-
2
-
-
0032811721
-
Analyzing agricultural demand for water with an optimizing model
-
Amir I, Fisher FM (1999) Analyzing agricultural demand for water with an optimizing model. Agric Syst 61: 45-56.
-
(1999)
Agric Syst
, vol.61
, pp. 45-56
-
-
Amir, I.1
Fisher, F.M.2
-
3
-
-
20344375265
-
-
CDDC (Center for Digital Discourse and Culture), Virginia Tech, Blacksburg, Virginia 24061
-
CDDC (Center for Digital Discourse and Culture) (2004) Choices and challenges project: sharing the earth's water supply, Virginia Tech, Blacksburg, Virginia 24061.
-
(2004)
Choices and challenges project: Sharing the earth's water supply
-
-
-
4
-
-
20344370954
-
Sustainable water resources management under uncertainty
-
Chang NB (2005) Sustainable water resources management under uncertainty. Stoch Env Res Risk Assess 19: 97-98.
-
(2005)
Stoch Env Res Risk Assess
, vol.19
, pp. 97-98
-
-
Chang, N.B.1
-
6
-
-
77955771096
-
-
EBCZR (Editorial Board of Chorography of Zhangweinan River), Tianjin Science & Technology Press, Tianjin
-
EBCZR (Editorial Board of Chorography of Zhangweinan River) (2003) Chorography of Zhangweinan River. Tianjin Science & Technology Press, Tianjin.
-
(2003)
Chorography of Zhangweinan River
-
-
-
7
-
-
0004656668
-
Optimal operation of reservoirs by stochastic programming
-
Eiger G, Shamir U (1991) Optimal operation of reservoirs by stochastic programming. Eng Optim 17: 293-312.
-
(1991)
Eng Optim
, vol.17
, pp. 293-312
-
-
Eiger, G.1
Shamir, U.2
-
9
-
-
84859045028
-
A robust two-step method for solving interval linear programming problems within an environmental management context
-
Fan YR, Huang GH (2012) A robust two-step method for solving interval linear programming problems within an environmental management context. J Environ Inform 19(1): 1-12.
-
(2012)
J Environ Inform
, vol.19
, Issue.1
, pp. 1-12
-
-
Fan, Y.R.1
Huang, G.H.2
-
10
-
-
0032203397
-
A dynamic programming two-stage algorithm for long-term hydrothermal scheduling of multireservoir systems
-
Ferrero RW, Riviera JF, Shahidehpour SM (1998) A dynamic programming two-stage algorithm for long-term hydrothermal scheduling of multireservoir systems. Trans Power Syst 13(4): 1534-1540.
-
(1998)
Trans Power Syst
, vol.13
, Issue.4
, pp. 1534-1540
-
-
Ferrero, R.W.1
Riviera, J.F.2
Shahidehpour, S.M.3
-
11
-
-
84874200735
-
In analyzing water resources systems, two-stage stochastic programming (TSP), as one inexact optimization methods was adopted widely for planning water resources systems under uncertainty
-
Francesco V (2011) In analyzing water resources systems, two-stage stochastic programming (TSP), as one inexact optimization methods was adopted widely for planning water resources systems under uncertainty. Eur J Oper Res 212: 583-595.
-
(2011)
Eur J Oper Res
, vol.212
, pp. 583-595
-
-
Francesco, V.1
-
12
-
-
59149102825
-
Two-stage fuzzy chance-constrained programming: application to water resources management under dual uncertainties
-
Guo P, Huang GH (2009) Two-stage fuzzy chance-constrained programming: application to water resources management under dual uncertainties. Stoch Env Res Risk Assess 23(3): 349-359.
-
(2009)
Stoch Env Res Risk Assess
, vol.23
, Issue.3
, pp. 349-359
-
-
Guo, P.1
Huang, G.H.2
-
13
-
-
71649112412
-
An inexact fuzzy-chance-constrained two-stage mixed-integer linear programming approach for flood diversion planning under multiple uncertainties
-
Guo P, Huang GH, Li YP (2010) An inexact fuzzy-chance-constrained two-stage mixed-integer linear programming approach for flood diversion planning under multiple uncertainties. Adv Water Resour 33(1): 81-91.
