|
Volumn 41, Issue 3, 2009, Pages 17-23
|
Simulation of alternatives for transmission plant assembly line
a a a |
Author keywords
Assembly; Automotive industry; Discrete event simulation; Manufacturing processes
|
Indexed keywords
ANALYTICAL TOOL;
ASSEMBLY LINE;
COMPETITIVE PRESSURE;
COMPLEX MANUFACTURING;
DISCRETE EVENTS;
GREAT LAKES;
HIGH RELIABILITY;
HIGH THROUGHPUT;
LOW COSTS;
MANUFACTURING PROCESS;
MANUFACTURING SECTOR;
PERFORMANCE METRICS;
PROCESS SIMULATIONS;
PRODUCTION SYSTEM;
ASSEMBLY;
ASSEMBLY MACHINES;
AUTOMOTIVE INDUSTRY;
DISCRETE EVENT SIMULATION;
ECONOMICS;
MANUFACTURE;
MATERIALS HANDLING;
PRODUCTION ENGINEERING;
SUPPLY CHAINS;
INDUSTRIAL APPLICATIONS;
|
EID: 84870030331
PISSN: None
EISSN: None
Source Type: Conference Proceeding
DOI: None Document Type: Conference Paper |
Times cited : (3)
|
References (12)
|