-
1
-
-
40449108305
-
Evaluating benefits of a systemwide adaptive ramp-metering strategy in Portland, Oregon
-
Ahn, S., Bertini, R. L., Auffray, B., Ross, J. H. & Eshel, O. (2007), Evaluating benefits of a systemwide adaptive ramp-metering strategy in Portland, Oregon, Transportation Research Record: Journal of the Transportation Research Board, 2012, 47-56.
-
(2007)
Transportation Research Record: Journal of the Transportation Research Board
, vol.2012
, pp. 47-56
-
-
Ahn, S.1
Bertini, R.L.2
Auffray, B.3
Ross, J.H.4
Eshel, O.5
-
2
-
-
84949232731
-
Model predictive control with repeated model fitting for ramp metering
-
in, Singapore
-
Bellemans, T., De Schutter, B. & De Moor, B. (2002), Model predictive control with repeated model fitting for ramp metering, in Proceedings of the Fifth IEEE Intelligent Transportation Systems Conference, Singapore
-
(2002)
Proceedings of the Fifth IEEE Intelligent Transportation Systems Conference
-
-
Bellemans, T.1
De Schutter, B.2
De Moor, B.3
-
3
-
-
84958747773
-
Advanced Coordinated Traffic Responsive Ramp Metering Strategies, California PATH Working paper
-
Bogenberger, K. & May, A. D. (1999), Advanced Coordinated Traffic Responsive Ramp Metering Strategies, California PATH Working paper, UCB-ITS-PWP-99-19.
-
(1999)
UCB-ITS-PWP-99-19
-
-
Bogenberger, K.1
May, A.D.2
-
4
-
-
84870886528
-
Incident Management
-
Cambridge Systematics Inc., ATA Foundation Inc., Alexandria, VA
-
Cambridge Systematics Inc. (1990), Incident Management, Final Report prepared for Trucking Research Institute, ATA Foundation Inc., Alexandria, VA
-
(1990)
Final Report prepared for Trucking Research Institute
-
-
-
5
-
-
20444470360
-
Increasing the capacity of an isolated merge by metering its on-ramp
-
Cassidy, M. J. & Rudjanakanoknad, J. (2005), Increasing the capacity of an isolated merge by metering its on-ramp, Transportation Research Part B, 39, 896-913.
-
(2005)
Transportation Research Part B
, vol.39
, pp. 896-913
-
-
Cassidy, M.J.1
Rudjanakanoknad, J.2
-
6
-
-
84870927706
-
-
Design Criteria for Ramp Metering: Appendix to TxDOT Roadway Design Manual, Texas Department of Transportation (TxDOT) Report No. 0-2121-3.
-
Chaudhary, N. & Messer, C. (2000), Design Criteria for Ramp Metering: Appendix to TxDOT Roadway Design Manual, Texas Department of Transportation (TxDOT) Report No. 0-2121-3.
-
(2000)
-
-
Chaudhary, N.1
Messer, C.2
-
7
-
-
0002095942
-
Development and evaluation of a dynamic traffic control model for real-time freeway operations
-
Symposium on Transportation Systems, Chania, Greece
-
Chen, O., Hotz, A. & Ben-Akiva, M. (1997), Development and evaluation of a dynamic traffic control model for real-time freeway operations, in Proceedings of the 8th International Federation of Automatic Control (IFAC) Symposium on Transportation Systems, Chania, Greece, 1162-68.
-
(1997)
Proceedings of the 8th International Federation of Automatic Control (IFAC)
, pp. 1162-1168
-
-
Chen, O.1
Hotz, A.2
Ben-Akiva, M.3
-
9
-
-
33646002635
-
Single-station algorithm using video-based data for detecting expressway incidents
-
Chin, L. M. & Fan, H. S. L. (2006), Single-station algorithm using video-based data for detecting expressway incidents, Computer-Aided Civil and Infrastructure Engineering, 21(2), 120-35.
