메뉴 건너뛰기




Volumn 28, Issue 1, 2013, Pages 3-9

The probability and timing of power system restoration

Author keywords

Failure; learning; planning; power; probability; recovery

Indexed keywords

ELECTRIC POWER; GENERAL THEORY; LEARNING; POWER; POWER RESTORATION; POWER SYSTEM RESTORATION; SYSTEM RELIABILITY; TECHNOLOGICAL SYSTEM;

EID: 84872863947     PISSN: 08858950     EISSN: None     Source Type: Journal    
DOI: 10.1109/TPWRS.2012.2203832     Document Type: Article
Times cited : (56)

References (27)
  • 1
    • 0141581154 scopus 로고    scopus 로고
    • 1st ed. Boston, USA: Butterworth and Heinemann (now Elsevier)
    • R. B. Duffey, J. W. Saull, and J. W., Know the Risk, 1st ed. Boston, USA: Butterworth and Heinemann (now Elsevier), 2002.
    • (2002) Know the Risk
    • Duffey, R.B.1    Saull, J.W.2
  • 2
    • 84872868526 scopus 로고    scopus 로고
    • U.S. Canada Power System Outage Task Force Final Report On The August 14, 2003, Blackout in the U.S. and Canada, U.S. DOE, Sep.
    • U.S./Canada Power System Outage Task Force, Final Report on the August 14, 2003, Blackout in the U.S. and Canada, U.S. DOE, Sep. 2006.
    • (2006)
  • 3
    • 0019600493 scopus 로고
    • System restoration plan development for a metropolitan electric system
    • Aug.
    • R. J. Kafka, D. R. Penders, S. H. Bouchey, and M. M. Adibi, "System restoration plan development for a metropolitan electric system," IEEE Trans. Power App. Syst., vol. PAS-100, no. 8, pp. 3703-3711, Aug. 1981.
    • (1981) IEEE Trans. Power App. Syst. , vol.PAS-100 , Issue.8 , pp. 3703-3711
    • Kafka, R.J.1    Penders, D.R.2    Bouchey, S.H.3    Adibi, M.M.4
  • 4
    • 0029354525 scopus 로고
    • A framework for power system restoration following a major power failure
    • Aug.
    • J. J. Ancona, "A framework for power system restoration following a major power failure," IEEE Trans. Power Syst., vol. 10, no. 3, pp. 1480-1485, Aug. 1995.
    • (1995) IEEE Trans. Power Syst. , vol.10 , Issue.3 , pp. 1480-1485
    • Ancona, J.J.1
  • 6
    • 84876767085 scopus 로고    scopus 로고
    • Power restoration practices: The Brazilian experience
    • Paris, France, Paper B5-204. [Online]. Available:
    • P. Gomes and A. P. Guarini, "Power restoration practices: The Brazilian experience," in Proc. CIGRE 2006, Paris, France, Paper B5-204. [Online]. Available: http://www.cigre.org.
    • Proc. CIGRE 2006
    • Gomes, P.1    Guarini, A.P.2
  • 7
    • 84872871740 scopus 로고    scopus 로고
    • Swiss Federal Inspectorate For Heavy Current Installations On The Blackout That Occurred In Italy & Border Regions Of Switzerland On September 28 2003, Nov.
    • Swiss Federal Inspectorate for Heavy Current Installations, On the Blackout that Occurred in Italy & Border Regions of Switzerland on September 28, 2003, Nov. 2003. [Online]. Available: http://www.esti.ch/.
    • (2003)
  • 8
    • 13444255527 scopus 로고    scopus 로고
    • Supply restoration in power distribution systems-A benchmark for planning under uncertainty
    • Sep.
    • S. Thiébaux and M.-O. Cordier, "Supply restoration in power distribution systems-A benchmark for planning under uncertainty," in Proc. 6th Eur. Conf. Planning (ECP-01), Sep. 2001, pp. 85-95.
    • (2001) Proc. 6th Eur. Conf. Planning (ECP-01) , pp. 85-95
    • Thiébaux, S.1    Cordier, M.-O.2
  • 10
    • 85008048742 scopus 로고    scopus 로고
    • Bibliography on the application of probability methods in power system reliability evaluation 1996-2001
    • Nov.
    • R. Billinton, M. Fotuhi-Firuzabad, and L. Bertiing, "Bibliography on the application of probability methods in power system reliability evaluation 1996-2001," IEEE Trans. Power Syst., vol. 16, no. 4, pp. 596-602, Nov. 2001.
    • (2001) IEEE Trans. Power Syst. , vol.16 , Issue.4 , pp. 596-602
    • Billinton, R.1    Fotuhi-Firuzabad, M.2    Bertiing, L.3
  • 11
    • 0036577520 scopus 로고    scopus 로고
    • A multi-agent approach to power system restoration
    • DOI 10.1109/TPWRS.2002.1007918, PII S0885895002010222
    • T. Nagata and H. Sasaki, "A multi-agent approach to power system restoration," IEEE Trans. Power Syst., vol. 17, no. 2, pp. 457-462, May 2002. (Pubitemid 34741711)
    • (2002) IEEE Transactions on Power Systems , vol.17 , Issue.2 , pp. 457-462
    • Nagata, T.1    Sasaki, H.2
  • 12
    • 0033222085 scopus 로고    scopus 로고
    • Estimating restoration duration
    • Nov.
    • M. M. Adibi and D. P. Milanicz, "Estimating restoration duration," IEEE Trans. Power Syst., vol. 14, no. 4, pp. 1493-1497, Nov. 1999.
    • (1999) IEEE Trans. Power Syst. , vol.14 , Issue.4 , pp. 1493-1497
    • Adibi, M.M.1    Milanicz, D.P.2
  • 13
    • 0030196474 scopus 로고    scopus 로고
    • Time of outage restoration analysis in distribution systems
