메뉴 건너뛰기




Volumn 40, Issue 3, 2013, Pages 886-900

Tabu search and lower bounds for a combined production-transportation problem

Author keywords

Batching; Lower bounds; Scheduling; Tabu search; Transportation

Indexed keywords

BATCHING; COMPUTATIONAL EXPERIMENT; CONSTANT TIME; DUE DATES; FEASIBLE SCHEDULE; LIMITED CAPACITY; LOWER BOUNDS; MAXIMUM LATENESS; MIXED INTEGER LINEAR PROGRAM; POLYNOMIAL-TIME; PRODUCTION SITES; PRODUCTION STAGE; PRODUCTION TRANSPORTATION; RELEASE DATE; TABU SEARCH ALGORITHMS;

EID: 84870249361     PISSN: 03050548     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.cor.2012.08.017     Document Type: Article
Times cited : (30)

References (29)
  • 1
    • 0001507294 scopus 로고
    • Batching and scheduling jobs on batch and discrete processors
    • J.H. Ahmadi, R.H. Ahmadi, S. Dasu, and C.S. Tang Batching and scheduling jobs on batch and discrete processors Operations Research 40 4 1992 750 763
    • (1992) Operations Research , vol.40 , Issue.4 , pp. 750-763
    • Ahmadi, J.H.1    Ahmadi, R.H.2    Dasu, S.3    Tang, C.S.4
  • 3
    • 0000165767 scopus 로고
    • An algorithm for solving the job-shop problem
    • J. Carlier, and E. Pinson An algorithm for solving the job-shop problem Management Science 35 2 1989 164 176
    • (1989) Management Science , vol.35 , Issue.2 , pp. 164-176
    • Carlier, J.1    Pinson, E.2
  • 5
    • 22544468772 scopus 로고    scopus 로고
    • Integrated production and distribution operations Taxonomy, models, and review
    • D. Semchi-Levi, S.D. Wu, Z.-J. Shen, Kluwer
    • Z.-L. Chen Integrated production and distribution operations Taxonomy, models, and review D. Semchi-Levi, S.D. Wu, Z.-J. Shen, Handbook of quantitative supply chain analysis modelling in the e-Business era 2004 Kluwer 711 747
    • (2004) Handbook of Quantitative Supply Chain Analysis Modelling in the E-Business Era , pp. 711-747
    • Chen, Z.-L.1
  • 6
    • 77249147436 scopus 로고    scopus 로고
    • Integrated production and outbound distribution scheduling review and extensions
    • Z.-L. Chen Integrated production and outbound distribution scheduling review and extensions Operations Research 58 2010 130 148
    • (2010) Operations Research , vol.58 , pp. 130-148
    • Chen, Z.-L.1
  • 7
    • 78650179836 scopus 로고    scopus 로고
    • Parallel batch scheduling of equal-length jobs with release and due dates
    • A. Condotta, S. Knust, and N.V. Shakhlevich Parallel batch scheduling of equal-length jobs with release and due dates Journal of Scheduling 13 2010 463 477
    • (2010) Journal of Scheduling , vol.13 , pp. 463-477
    • Condotta, A.1    Knust, S.2    Shakhlevich, N.V.3
  • 9
    • 61349164254 scopus 로고    scopus 로고
    • The integrated production and transportation scheduling problem for a product with a short lifespan
    • H.N. Geismar, G. Laporte, L. Lei, and C. Sriskandarajah The integrated production and transportation scheduling problem for a product with a short lifespan INFORMS Journal on Computing 20 2008 21 33
    • (2008) INFORMS Journal on Computing , vol.20 , pp. 21-33
    • Geismar, H.N.1    Laporte, G.2    Lei, L.3    Sriskandarajah, C.4
  • 10
    • 0026190509 scopus 로고
    • Schedules for a two-stage hybrid flowshop with parallel machines at the second stage
    • J.N.D. Gupta, and E.A. Tunc Schedules for a two-stage hybrid flowshop with parallel machines at the second stage International Journal of Production Research 29 1991 1489 1502
    • (1991) International Journal of Production Research , vol.29 , pp. 1489-1502
    • Gupta, J.N.D.1    Tunc, E.A.2
  • 12
    • 2342539189 scopus 로고    scopus 로고
    • Supply chain scheduling: Batching and delivery
    • N.G. Hall, and C.N. Potts Supply chain scheduling: batching and delivery Operations Research 51 2003 566 584
    • (2003) Operations Research , vol.51 , pp. 566-584
    • Hall, N.G.1    Potts, C.N.2
  • 13
    • 24144473403 scopus 로고    scopus 로고
    • The coordination of scheduling with batch deliveries
    • N.G. Hall, and C.N. Potts The coordination of scheduling with batch deliveries Annals of Operations Research 135 2005 41 64
    • (2005) Annals of Operations Research , vol.135 , pp. 41-64
    • Hall, N.G.1    Potts, C.N.2
  • 15
    • 38149058172 scopus 로고
    • Efficient scheduling algorithms for a single batch processing machine
    • Y. Ikura, and M. Gimple Efficient scheduling algorithms for a single batch processing machine Operations Research Letters 5 1986 61 65
    • (1986) Operations Research Letters , vol.5 , pp. 61-65
    • Ikura, Y.1    Gimple, M.2
  • 16
    • 0344427189 scopus 로고    scopus 로고
    • Machine scheduling with transportation considerations
    • C.-Y. Lee, and Z.-L. Chen Machine scheduling with transportation considerations Journal of Scheduling 4 2001 3 24
    • (2001) Journal of Scheduling , vol.4 , pp. 3-24