-
(2006)
Computer-Aided Civil and Infrastructure Engineering
, vol.21
, Issue.2
, pp. 120-135
-
-
Chin, L.M.1
Fan, H.S.L.2
-
10
-
-
84895234488
-
-
Springer, Berlin, Heidelberg
-
Conejo, A., Castillo, E., Mínguez, R. & García-Bertrand, R. (2006), Decomposition Techniques in Mathematical Programming: Engineering and Science Applications, Springer, Berlin, Heidelberg
-
(2006)
Decomposition Techniques in Mathematical Programming: Engineering and Science Applications
-
-
Conejo, A.1
Castillo, E.2
Mínguez, R.3
García-Bertrand, R.4
-
11
-
-
84870922277
-
-
Design and Simulation Test of Coordinated Ramp Metering Control (METALINE) for A10-West in Amsterdam, Internal Report 1994-2, Dynamic Systems and Simulation Laboratory, Technical University of Crete, Chania, Greece
-
Diakaki, C. & Papageorgiou, M. (1994), Design and Simulation Test of Coordinated Ramp Metering Control (METALINE) for A10-West in Amsterdam, Internal Report 1994-2, Dynamic Systems and Simulation Laboratory, Technical University of Crete, Chania, Greece
-
(1994)
-
-
Diakaki, C.1
Papageorgiou, M.2
-
12
-
-
33846048528
-
Improving Minnesota's stratified ramp control strategy
-
Feng, B., Hourdos, J. & Michalopoulos, P. (2006), Improving Minnesota's stratified ramp control strategy, Transportation. Research Record: Journal of the Transportation Research Board, 1959, 77-83.
-
(2006)
Transportation. Research Record: Journal of the Transportation Research Board
, vol.1959
, pp. 77-83
-
-
Feng, B.1
Hourdos, J.2
Michalopoulos, P.3
-
13
-
-
82455210228
-
A dynamic-zone-based coordinated ramp-metering algorithm with queue constraints for Minnesota's freeways
-
Geroliminis, N., Srivastava, A. & Michalopoulos, P. (2011), A dynamic-zone-based coordinated ramp-metering algorithm with queue constraints for Minnesota's freeways, IEEE Transactions on ITS, 12(4), 1576-86.
-
(2011)
IEEE Transactions on ITS
, vol.12
, Issue.4
, pp. 1576-1586
-
-
Geroliminis, N.1
Srivastava, A.2
Michalopoulos, P.3
-
14
-
-
15544390085
-
A microsimulation model of a congested freeway using VISSIM
-
Gomes, G., Adolf, M. & Horowitz, R. (2004), A microsimulation model of a congested freeway using VISSIM, Transportation Research Record, 1876, 71-81.
-
(2004)
Transportation Research Record
, vol.1876
, pp. 71-81
-
-
Gomes, G.1
Adolf, M.2
Horowitz, R.3
-
15
-
-
33749319394
-
Optimal freeway ramp metering using the asymmetric cell transmission model
-
Gomes, G. & Horowitz, R. (2006), Optimal freeway ramp metering using the asymmetric cell transmission model, Transportation Research Part C, 14, 244-62.
-
(2006)
Transportation Research Part C
, vol.14
, pp. 244-262
-
-
Gomes, G.1
Horowitz, R.2
-
16
-
-
0004020261
-
-
8th edn., McGraw-Hill Companies, Inc., New York
-
Hillier, F. S. & Lieberman, G. J. (2005), Introduction to Operations Research, 8th edn., McGraw-Hill Companies, Inc., New York
-
(2005)
Introduction to Operations Research
-
-
Hillier, F.S.1
Lieberman, G.J.2
-
17
-
-
0009476894
-
Real-time metering algorithm for centralized control
-
Jackobson, L., Henry, K. & Mehyar, O. (1988), Real-time metering algorithm for centralized control, Transportation Research Record, 1232, 17-26.
