메뉴 건너뛰기




Volumn 2012, Issue , 2012, Pages

Performance of grid-connected photovoltaic system in two sites in kuwait

Author keywords

[No Author keywords available]

Indexed keywords

LIFE CYCLE; METEOROLOGY;

EID: 84870026361     PISSN: 1110662X     EISSN: 1687529X     Source Type: Journal    
DOI: 10.1155/2012/178175     Document Type: Article
Times cited : (29)

References (10)
  • 2
    • 70349484820 scopus 로고    scopus 로고
    • Grid-connected photovoltaic power systems: Technical and potential problems-a review
    • 2-s2.0-70349484820 10.1016/j.rser.2009.07.015
    • Eltawil M. A., Zhao Z., Grid-connected photovoltaic power systems: technical and potential problems-a review. Renewable and Sustainable Energy Reviews 2010 14 1 112 129 2-s2.0-70349484820 10.1016/j.rser.2009.07.015
    • (2010) Renewable and Sustainable Energy Reviews , vol.14 , Issue.1 , pp. 112-129
    • Eltawil, M.A.1    Zhao, Z.2
  • 3
    • 77953735228 scopus 로고    scopus 로고
    • A review of designing, installing and evaluating standalone photovoltaic power systems
    • 2-s2.0-77953735228
    • Khatib T., A review of designing, installing and evaluating standalone photovoltaic power systems. Journal of Applied Sciences 2010 10 13 1212 1228 2-s2.0-77953735228
    • (2010) Journal of Applied Sciences , vol.10 , Issue.13 , pp. 1212-1228
    • Khatib, T.1
  • 4
    • 84869994893 scopus 로고    scopus 로고
    • Statistics Dept. & Information Center, Ministry Of Electricity & Water
    • Ministry of Electricity & Water (MEW), Electrical Energy. Edition 36A 2011 Statistics Dept. & Information Center, Ministry Of Electricity & Water
    • (2011) Electrical Energy. Edition 36A
  • 6
    • 0036591731 scopus 로고    scopus 로고
    • Assesment of grid-connected photovoltaic systems in the Kuwaiti climate
    • DOI 10.1016/S0960-1481(01)00115-X, PII S096014810100115X
    • Abdullah A. H., Ghoneim A. A., Al-Hasan A. Y., Assesment of grid-connected photovoltaic systems in the Kuwaiti climate. Renewable Energy 2002 26 2 189 199 2-s2.0-0036591731 10.1016/S0960-1481(01)00115-X (Pubitemid 34137773)
    • (2002) Renewable Energy , vol.26 , Issue.2 , pp. 189-199
    • Abdullah, A.H.1    Ghoneim, A.A.2    Al-Hasan, A.Y.3
  • 7
    • 58649091287 scopus 로고    scopus 로고
    • Performance analysis of a grid connected photovoltaic park on the island of crete
    • 2-s2.0-58649091287 10.1016/j.enconman.2008.12.009
    • Kymakis E., Kalykakis S., Papazoglou T. M., Performance analysis of a grid connected photovoltaic park on the island of crete. Energy Conversion and Management 2009 50 3 433 438 2-s2.0-58649091287 10.1016/j.enconman.2008.12.009
    • (2009) Energy Conversion and Management , vol.50 , Issue.3 , pp. 433-438
    • Kymakis, E.1    Kalykakis, S.2    Papazoglou, T.M.3
  • 8
    • 79951514122 scopus 로고    scopus 로고
    • Optimising the installation costs of renewable energy technologies in buildings: A linear programming approach
    • 2-s2.0-79951514122 10.1016/j.enbuild.2010.12.003
    • Privitera G., Day A. R., Dhesi G., Long D., Optimising the installation costs of renewable energy technologies in buildings: a linear programming approach. Energy and Buildings 2011 43 4 838 843 2-s2.0-79951514122 10.1016/j.enbuild.2010.12.003
    • (2011) Energy and Buildings , vol.43 , Issue.4 , pp. 838-843
    • Privitera, G.1    Day, A.R.2    Dhesi, G.3    Long, D.4
  • 9
    • 78049482139 scopus 로고    scopus 로고
    • Renewable energy options for buildings: Case studies
    • 2-s2.0-78049482139 10.1016/j.enbuild.2010.08.013
    • Rezaie B., Esmailzadeh E., Dincer I., Renewable energy options for buildings: case studies. Energy and Buildings 2011 43 1 56 65 2-s2.0-78049482139 10.1016/j.enbuild.2010.08.013
    • (2011) Energy and Buildings , vol.43 , Issue.1 , pp. 56-65
    • Rezaie, B.1    Esmailzadeh, E.2    Dincer, I.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.