    • Lee, C.-Y.1    Chen, Z.-L.2
  • 17
    • 80053211943 scopus 로고    scopus 로고
    • An effective neighborhood search algorithm for scheduling a flow shop of batch processing machines
    • D. Lei, and T. Wang An effective neighborhood search algorithm for scheduling a flow shop of batch processing machines Computers and Industrial Engineering 61 2011 739 743
    • (2011) Computers and Industrial Engineering , vol.61 , pp. 739-743
    • Lei, D.1    Wang, T.2
  • 18
    • 78649458370 scopus 로고    scopus 로고
    • Variable neighborhood search for minimizing tardiness objectives on flow shop with batch processing machines
    • D.M. Lei, and X.P. Guo Variable neighborhood search for minimizing tardiness objectives on flow shop with batch processing machines Journal of Production Research 49 2011 519 529
    • (2011) Journal of Production Research , vol.49 , pp. 519-529
    • Lei, D.M.1    Guo, X.P.2
  • 20
    • 79751538046 scopus 로고    scopus 로고
    • Tabu search heuristic for two-machine flow shop with batch-processing machines
    • L.M. Liao, and C.J. Huang Tabu search heuristic for two-machine flow shop with batch-processing machines Computers and Industrial Engineering 60 2011 426 432
    • (2011) Computers and Industrial Engineering , vol.60 , pp. 426-432
    • Liao, L.M.1    Huang, C.J.2
  • 21
    • 78650593732 scopus 로고    scopus 로고
    • An improved approximation algorithm for single machine scheduling with job delivery
    • P. Liu, and X. Lu An improved approximation algorithm for single machine scheduling with job delivery Theoretical Computer Science 412 2011 270 274
    • (2011) Theoretical Computer Science , vol.412 , pp. 270-274
    • Liu, P.1    Lu, X.2
  • 22
    • 39649115214 scopus 로고    scopus 로고
    • Single machine scheduling with release dates and job delivery to minimize the makespan
    • L. Lu, J. Yuan, and L. Zhang Single machine scheduling with release dates and job delivery to minimize the makespan Theoretical Computer Science 393 2008 102 108
    • (2008) Theoretical Computer Science , vol.393 , pp. 102-108
    • Lu, L.1    Yuan, J.2    Zhang, L.3
  • 23
    • 61349174124 scopus 로고    scopus 로고
    • Minimizing makespan in a flow shop with two batch-processing machines using simulated annealing
    • P.K. Manjeshwar, P. Damodaran, and K. Srihari Minimizing makespan in a flow shop with two batch-processing machines using simulated annealing Robotics and Computer-Aided Manufacturing 25 2009 667 679
    • (2009) Robotics and Computer-Aided Manufacturing , vol.25 , pp. 667-679
    • Manjeshwar, P.K.1    Damodaran, P.2    Srihari, K.3
  • 25
    • 0001662666 scopus 로고
    • Analysis of a heuristic for one machine sequencing with release dates and delivery times
    • C.N. Potts Analysis of a heuristic for one machine sequencing with release dates and delivery times Operations Research 28 1980 690 710
    • (1980) Operations Research , vol.28 , pp. 690-710
    • Potts, C.N.1
  • 26
    • 84974861854 scopus 로고
    • Integrating scheduling with batching and lot-sizing: A review of algorithms and complexity
    • C.N. Potts, and L.N. van Wassenhove Integrating scheduling with batching and lot-sizing: a review of algorithms and complexity Journal of the Operational Research Society 43 1992 395 406
    • (1992) Journal of the Operational Research Society , vol.43 , pp. 395-406
    • Potts, C.N.1    Van Wassenhove, L.N.2
  • 27
    • 0036489508 scopus 로고    scopus 로고
    • Minimizing makespan in a two-machine flowshop with dynamic arrivals allowed
    • C.S. Sung, and Y.H. Kim Minimizing makespan in a two-machine flowshop with dynamic arrivals allowed Computers and Operations Research 29 3 2002 275 294
    • (2002) Computers and Operations Research , vol.29 , Issue.3 , pp. 275-294
    • Sung, C.S.1    Kim, Y.H.2
  • 28
    • 55149111576 scopus 로고    scopus 로고
    • Production scheduling with supply and delivery considerations to minimize the makespan
    • X. Wang, and T.C.E. Cheng Production scheduling with supply and delivery considerations to minimize the makespan European Journal of Operational Research 194 2009 743 752
    • (2009) European Journal of Operational Research , vol.194 , pp. 743-752
    • Wang, X.1    Cheng, T.C.E.2
  • 29
    • 77949490486 scopus 로고    scopus 로고
    • A novel genetic algorithm for solving production and transportation scheduling in a two-stage supply chain
    • S.H. Zegordi, I.N. Kamal Abadi, and M.A. Beheshti Nia A novel genetic algorithm for solving production and transportation scheduling in a two-stage supply chain Computers and Industrial Engineering 58 2010 373 381
    • (2010) Computers and Industrial Engineering , vol.58 , pp. 373-381
    • Zegordi, S.H.1    Kamal Abadi, I.N.2    Beheshti Nia, M.A.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.