-
(2010)
Adv Water Resour
, vol.33
, Issue.1
, pp. 81-91
-
-
Guo, P.1
Huang, G.H.2
Li, Y.P.3
-
15
-
-
0029710472
-
IPWM: an interval parameter water quality management model
-
Huang GH (1996) IPWM: an interval parameter water quality management model. Eng Optim 26: 79-103.
-
(1996)
Eng Optim
, vol.26
, pp. 79-103
-
-
Huang, G.H.1
-
16
-
-
79959609849
-
Analysis of solution methods for interval linear programming
-
Huang GH, Cao MF (2011) Analysis of solution methods for interval linear programming. J Environ Inform 17(2): 54-64.
-
(2011)
J Environ Inform
, vol.17
, Issue.2
, pp. 54-64
-
-
Huang, G.H.1
Cao, M.F.2
-
17
-
-
0033897683
-
An inexact two-stage stochastic programming model for water resources management under uncertainty
-
Huang GH, Loucks DP (2000) An inexact two-stage stochastic programming model for water resources management under uncertainty. Civ Eng Environ Syst 17: 95-118.
-
(2000)
Civ Eng Environ Syst
, vol.17
, pp. 95-118
-
-
Huang, G.H.1
Loucks, D.P.2
-
18
-
-
0026839746
-
Optimization model for alternative use of different quality irrigation water
-
Javaid A, David N (1992) Optimization model for alternative use of different quality irrigation water. J Irrigation Drainage Eng 18(2): 218-228.
-
(1992)
J Irrigation Drainage Eng
, vol.18
, Issue.2
, pp. 218-228
-
-
Javaid, A.1
David, N.2
-
19
-
-
84904240046
-
A linear two-stage stochastic programming prob-lem with quantile criterion: its discrete approximation
-
Kibzun AI, Nikulin IV (2001) A linear two-stage stochastic programming prob-lem with quantile criterion: its discrete approximation. Autom Remote Control 62(8): 1339-1348.
-
(2001)
Autom Remote Control
, vol.62
, Issue.8
, pp. 1339-1348
-
-
Kibzun, A.I.1
Nikulin, I.V.2
-
20
-
-
0022661836
-
A two-stage approach for large-scale sewer systems design with application to the Lake Balaton resort area
-
Kovacs L, Boros E, Inotay F (1986) A two-stage approach for large-scale sewer systems design with application to the Lake Balaton resort area. Eur J Oper Res 23(2): 169-178.
-
(1986)
Eur J Oper Res
, vol.23
, Issue.2
, pp. 169-178
-
-
Kovacs, L.1
Boros, E.2
Inotay, F.3
-
21
-
-
41749091114
-
Interval-parameter two-stage stochastic nonlinear programming for water resources management under uncertainty
-
Li YP, Huang GH (2008) Interval-parameter two-stage stochastic nonlinear programming for water resources management under uncertainty. Water Resour Manage 22: 681-698.
-
(2008)
Water Resour Manage
, vol.22
, pp. 681-698
-
-
Li, Y.P.1
Huang, G.H.2
-
22
-
-
33644622714
-
An interval-parameter multi-stage stochastic programming model for water resources management under uncertainty
-
Li YP, Huang GH, Nie SL (2006) An interval-parameter multi-stage stochastic programming model for water resources management under uncertainty. Adv Water Resour 29: 776-789.
-
(2006)
Adv Water Resour
, vol.29
, pp. 776-789
-
-
Li, Y.P.1
Huang, G.H.2
Nie, S.L.3
-
23
-
-
62349084782
-
A multistage fuzzy-stochastic programming model for supporting sustainable water resources allocation and management
-
Li YP, Huang GH, Huang YF, Zhou HD (2009a) A multistage fuzzy-stochastic programming model for supporting sustainable water resources allocation and management. Environ Model Softw 24: 786-797.
-
(2009)
Environ Model Softw
, vol.24
, pp. 786-797
-
-
Li, Y.P.1
Huang, G.H.2
Huang, Y.F.3
Zhou, H.D.4
-
24
-
-
70349169395
-
FSWM: a hybrid fuzzy-stochastic water-management model for agricultural sustainability under uncertainty
-
Li YP, Huang GH, Wang GQ, Huang YF (2009b) FSWM: a hybrid fuzzy-stochastic water-management model for agricultural sustainability under uncertainty. Agric Water Manag 12(96): 1807-1818.