-
(1988)
Transportation Research Record
, vol.1232
, pp. 17-26
-
-
Jackobson, L.1
Henry, K.2
Mehyar, O.3
-
18
-
-
0346004484
-
-
Report of the Centrico Project, European Commission (DG TREN), Brussels, Belgium
-
Kenis, E. & Tebebos, R. (2001), Ramp Metering Synthesis, Report of the Centrico Project, European Commission (DG TREN), Brussels, Belgium
-
(2001)
Ramp Metering Synthesis
-
-
Kenis, E.1
Tebebos, R.2
-
19
-
-
0036462730
-
Coordinated and integrated control of motorway networks via nonlinear optimal control
-
Kotsialos, A., Papageorgiou, M., Mangeas, M. & Haj-Salem, H. (2002), Coordinated and integrated control of motorway networks via nonlinear optimal control, Transportation Research Part C, 10, 65-84.
-
(2002)
Transportation Research Part C
, vol.10
, pp. 65-84
-
-
Kotsialos, A.1
Papageorgiou, M.2
Mangeas, M.3
Haj-Salem, H.4
-
20
-
-
70350268086
-
Optimal sensor locations for freeway bottleneck identification
-
Liu, H. X. & Danczyk, A. (2009), Optimal sensor locations for freeway bottleneck identification, Computer-Aided Civil & Infrastructure Engineering, 24(8), 535-50.
-
(2009)
Computer-Aided Civil & Infrastructure Engineering
, vol.24
, Issue.8
, pp. 535-550
-
-
Liu, H.X.1
Danczyk, A.2
-
21
-
-
40449107063
-
Improving queue size estimation for Minnesota's stratified zone metering strategy
-
Liu, H. X., Wu, X. & Michalopoulos, P. G. (2007), Improving queue size estimation for Minnesota's stratified zone metering strategy, Transportation Research Record: Journal of the Transportation Research Board, 2012, 38-46.
-
(2007)
Transportation Research Record: Journal of the Transportation Research Board
, vol.2012
, pp. 38-46
-
-
Liu, H.X.1
Wu, X.2
Michalopoulos, P.G.3
-
22
-
-
0035563673
-
Defining highway capacity as a function of the breakdown probability
-
Lorenz, M. & Elefteriadou, L. (2001), Defining highway capacity as a function of the breakdown probability, Transportation Research Record, 1776, 43-51.
-
(2001)
Transportation Research Record
, vol.1776
, pp. 43-51
-
-
Lorenz, M.1
Elefteriadou, L.2
-
23
-
-
0034064475
-
Access control on networks with unique origin-destination paths
-
Lovell, D. & Daganzo, C. F. (2000), Access control on networks with unique origin-destination paths, Transportation Research B, 34(3), 185-202.
-
(2000)
Transportation Research B
, vol.34
, Issue.3
, pp. 185-202
-
-
Lovell, D.1
Daganzo, C.F.2
-
24
-
-
0347788244
-
-
National Cooperative Highway Research Program (NCHRP)
-
Masher, D. P., Ross, D., Wong, W. P., Tuan, J. P., Zeidler, H. M. & Petracek, S. (1975), Guidelines for Design and Operation of Ramp Control Systems, National Cooperative Highway Research Program (NCHRP), 3-22.
-
(1975)
Guidelines for Design and Operation of Ramp Control Systems
, pp. 3-22
-
-
Masher, D.P.1
Ross, D.2
Wong, W.P.3
Tuan, J.P.4
Zeidler, H.M.5
Petracek, S.6
-
25
-
-
0025570774
-
Modeling and real-time control of traffic flow on the southern part of Boulevard Périphérique in Paris-part II: coordinated on-ramp metering
-
Papageorgiou, M., Blosseville, J. & Hadj-Salem, H. (1990), Modeling and real-time control of traffic flow on the southern part of Boulevard Périphérique in Paris-part II: coordinated on-ramp metering, Transportation Research Part A, 24, 361-70.
