|
Volumn 226, Issue 6, 2012, Pages 641-649
|
Managing avalanches using cost-benefit-risk analysis
|
Author keywords
avalanches; cost; Malmbanan (Swedish Iron Ore Line); railway; Risk analysis
|
Indexed keywords
CLIMATE CONDITION;
CONTINENTAL CLIMATE;
CONTROL AND MONITORING;
HAZARD AREAS;
HEAVY RAINFALL;
HIGH MOUNTAINS;
MARITIME CLIMATE;
OPERATIONAL DATA;
RAILWAY;
RISK EVALUATION;
ROCKFALLS;
ROUGH TERRAINS;
SHORT BRIDGES;
SNOW AVALANCHE;
SNOW-MELTING;
SPRING TEMPERATURES;
SUB-ARCTIC;
SWEDISHS;
TECHNICAL SYSTEMS;
TRAIN OPERATIONS;
BRIDGES;
COST EFFECTIVENESS;
COSTS;
GLOBAL WARMING;
IRON ORES;
METEOROLOGY;
RAILROAD TRANSPORTATION;
RAILROADS;
RISK ANALYSIS;
ROCK BURSTS;
WATER LEVELS;
AVALANCHES (SNOWSLIDES);
|
EID: 84874625808
PISSN: 09544097
EISSN: 20413017
Source Type: Journal
DOI: 10.1177/0954409712447168 Document Type: Conference Paper |
Times cited : (4)
|
References (23)
|