메뉴 건너뛰기




Volumn 594-597, Issue , 2012, Pages 1078-1081

The monitoring technology research about the tunnel blasting vibration under the complex construction

Author keywords

Blasting vibration; Control technology; Excavation and construction

Indexed keywords

BLASTING EXCAVATION; BLASTING SEISMIC WAVE; BLASTING VIBRATIONS; COMPLEX CONSTRUCTION; CONTROL TECHNOLOGIES; ENGINEERING PRACTICES; MATHEMATICAL FORMULAS; MONITORING METHODS; MONITORING TECHNOLOGIES;

EID: 84871069048     PISSN: 10226680     EISSN: None     Source Type: Book Series    
DOI: 10.4028/www.scientific.net/AMR.594-597.1078     Document Type: Conference Paper
Times cited : (1)

References (3)
  • 2
    • 78650005237 scopus 로고    scopus 로고
    • Beijing: Metallurgical Industry Press
    • Chunlin Weng, Engineering Blasting, Beijing: Metallurgical Industry Press,2004
    • (2004) Engineering Blasting
    • Weng, C.1
  • 3
    • 77955037666 scopus 로고    scopus 로고
    • Feng Zheng, Blasting, 1, 92-94, 2006
    • (2006) Blasting , vol.1 , pp. 92-94
    • Zheng, F.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.