-
(1990)
Transportation Research Part A
, vol.24
, pp. 361-370
-
-
Papageorgiou, M.1
Blosseville, J.2
Hadj-Salem, H.3
-
26
-
-
10644296117
-
Review of road traffic control strategies
-
Papageorgiou, M., Diakaki, C., Dinopoulou, V., Kotsialos, A. & Wang, Y. (2003), Review of road traffic control strategies, Proceedings of the IEEE, 91(12), 2043-67.
-
(2003)
Proceedings of the IEEE
, vol.91
, Issue.12
, pp. 2043-2067
-
-
Papageorgiou, M.1
Diakaki, C.2
Dinopoulou, V.3
Kotsialos, A.4
Wang, Y.5
-
27
-
-
0002056477
-
ALINEA: a local feedback control law for on-ramp metering
-
Papageorgiou, M., Hadj-Salem, H. & Middleham, F. (1991), ALINEA: a local feedback control law for on-ramp metering, Transportation Research Record, 1320, 58-64.
-
(1991)
Transportation Research Record
, vol.1320
, pp. 58-64
-
-
Papageorgiou, M.1
Hadj-Salem, H.2
Middleham, F.3
-
28
-
-
3643094227
-
ALINEA local ramp metering: summary of field results
-
Papageorgiou, M., Haj-Salem, H. & Middelham, F. (1998), ALINEA local ramp metering: summary of field results. Transportation Research Record, 1603, 90-98.
-
(1998)
Transportation Research Record
, vol.1603
, pp. 90-98
-
-
Papageorgiou, M.1
Haj-Salem, H.2
Middelham, F.3
-
29
-
-
0346741362
-
Freeway ramp metering: an overview
-
Papageorgiou, M. & Kotsialos, A. (2002), Freeway ramp metering: an overview, IEEE Transactions on Intelligent Transportation Systems, 3(4), 271-81.
-
(2002)
IEEE Transactions on Intelligent Transportation Systems
, vol.3
, Issue.4
, pp. 271-281
-
-
Papageorgiou, M.1
Kotsialos, A.2
-
30
-
-
77952290601
-
Coordinated ramp metering for freeway networks-a model-predictive hierarchical control approach
-
Papamichail, I., Kotsialos, A., Margonis, I. & Papageorgiou, M. (2008), Coordinated ramp metering for freeway networks-a model-predictive hierarchical control approach, Transportation Research Part C, 18(3), 311-31.
-
(2008)
Transportation Research Part C
, vol.18
, Issue.3
, pp. 311-31
-
-
Papamichail, I.1
Kotsialos, A.2
Margonis, I.3
Papageorgiou, M.4
-
31
-
-
79958101839
-
Balancing of queues or waiting times on metered dual-branch on-ramps
-
Papamichail, I. & Papageorgiou, M. (2011), Balancing of queues or waiting times on metered dual-branch on-ramps, IEEE Transactions on ITS, 12(2), 438-52.
-
(2011)
IEEE Transactions on ITS
, vol.12
, Issue.2
, pp. 438-452
-
-
Papamichail, I.1
Papageorgiou, M.2
-
32
-
-
84870876777
-
An area-wide system for coordinated ramp meter control
-
CD-ROM. Transportation Research Board, National Research Council, Washington DC
-
Perrine, K., Lao, Y. & Wang, Y. (2009), An area-wide system for coordinated ramp meter control, in The 88th Annual Meeting of the Transportation Research Board, CD-ROM. Transportation Research Board, National Research Council, Washington DC
-
(2009)
The 88th Annual Meeting of the Transportation Research Board
-
-
Perrine, K.1
Lao, Y.2
Wang, Y.3
-
33
-
-
0037696402
-
Case-based reasoning for assessing intelligent transportation systems benefits
-
Sadek, A., Morse, S., Ivan, J. & El-Dessouki, W. (2003), Case-based reasoning for assessing intelligent transportation systems benefits, Computer-Aided Civil and Infrastructure Engineering, 18(3), 173-83.
