메뉴 건너뛰기




Volumn 2013, Issue , 2013, Pages

A cost model for integrated logistic support activities

Author keywords

[No Author keywords available]

Indexed keywords


EID: 84874831775     PISSN: 16879147     EISSN: 16879155     Source Type: Journal    
DOI: 10.1155/2013/127497     Document Type: Article
Times cited : (5)

References (10)
  • 2
    • 0042151621 scopus 로고
    • Life cycle costing: A decision-making tool for capital equipment acquisition
    • Kaufman R. J., Life cycle costing: a decision-making tool for capital equipment acquisition. Cost and Management 1970 2 21 28
    • (1970) Cost and Management , vol.2 , pp. 21-28
    • Kaufman, R.J.1
  • 3
    • 25844491812 scopus 로고    scopus 로고
    • A model for preventive maintenance planning by genetic algorithms based in cost and reliability
    • DOI 10.1016/j.ress.2005.01.004, PII S0951832005000414, Selected Papers Presented at QUALITA 2003
    • Lapa C. M. F., Pereira C. M. N. A., De Barros M. P., A model for preventive maintenance planning by genetic algorithms based in cost and reliability. Reliability Engineering and System Safety 2006 91 2 233 240 2-s2.0-25844491812 10.1016/j.ress.2005.01.004 (Pubitemid 41394421)
    • (2006) Reliability Engineering and System Safety , vol.91 , Issue.2 , pp. 233-240
    • Lapa, C.M.F.1    Pereira, C.M.N.A.2    De Barros, M.P.3
  • 4
    • 20144378507 scopus 로고    scopus 로고
    • Optimization for condition-based maintenance with semi-Markov decision process
    • DOI 10.1016/j.ress.2004.11.001, PII S0951832004002601
    • Chen D., Trivedi K. S., Optimization for condition-based maintenance with semi-Markov decision process. Reliability Engineering and System Safety 2005 90 1 25 29 2-s2.0-20144378507 10.1016/j.ress.2004.11.001 (Pubitemid 40773951)
    • (2005) Reliability Engineering and System Safety , vol.90 , Issue.1 , pp. 25-29
    • Chen, D.1    Trivedi, K.S.2
  • 5
    • 77949285111 scopus 로고    scopus 로고
    • Determining the periodic maintenance interval for guaranteeing the availability of a system with a linearly increasing hazard rate: Industry application
    • 2-s2.0-77949285111
    • Woohyun K., Suneung A., Yang J., Determining the periodic maintenance interval for guaranteeing the availability of a system with a linearly increasing hazard rate: industry application. International Journal of Industrial Engineering 2009 16 2 126 134 2-s2.0-77949285111
    • (2009) International Journal of Industrial Engineering , vol.16 , Issue.2 , pp. 126-134
    • Woohyun, K.1    Suneung, A.2    Yang, J.3
  • 6
    • 0344286061 scopus 로고    scopus 로고
    • Concurrent optimization in designing for logistics support
    • 2-s2.0-0344286061 10.1016/S0377-2217(98)00082-4
    • Hatch M. L., Badinelli R. D., Concurrent optimization in designing for logistics support. European Journal of Operational Research 1999 115 1 77 97 2-s2.0-0344286061 10.1016/S0377-2217(98)00082-4
    • (1999) European Journal of Operational Research , vol.115 , Issue.1 , pp. 77-97
    • Hatch, M.L.1    Badinelli, R.D.2
  • 9
    • 0032046060 scopus 로고    scopus 로고
    • Product life cycle cost analysis: State of the art review
    • Asiedu Y., Gu P., Product life cycle cost analysis: state of the art review. International Journal of Production Research 1998 36 4 883 908 2-s2.0-0032046060 (Pubitemid 128553180)
    • (1998) International Journal of Production Research , vol.36 , Issue.4 , pp. 883-908
    • Asiedu, Y.1    Gu, P.2
  • 10
    • 77949299510 scopus 로고    scopus 로고
    • Improving decision making in the early phases of configuration projects
    • 2-s2.0-77949299510
    • Mortensen N. H., Harlou U., Haug A., Improving decision making in the early phases of configuration projects. International Journal of Industrial Engineering 2008 15 2 185 194 2-s2.0-77949299510
    • (2008) International Journal of Industrial Engineering , vol.15 , Issue.2 , pp. 185-194
    • Mortensen, N.H.1    Harlou, U.2    Haug, A.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.