    • M.-Y. Chow, L. S. Taylor, and M.-S. Chow, "Time of outage restoration analysis in distribution systems," IEEE Trans. Power Del., vol. 11, no. 3, pp. 1652-1658, Jul. 1996. (Pubitemid 126777892)
    • (1996) IEEE Transactions on Power Delivery , vol.11 , Issue.3 , pp. 1652-1658
    • Chow, M.-Y.1    Taylor, L.S.2    Chow, M.-S.3
  • 14
    • 31144478184 scopus 로고    scopus 로고
    • Supply restoration in power distribution systems-A case study in integrating modelbased diagnosis and repair planning
    • S. Thiébaux, M.-O. Cordier, O. Jehl, and J.-P. Krivine, "Supply restoration in power distribution systems-A case study in integrating modelbased diagnosis and repair planning," in Actes de UAI-96, 1996, pp. 525-532.
    • (1996) Actes de UAI-96 , pp. 525-532
    • Thiébaux, S.1    Cordier, M.-O.2    Jehl, O.3    Krivine, J.-P.4
  • 16
    • 1542577265 scopus 로고    scopus 로고
    • Learning from performance errors
    • S. Ohlsson, "Learning from performance errors," Psychol. Rev., vol. 103, no. 2, pp. 241-262, 1996.
    • (1996) Psychol. Rev. , vol.103 , Issue.2 , pp. 241-262
    • Ohlsson, S.1
  • 18
    • 0023348625 scopus 로고
    • Restoration in sweden and experience gained from the blackout of 1983
    • R. Kearsley, "Restoration in Sweden and experience gained from the blackout of 1983," IEEE Trans. Power Syst., vol. 2, no. 2, pp. 422-428, May 1987. (Pubitemid 17598075)
    • (1987) IEEE Transactions on Power Systems , vol.PWRS-2 , Issue.2 , pp. 422-428
    • Kearsley, R.1
  • 19
    • 84872841922 scopus 로고    scopus 로고
    • Consolidated Edison Company Of New York Inc. Initial Report On The Power Outages In Western Queens In July 2006, Aug. 2
    • Consolidated Edison Company of New York, Inc., Initial Report on the Power Outages in Western Queens in July 2006, Aug. 2, 2006.
    • (2006)
  • 20
    • 84872867366 scopus 로고    scopus 로고
    • New York State Assembly Report Of The Queens Power Outage Task Force Concerning The July 2006 Power Outage in Consolidated Edison's Service Territory, Jan.
    • New York State Assembly, Report of the Queens Power Outage Task Force Concerning the July 2006 Power Outage in Consolidated Edison's Service Territory, Jan. 2007.
    • (2007)
  • 21
    • 84872833192 scopus 로고    scopus 로고
    • US DOE and NRCan, US-Canada Power System Outage Task Force Final Report On The August 14, 2003 Blackout in the United States and Canada: Causes and Recommendations Figure 7.1
    • US DOE and NRCan, US-Canada Power System Outage Task Force, Final Report on the August 14, 2003 Blackout in the United States and Canada: Causes and Recommendations, 2004, Figure 7.1.
    • (2004)
  • 22
    • 84872861864 scopus 로고    scopus 로고
    • New York State Public Service Commission Department Of Public Service Staff Report On Its Investigation Of The July 2006 Equipment Failures and Power Outages in Con Edison's Long Island City Network, Queens County, New York, Case 06-E-0894, Feb.
    • New York State Public Service Commission, Department of Public Service, Staff Report on its Investigation of the July 2006 Equipment Failures and Power Outages in Con Edison's Long Island City Network, Queens County, New York, Case 06-E-0894, Feb. 2007.
    • (2007)
  • 23
    • 84872858369 scopus 로고    scopus 로고
    • Consolidated Edison Company of New York, Inc., Comments on the Report of Department of Public Service Staff on the July 2006 Power Outages in the Long Island City Network, State of New York Public Service Commission, Case 06-E-0894-Proceeding on Motion of the Commission to Investigate the Electric Power Outages in Consolidated Edison Company of New York, Inc.'s Long Island City Electric Network
    • Consolidated Edison Company of New York, Inc., Comments on the Report of Department of Public Service Staff on the July 2006 Power Outages in the Long Island City Network, State of New York Public Service Commission, Case 06-E-0894-Proceeding on Motion of the Commission to Investigate the Electric Power Outages in Consolidated Edison Company of New York, Inc.'s Long Island City Electric Network, 2007.
    • (2007)
  • 24
    • 84872843253 scopus 로고    scopus 로고
    • Investigation by the City of New York Into the Northwest Queens July 2006 Power Outages, New York, Case 06-E0894
    • Investigation by the City of New York Into the Northwest Queens July 2006 Power Outages, New York, Case 06-E0894, 2007.
    • (2007)
  • 25
    • 0029355021 scopus 로고
    • Nuclear plant requirements during power system restoration
    • Aug.
    • M. M. Adibi, G. Adamski, R. Jenkins, and P. Gill, Power System Restoration Working Group, "Nuclear plant requirements during power system restoration," IEEE Trans. Power Syst., vol. 10, no. 3, pp. 1486-1491, Aug. 1995.
    • (1995) IEEE Trans. Power Syst. , vol.10 , Issue.3 , pp. 1486-1491
    • Adibi, M.M.1    Adamski, G.2    Jenkins, R.3    Gill, P.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.