-
(2003)
Computer-Aided Civil and Infrastructure Engineering
, vol.18
, Issue.3
, pp. 173-183
-
-
Sadek, A.1
Morse, S.2
Ivan, J.3
El-Dessouki, W.4
-
34
-
-
15844414317
-
-
Final Report: UT-02.19, Utah Department of Transportation.
-
Saito, M., Wright, M., Hernandez, S., Yedlin, M. & Neyssen, J. (2003), Evaluation of the Effectiveness of Coordinated Ramp Meter Controls, Final Report: UT-02.19, Utah Department of Transportation.
-
(2003)
Evaluation of the Effectiveness of Coordinated Ramp Meter Controls
-
-
Saito, M.1
Wright, M.2
Hernandez, S.3
Yedlin, M.4
Neyssen, J.5
-
35
-
-
3242713462
-
Freeway ramp merging phenomena in congested traffic using simulation combined with a driving simulator
-
Sarvi, M., Kuwahara, M. & Ceder, A. (2004), Freeway ramp merging phenomena in congested traffic using simulation combined with a driving simulator, Computer-Aided Civil and Infrastructure Engineering, 19(5), 351-63.
-
(2004)
Computer-Aided Civil and Infrastructure Engineering
, vol.19
, Issue.5
, pp. 351-363
-
-
Sarvi, M.1
Kuwahara, M.2
Ceder, A.3
-
36
-
-
84870953316
-
-
Fuzzy on-ramp control model on urban expressway and its extension, Proceedings of the Tenth International Symposium on Transportation and Traffic Theory
-
Sasaki, T. & Akiyama, T. (1987), Fuzzy on-ramp control model on urban expressway and its extension, Proceedings of the Tenth International Symposium on Transportation and Traffic Theory, 377-95.
-
(1987)
, pp. 377-395
-
-
Sasaki, T.1
Akiyama, T.2
-
38
-
-
0346119991
-
A flow-maximizing adaptive local ramp metering strategy
-
Smaragdis, E., Papageorgiou, M. & Kosmatopoulos, E. (2004), A flow-maximizing adaptive local ramp metering strategy, Transportation Research Part B, 38, 251-70.
-
(2004)
Transportation Research Part B
, vol.38
, pp. 251-270
-
-
Smaragdis, E.1
Papageorgiou, M.2
Kosmatopoulos, E.3
-
39
-
-
84870871124
-
-
Algorithm Design, User Interface, and Optimization Procedure for a Fuzzy Logic Ramp Metering Algorithm: A Training Manual for Freeway Operations Engineers, Washington State Department of Transportation, Report WA-RD 481.1.
-
Taylor, C. & Meldrum, D. (2000), Algorithm Design, User Interface, and Optimization Procedure for a Fuzzy Logic Ramp Metering Algorithm: A Training Manual for Freeway Operations Engineers, Washington State Department of Transportation, Report WA-RD 481.1.
-
(2000)
-
-
Taylor, C.1
Meldrum, D.2
-
40
-
-
0032208285
-
Fuzzy ramp metering: design overview and simulation results
-
Taylor, C., Meldrum, D. & Jacobson, L. (1998), Fuzzy ramp metering: design overview and simulation results, Transportation Research Record, 1634, 10-18.