-
(2009)
Agric Water Manag
, vol.12
, Issue.96
, pp. 1807-1818
-
-
Li, Y.P.1
Huang, G.H.2
Wang, G.Q.3
Huang, Y.F.4
-
25
-
-
67649586643
-
Multistage scenario-based interval-stochastic programming for planning water resources allocation
-
Li YP, Huang GH, Chen X (2009c) Multistage scenario-based interval-stochastic programming for planning water resources allocation. Stoch Env Res Risk Assess 23(6): 781-792.
-
(2009)
Stoch Env Res Risk Assess
, vol.23
, Issue.6
, pp. 781-792
-
-
Li, Y.P.1
Huang, G.H.2
Chen, X.3
-
26
-
-
77955770156
-
An inexact two-stage water management model for planning agricultural irrigation under uncertainty
-
Li W, Li YP, Li CH, Huang GH (2010a) An inexact two-stage water management model for planning agricultural irrigation under uncertainty. Agric Water Manag 97: 1905-1914.
-
(2010)
Agric Water Manag
, vol.97
, pp. 1905-1914
-
-
Li, W.1
Li, Y.P.2
Li, C.H.3
Huang, G.H.4
-
27
-
-
76749112069
-
ISIP: capacity planning for flood management systems under uncertainty
-
Li YP, Huang GH, Zhang N, Mo DW, Nie SL (2010b) ISIP: capacity planning for flood management systems under uncertainty. Civ Eng Environ Syst 27(1): 33-52.
-
(2010)
Civ Eng Environ Syst
, vol.27
, Issue.1
, pp. 33-52
-
-
Li, Y.P.1
Huang, G.H.2
Zhang, N.3
Mo, D.W.4
Nie, S.L.5
-
28
-
-
80053470450
-
Management of uncertain information for environmental systems using a multistage fuzzy-stochastic programming model with soft constraints
-
Li YP, Huang GH, Sun W (2011) Management of uncertain information for environmental systems using a multistage fuzzy-stochastic programming model with soft constraints. J Environ Inform 18(1): 28-37.
-
(2011)
J Environ Inform
, vol.18
, Issue.1
, pp. 28-37
-
-
Li, Y.P.1
Huang, G.H.2
Sun, W.3
-
29
-
-
79955152222
-
Using HSPF to model the hydrologic and water quality impacts of riparian land-use change in a small watershed
-
Liu Z, Tong STY (2011) Using HSPF to model the hydrologic and water quality impacts of riparian land-use change in a small watershed. J Environ Inform 17(1): 1-14.
-
(2011)
J Environ Inform
, vol.17
, Issue.1
, pp. 1-14
-
-
Liu, Z.1
Tong, S.T.Y.2
-
31
-
-
78650518915
-
Planning regional water resources system using an interval fuzzy bi-level programming method
-
Lv Y, Huang GH, Li YP, Yang ZF, Liu Y, Cheng GH (2010) Planning regional water resources system using an interval fuzzy bi-level programming method. J Environ Inform 16(2): 43-56.
-
(2010)
J Environ Inform
, vol.16
, Issue.2
, pp. 43-56
-
-
Lv, Y.1
Huang, G.H.2
Li, Y.P.3
Yang, Z.F.4
Liu, Y.5
Cheng, G.H.6
-
32
-
-
0342275222
-
Optimal crop planning model for an existing groundwater irrigation project in Thailand
-
Mainuddin M, Das Gupta A, Raj Onta P (1997) Optimal crop planning model for an existing groundwater irrigation project in Thailand. Agric Water Manag 33: 43-62.
-
(1997)
Agric Water Manag
, vol.33
, pp. 43-62
-
-
Mainuddin, M.1
Das Gupta, A.2
Raj Onta, P.3
-
33
-
-
0028431424
-
Optimization analysis of deficit irrigation systems
-
Manocchi F, Mecarelli P (1994) Optimization analysis of deficit irrigation systems. J Irrigation Drainage Eng ASCE 120(3): 484-503.
