0278.01.pdf.
    • (2009) Prepared for Pacific Gas & Electric
  • 15
    • 84875210876 scopus 로고    scopus 로고
    • PJM Empirical Analysis of Demand Response Baseline Methods
    • KEMA, Inc.
    • KEMA, Inc., 2011. PJM Empirical Analysis of Demand Response Baseline Methods. Prepared for the PJM Markets Implementation Committee. http://pjm.com/markets-and-operations/demand-response/~/media/markets-ops/dsr/pjm-analysis-of-dr-baseline-methods-full-report.ashx.
    • (2011) Prepared for the PJM Markets Implementation Committee
  • 19
    • 84875222030 scopus 로고    scopus 로고
    • Working Group 2 Demand Response Program Evaluation-Program Year 2004 Final Report
    • Quantum Consulting and Summit Blue Consulting
    • Quantum Consulting and Summit Blue Consulting, 2004. Working Group 2 Demand Response Program Evaluation-Program Year 2004 Final Report. Prepared for the California Public Utilities Commission.
    • (2004) Prepared for the California Public Utilities Commission


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.