-
(1998)
Transportation Research Record
, vol.1634
, pp. 10-18
-
-
Taylor, C.1
Meldrum, D.2
Jacobson, L.3
-
41
-
-
0003693579
-
-
Transportation Research Board., National Research Council, Washington DC
-
Transportation Research Board. (2000), Highway Capacity Manual, National Research Council, Washington DC
-
(2000)
Highway Capacity Manual
-
-
-
42
-
-
84870938284
-
-
Field evaluation of the fuzzy logic based ramp metering algorithm, in 11th IFAC Symposium on Control in Transportation Systems, Delft, The Netherlands
-
Vukanovic, S. & Ernhofer, O. (2006), Field evaluation of the fuzzy logic based ramp metering algorithm, in 11th IFAC Symposium on Control in Transportation Systems, Delft, The Netherlands
-
(2006)
-
-
Vukanovic, S.1
Ernhofer, O.2
-
43
-
-
0034433487
-
Freeway traffic speed estimation using single loop outputs
-
TRB, National Research Council, Washington DC
-
Wang, Y. & Nihan, N. L. (2000), Freeway traffic speed estimation using single loop outputs, Transportation Research Record, 1727, TRB, National Research Council, Washington DC, 120-26.
-
(2000)
Transportation Research Record
, vol.1727
, pp. 120-126
-
-
Wang, Y.1
Nihan, N.L.2
-
44
-
-
84870922877
-
-
Developing an Area-Wide System for Coordinated Ramp Meter Control, TransNow Technical Report. Available at: accessed June 1, 2009.
-
Wang, Y., Perrine, K. & Lao, Y. (2009), Developing an Area-Wide System for Coordinated Ramp Meter Control, TransNow Technical Report. Available at: http://www.transnow.org/publication/final-reports/documents, accessed June 1, 2009.
-
(2009)
-
-
Wang, Y.1
Perrine, K.2
Lao, Y.3
-
45
-
-
0001858070
-
Peak-period analysis and control of a freeway system
-
Wattleworth, A. (1965), Peak-period analysis and control of a freeway system. Highway Research Record, 157, 1-21.
-
(1965)
Highway Research Record
, vol.157
, pp. 1-21
-
-
Wattleworth, A.1
-
46
-
-
0041039444
-
-
Series of the Institute for Transportation at the University of Karlsruhe, Issue 8.
-
Wiedemann, R. (1974), Simulation of traffic flow. Series of the Institute for Transportation at the University of Karlsruhe, Issue 8.
-
(1974)
Simulation of traffic flow
-
-
Wiedemann, R.1
-
47
-
-
11244292265
-
-
The Commission of the European Community, DG XIII (ed.), Advanced Telematics in Road Transport, Brussels.
-
Wiedemann, R. (1991), Modeling of RTI-elements on multi-lane roads, in The Commission of the European Community, DG XIII (ed.), Advanced Telematics in Road Transport, Brussels.
-
(1991)
Modeling of RTI-elements on multi-lane roads
-
-
Wiedemann, R.1
-
49
-
-
84870942376
-
-
WSDOT (Washington State Department of Transportation), WSDOT Website. Available at: accessed April 10, 2008.
-
WSDOT (Washington State Department of Transportation) (2008), SR 520 Ramp Metering at Montlake and Lake Washington Boulevards. WSDOT Website. Available at: http://www.wsdot.wa.gov/Projects/SR520RampMeters/, accessed April 10, 2008.
-
(2008)
SR 520 Ramp Metering at Montlake and Lake Washington Boulevards
-
-
-
50
-
-
33646052283
-
Enhanced roadway inventory using a 2-D sign video image recognition algorithm
-
Wu, J. & Tsai, Y (2006), Enhanced roadway inventory using a 2-D sign video image recognition algorithm. Computer-Aided Civil and Infrastructure Engineering, 21(5), 369-82.
-
(2006)
Computer-Aided Civil and Infrastructure Engineering
, vol.21
, Issue.5
, pp. 369-382
-
-
Wu, J.1
Y, T.2
-
51
-
-
34249030515
-
Short-term traffic volume forecasting using Kalman filter with discrete wavelet decomposition
-
Xie, Y., Yunlong, Z. & Zhirui, Y. (2007), Short-term traffic volume forecasting using Kalman filter with discrete wavelet decomposition, Computer-Aided Civil and Infrastructure Engineering, 22(5), 326-34.
