메뉴 건너뛰기




Volumn , Issue , 2009, Pages 2198-2203

HVAC design informed by organizational simulation

Author keywords

[No Author keywords available]

Indexed keywords

BUILDING LOAD; DIVERSITY FACTORS; FRESH AIR; HEAT GAINS; HVAC DESIGNS; INTERNAL HEAT; LOAD DESIGN; MAJOR FACTORS; OCCUPANT LOAD; ORGANIZATIONAL INFORMATION; ORGANIZATIONAL SIMULATION;

EID: 84870215536     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: None     Document Type: Conference Paper
Times cited : (15)

References (9)
  • 5
    • 0344061933 scopus 로고    scopus 로고
    • An Analysis of Emergency Room Wait Time Issues Via Comupter Simulation
    • John T. Blake, M. W. C. (1996). An Analysis of Emergency Room Wait Time Issues Via Comupter Simulation. INFOR, 34(4), 12.
    • (1996) INFOR , vol.34 , Issue.4 , pp. 12
    • Blake, J.T.1
  • 7
    • 17744373326 scopus 로고    scopus 로고
    • Paper presented at the 2004 Winter Simulation Conference, Washington D.C., United States
    • Ming Guo, M. W., Constance West. (2004). Outpatient Clinic Scheduling-A Simulation Approach. Paper presented at the 2004 Winter Simulation Conference, Washington D.C., United States.
    • (2004) Outpatient Clinic Scheduling-A Simulation Approach
    • Ming, G.M.W.1    West, C.2
  • 8
    • 84889384692 scopus 로고    scopus 로고
    • Hoboken: John Wiley & Sons, Inc
    • William B. Rouse, K. R. B. (Ed.). (2005). Organizational Simulation. Hoboken: John Wiley & Sons, Inc.
    • (2005) Organizational Simulation
    • Rouse, W.B.1
  • 9
    • 57649212274 scopus 로고    scopus 로고
    • Health care as a complex adaptive system: Implications for design and management
    • Spring 2008
    • William B. Rouse (2008). Health care as a complex adaptive system: Implications for design and management. The Bridge, National Academy of Engineering. Vol 38, Number 1 (Spring 2008).
    • (2008) The Bridge, National Academy of Engineering , vol.38 , pp. 1
    • Rouse, W.B.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.