메뉴 건너뛰기




Volumn 8, Issue , 2012, Pages 6185-6193

How does time availability influence the execution of computerized emergency operating procedures

Author keywords

EOP; Performance; Time availability; Time pressure

Indexed keywords

CATASTROPHIC CONSEQUENCES; COMPUTER-BASED SYSTEM; CRITICAL ISSUES; EMERGENCY OPERATING PROCEDURES; EOP; ERROR RATE; HUMAN ERRORS; INDIVIDUAL PERFORMANCE; MAIN CONTROL ROOM; OPERATION TIME; PERFORMANCE; PROFICIENCY LEVEL; PUBLIC CONCERN; RELATIVE TIME; SAFE OPERATION; SUBJECTIVE WORKLOAD; SYSTEM SAFETY; TIME AVAILABILITY; TIME PRESSURES;

EID: 84873144574     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: None     Document Type: Conference Paper
Times cited : (2)

References (13)
  • 2
    • 33750166012 scopus 로고    scopus 로고
    • Time is money - Time pressure, incentives, and the quality of decision-making
    • Kocher MG, Sutter M. Time is money - Time pressure, incentives, and the quality of decision-making. Journal of Economic Behavior & Organization. 2006;61:375-92.
    • (2006) Journal of Economic Behavior & Organization , vol.61 , pp. 375-392
    • Kocher, M.G.1    Sutter, M.2
  • 4
    • 14744284944 scopus 로고    scopus 로고
    • The effects of task complexity and time availability limitations on human performance in database query tasks
    • Topi H, Valacich JS, Hoffer JA. The effects of task complexity and time availability limitations on human performance in database query tasks. International Journal of Human-Computer Studies. 2005;62(3).
    • (2005) International Journal of Human-Computer Studies , vol.62 , Issue.3
    • Topi, H.1    Valacich, J.S.2    Hoffer, J.A.3
  • 5
    • 0001878763 scopus 로고    scopus 로고
    • The study of stress and human performance
    • Driskell JE, Salas E, eds.: Lawrence Erlbaum Associates
    • Salas E, Driskell JE, Hughes S. The study of stress and human performance. In: Driskell JE, Salas E, eds. Stress and Human Performance New Jersey: Lawrence Erlbaum Associates 1996:1-45.
    • (1996) Stress and Human Performance New Jersey , pp. 1-45
    • Salas, E.1    Driskell, J.E.2    Hughes, S.3
  • 6
    • 0035041154 scopus 로고    scopus 로고
    • Time pressure and stress as a factor during emergency egress
    • Ozel F. Time pressure and stress as a factor during emergency egress. Safety Science. 2001;38(2):95- 107.
    • (2001) Safety Science , vol.38 , Issue.2 , pp. 95-107
    • Ozel, F.1
  • 7
    • 0027703536 scopus 로고
    • Strategic thinking and stress
    • Dorner D, Pfeifer F. Strategic thinking and stress. Ergonomics. 1993;36(11):1345-60.
    • (1993) Ergonomics , vol.36 , Issue.11 , pp. 1345-1360
    • Dorner, D.1    Pfeifer, F.2
  • 8
    • 0034202256 scopus 로고    scopus 로고
    • Effects of time-pressure on decision-making under uncertainty:changes in affective state and information processing strategy
    • Maule AJ, Hockey GR, Bdzola L. Effects of time-pressure on decision-making under uncertainty:changes in affective state and information processing strategy. Acta Psychologica 2000;104(3):283-301.
    • (2000) Acta Psychologica , vol.104 , Issue.3 , pp. 283-301
    • Maule, A.J.1    Hockey, G.R.2    Bdzola, L.3
  • 9
    • 0000638928 scopus 로고
    • Information input overload and psychopathology
    • Miller JG. Information input overload and psychopathology. American Journal of Psychiatry. 1960;116:695-704.
    • (1960) American Journal of Psychiatry , vol.116 , pp. 695-704
    • Miller, J.G.1
  • 10
    • 0027266411 scopus 로고
    • A simulator-based evaluation of operator behavior in a Chinese nuclear power plant under ATWS condition
    • Huang X, Zhen F. A simulator-based evaluation of operator behavior in a Chinese nuclear power plant under ATWS condition. Reliability Engineering & System Safety. 1993;40(2):195-7.
    • (1993) Reliability Engineering & System Safety , vol.40 , Issue.2 , pp. 195-197
    • Huang, X.1    Zhen, F.2
  • 11
    • 33750337517 scopus 로고    scopus 로고
    • The simulator experimental study on the operator reliability of Qinshan nuclear power plant
    • Zhang L, He X, Dai L-C, Huang X-R. The simulator experimental study on the operator reliability of Qinshan nuclear power plant. Reliability Engineering & System Safety. 2007;92(2):252-9.
    • (2007) Reliability Engineering & System Safety , vol.92 , Issue.2 , pp. 252-259
    • Zhang, L.1    He, X.2    Dai, L.-C.3    Huang, X.-R.4
  • 12
    • 43349095009 scopus 로고    scopus 로고
    • An ergonomics study of computerized emergency operating procedures: Presentation style, task complexity, and training level
    • Xu S, Song F, Li Z, Zhao Q, Luo W, He X, et al. An ergonomics study of computerized emergency operating procedures: Presentation style, task complexity, and training level. Reliability Engineering & System Safety. 2008;93(10):1500-11.
    • (2008) Reliability Engineering &Amp; System Safety , vol.93 , Issue.10 , pp. 1500-1511
    • Xu, S.1    Song, F.2    Li, Z.3    Zhao, Q.4    Luo, W.5    He, X.6
  • 13
    • 0003025123 scopus 로고
    • Development of NASA-TLX (Task Load Index): Results of empirical and theoretical research
    • Hancock PA, Meshkati N, eds. Amsterdam: North Holland Press
    • Hart SG, Staveland LE. Development of NASA-TLX (Task Load Index): results of empirical and theoretical research. In: Hancock PA, Meshkati N, eds. Human Mental Workload. Amsterdam: North Holland Press 1988.
    • (1988) Human Mental Workload
    • Hart, S.G.1    Staveland, L.E.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.