-
(2007)
Computer-Aided Civil and Infrastructure Engineering
, vol.22
, Issue.5
, pp. 326-334
-
-
Xie, Y.1
Yunlong, Z.2
Zhirui, Y.3
-
52
-
-
10944268756
-
Minnesota's new ramp control strategy: design overview and preliminary assessment
-
Xin, W., Michalopoulos, P. G., Hourdakis, J. & Lau, D. (2004), Minnesota's new ramp control strategy: design overview and preliminary assessment, Transportation Research Record: Journal of the Transportation Research Board, 1867, 69-79.
-
(2004)
Transportation Research Record: Journal of the Transportation Research Board
, vol.1867
, pp. 69-79
-
-
Xin, W.1
Michalopoulos, P.G.2
Hourdakis, J.3
Lau, D.4
-
53
-
-
70349540735
-
Simulation-based investigation on high occupancy toll (HOT) lane operations for Washington State Route 167
-
Zhang, G., Yan, S. & Wang, Y. (2009), Simulation-based investigation on high occupancy toll (HOT) lane operations for Washington State Route 167, ASCE Journal of Transportation Engineering, 135(10), 677-86.
-
(2009)
ASCE Journal of Transportation Engineering
, vol.135
, Issue.10
, pp. 677-686
-
-
Zhang, G.1
Yan, S.2
Wang, Y.3
-
54
-
-
0030124931
-
Some general results on the optimal ramp metering control problem
-
Zhang, H., Ritchie, G. & Recker, W. (1996), Some general results on the optimal ramp metering control problem, Transportation Research Part C, 4, 51-69.
-
(1996)
Transportation Research Part C
, vol.4
, pp. 51-69
-
-
Zhang, H.1
Ritchie, G.2
Recker, W.3
-
55
-
-
3542993831
-
Optimal freeway ramp control without origin-destination information
-
Zhang, L. & Levinson, D. (2004), Optimal freeway ramp control without origin-destination information, Transportation Research Part B, 38, 869-77.
-
(2004)
Transportation Research Part B
, vol.38
, pp. 869-877
-
-
Zhang, L.1
Levinson, D.2
-
56
-
-
20444439091
-
Balancing efficiency and equity of ramp meters
-
Zhang, L. & Levinson, D. M. (2005), Balancing efficiency and equity of ramp meters, ASCE Journal of Transportation Engineering, 131(6), 477-81.
-
(2005)
ASCE Journal of Transportation Engineering
, vol.131
, Issue.6
, pp. 477-481
-
-
Zhang, L.1
Levinson, D.M.2
-
57
-
-
0032634634
-
On optimal freeway ramp control policies for congested traffic corridors
-
Zhang, M. & Recker, W. (1999), On optimal freeway ramp control policies for congested traffic corridors, Transportation Research Part B, 33, 417-36.
-
(1999)
Transportation Research Part B
, vol.33
, pp. 417-436
-
-
Zhang, M.1
Recker, W.2
-
58
-
-
0031250213
-
Freeway ramp metering using artificial neural networks
-
Zhang, M. & Ritchie, G. (1997), Freeway ramp metering using artificial neural networks, Transportation Research Part C, 5, 273-86.
-
(1997)
Transportation Research Part C
, vol.5
, pp. 273-286
-
-
Zhang, M.1
Ritchie, G.2
-
59
-
-
33646726522
-
Detecting cycle failures at signalized intersections using video image processing
-
Zheng, J., Yinhai, W., Nihan, N. L. & Hallenbeck, M. E. (2006), Detecting cycle failures at signalized intersections using video image processing, Computer-Aided Civil and Infrastructure Engineering, 21(6), 425-35.
-
(2006)
Computer-Aided Civil and Infrastructure Engineering
, vol.21
, Issue.6
, pp. 425-435
-
-
Zheng, J.1
Yinhai, W.2
Nihan, N.L.3
Hallenbeck, M.E.4
|