-
(1994)
J Irrigation Drainage Eng ASCE
, vol.120
, Issue.3
, pp. 484-503
-
-
Manocchi, F.1
Mecarelli, P.2
-
34
-
-
13544252464
-
An interval-parameter fuzzy two-stage stochastic program for water resources management under uncertainty
-
Maqsood I, Huang GH, Yeomans JS (2005) An interval-parameter fuzzy two-stage stochastic program for water resources management under uncertainty. Eur J Oper Res 167: 208-225.
-
(2005)
Eur J Oper Res
, vol.167
, pp. 208-225
-
-
Maqsood, I.1
Huang, G.H.2
Yeomans, J.S.3
-
35
-
-
34548040461
-
A Bayesian stochastic optimization model for a multi-reservoir hydropower system
-
Mujumdar PP, Nirmala B (2007) A Bayesian stochastic optimization model for a multi-reservoir hydropower system. Water Resour Manage 21: 1465-1485.
-
(2007)
Water Resour Manage
, vol.21
, pp. 1465-1485
-
-
Mujumdar, P.P.1
Nirmala, B.2
-
36
-
-
0034746119
-
Interior-point method for reservoir operation with stochastic inflows
-
Seifi A, Hipel KW (2001) Interior-point method for reservoir operation with stochastic inflows. J Water Resour Plan Manag 127(1): 48-57.
-
(2001)
J Water Resour Plan Manag
, vol.127
, Issue.1
, pp. 48-57
-
-
Seifi, A.1
Hipel, K.W.2
-
37
-
-
0035943555
-
Optimal cropping pattern in a canal command area
-
Singh DK, Jaiswal CS, Reddy KS, Singh RM, Bhandarkar DM (2001) Optimal cropping pattern in a canal command area. Agric Water Manag 50: 1-8.
-
(2001)
Agric Water Manag
, vol.50
, pp. 1-8
-
-
Singh, D.K.1
Jaiswal, C.S.2
Reddy, K.S.3
Singh, R.M.4
Bhandarkar, D.M.5
-
38
-
-
18344405654
-
Systems analysis and irrigation planning
-
Smith DV (1973) Systems analysis and irrigation planning. J Irrigation Drainage ASCE 99: 89-107.
-
(1973)
J Irrigation Drainage ASCE
, vol.99
, pp. 89-107
-
-
Smith, D.V.1
-
39
-
-
84455171709
-
Ecosystem health assessment and regulation for urban ecosystems: a case study of the Yangtze river delta urban cluster, China
-
Su MR, Yang ZF, Liu GY, Chen B (2011) Ecosystem health assessment and regulation for urban ecosystems: a case study of the Yangtze river delta urban cluster, China. J Environ Inform 18(2): 65-74.
-
(2011)
J Environ Inform
, vol.18
, Issue.2
, pp. 65-74
-
-
Su, M.R.1
Yang, Z.F.2
Liu, G.Y.3
Chen, B.4
-
40
-
-
0021885603
-
Decision making under uncertainty: a full-infinite programming approach
-
Weber R (1985) Decision making under uncertainty: a full-infinite programming approach. Eur J Oper Res 19: 104-113.
-
(1985)
Eur J Oper Res
, vol.19
, pp. 104-113
-
-
Weber, R.1
-
41
-
-
79953042335
-
An interval full-infinite mixed-integer programming method for planning municipal energy systems: a case study of Beijing
-
Zhu Y, Huang GH, Li YP, He L, Zhang XX (2011) An interval full-infinite mixed-integer programming method for planning municipal energy systems: a case study of Beijing. Appl Energy 88(8): 2846-2862.
-
(2011)
Appl Energy
, vol.88
, Issue.8
, pp. 2846-2862
-
-
Zhu, Y.1
Huang, G.H.2
Li, Y.P.3
He, L.4
Zhang, X.X.5
-
42
-
-
80053271873
-
Planning municipal-scale energy systems under functional interval uncertainties
-
Zhu Y, Li YP, Huang GH (2012) Planning municipal-scale energy systems under functional interval uncertainties. Renew Energy 39(1): 71-84.
-
(2012)
Renew Energy
, vol.39
, Issue.1
, pp. 71-84
-
-
Zhu, Y.1
Li, Y.P.2
Huang, G.H.3
|