메뉴 건너뛰기




Volumn 51, Issue 2, 2013, Pages 568-581

Performance evaluation of small-batch container delivery systems used in lean manufacturing - Part 2: Number of Kanban and workstation starvation

Author keywords

Lean manufacturing; Material flow; Materials handling; Milk run systems; Small batch delivery

Indexed keywords

ANALYTIC APPROXIMATION; ANALYTICAL APPROXIMATION; CYCLE TIME; DELIVERY SYSTEMS; FACTORY FLOORS; LEAN MANUFACTURING; MANUFACTURING PLANT; MATERIAL FLOW; MATERIAL HANDLING SYSTEMS; PERFORMANCE EVALUATION; SMALL-BATCH DELIVERY; STABILITY CONDITION; STORAGE AREA;

EID: 84871239469     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207543.2012.656331     Document Type: Article
Times cited : (22)

References (4)
  • 2
    • 0000861722 scopus 로고
    • A proof of the queuing formula: L=λW
    • Little, J.D.C., 1961. A proof of the queuing formula: L=λW. Operations Research, 9 (3), 383-387.
    • (1961) Operations Research , vol.9 , Issue.3 , pp. 383-387
    • Little, J.D.C.1
  • 4
    • 0003449926 scopus 로고    scopus 로고
    • 3rd edn. Norcross, Georgia: Engineering and Management Press (a division of the Institute of Industrial Engineers)
    • Monden, Y., 1998. The Toyota production system. 3rd edn. Norcross, Georgia: Engineering and Management Press (a division of the Institute of Industrial Engineers).
    • (1998) The Toyota Production System
    • Monden, Y.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.