-
1
-
-
80053506935
-
-
ASCE, St. Louis MO 18-21 May
-
Agrawal, A.K., Qian, G., Kawaguchi, A., Lagace, S., Delisle, R., Kelly, B., Weykamp, P., Conway, T., Dublin, E. Deterioration rates of typical bridge elements in New York ASCE, St. Louis MO 2006 18-21 May
-
(2006)
Deterioration Rates of Typical Bridge Elements in New York
-
-
Agrawal, A.K.1
Qian, G.2
Kawaguchi, A.3
Lagace, S.4
Delisle, R.5
Kelly, B.6
Weykamp, P.7
Conway, T.8
Dublin, E.9
-
2
-
-
34249684351
-
Modeling and prediction with a class of time delay dynamic neural networks
-
Becerikli, Y., Oysal, Y. Modeling and prediction with a class of time delay dynamic neural networks Journal of Applied Soft Computing 7 4 2007 1164-9
-
(2007)
Journal of Applied Soft Computing
, vol.7
, Issue.4
, pp. 1164-1169
-
-
Becerikli, Y.1
Oysal, Y.2
-
3
-
-
0032097946
-
Method for estimating transition probability in bridge deterioration models
-
DeStefano, P.D., Grivas, D.A. Method for estimating transition probability in bridge deterioration models Journal of Infrastructure System 4 2 1998 56-62
-
(1998)
Journal of Infrastructure System
, vol.4
, Issue.2
, pp. 56-62
-
-
Destefano, P.D.1
Grivas, D.A.2
-
4
-
-
0004199140
-
-
University of California, Addison-Wesley San Diego, CA
-
Hecht-Nielsen, R. Neurocomputing University of California, Addison-Wesley San Diego, CA 1990
-
(1990)
Neurocomputing
-
-
Hecht-Nielsen, R.1
-
5
-
-
41749086209
-
Improving the reliability of a bridge management system (BMS) using an ANN-based backward prediction model (BPM)
-
Lee, J.H., Sanmugarasa, K., Loo, Y.C., Blumenstein, M. Improving the reliability of a bridge management system (BMS) using an ANN-based backward prediction model (BPM) Journal of Automation in Construction 17 6 2008 758-72
-
(2008)
Journal of Automation in Construction
, vol.17
, Issue.6
, pp. 758-772
-
-
Lee, J.H.1
Sanmugarasa, K.2
Loo, Y.C.3
Blumenstein, M.4
-
6
-
-
0029308515
-
Poisson regression models of infrastructure transition probabilities
-
Madanat, S., Ibrahim, W.H.W. Poisson regression models of infrastructure transition probabilities Journal of Transportation Engineering 121 3 1995 267-72
-
(1995)
Journal of Transportation Engineering
, vol.121
, Issue.3
, pp. 267-272
-
-
Madanat, S.1
Ibrahim, W.H.W.2
-
7
-
-
0031102980
-
Probabilistic infrastructure deterioration models with panel data
-
Madanat, S.M., Karlaftis, M.G., McCarthy, P.S. Probabilistic infrastructure deterioration models with panel data Journal of Infrastructure System, ASCE 3 1 1997 120-5
-
(1997)
Journal of Infrastructure System, ASCE
, vol.3
, Issue.1
, pp. 120-125
-
-
Madanat, S.M.1
Karlaftis, M.G.2
McCarthy, P.S.3
-
8
-
-
0035366973
-
Semiparametric hazard rate models of reinforced concrete bridge deck deterioration
-
Mauch, M., Madanat, S. Semiparametric hazard rate models of reinforced concrete bridge deck deterioration Journal of Infrastructure Systems 7 2 2001 49-57
-
(2001)
Journal of Infrastructure Systems
, vol.7
, Issue.2
, pp. 49-57
-
-
Mauch, M.1
Madanat, S.2
-
10
-
-
80053462486
-
Improving reliability of bridge deterioration model using generated missing condition ratings
-
CD-ROM Proceedings, Jeju, 27-30 May
-
Son, J.B., Lee, J.H., Blumenstein, M., Loo, Y.C., Guan, H., Panuwatwanich, K. Improving reliability of bridge deterioration model using generated missing condition ratings 2009 3rd International Conference on Construction Engineering and Management (ICCEM), CD-ROM Proceedings, Jeju, 27-30 May
-
(2009)
3rd International Conference on Construction Engineering and Management (ICCEM)
-
-
Son, J.B.1
Lee, J.H.2
Blumenstein, M.3
Loo, Y.C.4
Guan, H.5
Panuwatwanich, K.6
-
12
-
-
0024634603
-
Phoneme recognition using time-delay neural networks
-
Waibel, A., Hanazawam, T., Hinton, G., Shikano, K., Lang, K.J. Phoneme recognition using time-delay neural networks Journal of Transaction on Acoustic, Speech and Signal Processing 37 3 1989 86-95
-
(1989)
Journal of Transaction on Acoustic, Speech and Signal Processing
, vol.37
, Issue.3
, pp. 86-95
-
-
Waibel, A.1
Hanazawam, T.2
Hinton, G.3
Shikano, K.4
Lang, K.J.5
-
13
-
-
33847223427
-
Using time-delay neural network combined with genetic algorithms to predict runoff level of Linshan watershed, Schuan, China
-
Wang, X.K., Lu, W.Z., Cao, S.Y., Fang, D. Using time-delay neural network combined with genetic algorithms to predict runoff level of Linshan watershed, Schuan, China Journal of Hydrologic Engineering 12 2 2007 231-6
-
(2007)
Journal of Hydrologic Engineering
, vol.12
, Issue.2
, pp. 231-236
-
-
Wang, X.K.1
Lu, W.Z.2
Cao, S.Y.3
Fang, D.4
-
14
-
-
16644384670
-
Short-term traffic prediction on different types of roads with genetically designed regression and time delay neural network models
-
Zhong, M., Sharma, S., Lingras, P. Short-term traffic prediction on different types of roads with genetically designed regression and time delay neural network models Journal of Computing in Civil Engineering 19 1 2005 94-103
-
(2005)
Journal of Computing in Civil Engineering
, vol.19
, Issue.1
, pp. 94-103
-
-
Zhong, M.1
Sharma, S.2
Lingras, P.3
|