-
1
-
-
85168256648
-
-
Details on California's Renewable Portfolio Standard can be found at .
-
Details on California's Renewable Portfolio Standard can be found at http://www.cpuc.ca.gov/PUC/energy/Renewables/overview.htm.
-
-
-
-
2
-
-
85168244724
-
-
California Energy Commission, California Energy Commission, Renewables Portfolio Standard Eligibility, 3rd. Ed., Sacramento, CA, Jan.
-
California Energy Commission, California Energy Commission, Renewables Portfolio Standard Eligibility, 3rd. Ed., Sacramento, CA, Jan. 2008.
-
(2008)
-
-
-
3
-
-
85168235145
-
-
EIA, 2002-2012: Annual Energy Outlook 2007/8: With Projections to 2030, DOE/EIA-0383 (2007/8).
-
EIA, 2002-2012: Annual Energy Outlook 2007/8: With Projections to 2030, DOE/EIA-0383 (2007/8).
-
-
-
-
4
-
-
11144266690
-
Transforming the Electric Infrastructure
-
Gellings C., Yeager K.E. Transforming the Electric Infrastructure. Phys. Today Dec. 2004.
-
(2004)
Phys. Today
-
-
Gellings, C.1
Yeager, K.E.2
-
5
-
-
85168243974
-
-
Integration of Renewable Resources: Operational Requirements and Generation Fleet Capability at 20% RPS, California Independent System Operator, Aug. 31
-
U. Helman et al., Integration of Renewable Resources: Operational Requirements and Generation Fleet Capability at 20% RPS, California Independent System Operator, Aug. 31, 2010.
-
(2010)
-
-
Helman, U.1
-
6
-
-
84868573094
-
Building Scale DC Microgrids
-
Case Western University, Cleveland
-
Marnay C., Lanzisera S., Stadler M., Lai J. Building Scale DC Microgrids. Paper Presented at IEEE EnergyTech 2012, Technology Frontiers in Sustainable Power and Energy 2012, Case Western University, Cleveland.
-
(2012)
Paper Presented at IEEE EnergyTech 2012, Technology Frontiers in Sustainable Power and Energy
-
-
Marnay, C.1
Lanzisera, S.2
Stadler, M.3
Lai, J.4
-
7
-
-
85168242872
-
Nanogrids, Power Distribution, and Building Networks
-
Nordman B. Nanogrids, Power Distribution, and Building Networks. Seminar at Berkeley Lab 2011, http://eetd-seminars.lbl.gov/seminar/nanogrids-power-distribution-building-networks.
-
(2011)
Seminar at Berkeley Lab
-
-
Nordman, B.1
-
8
-
-
84867437706
-
Why the Time Has Arrived to Rethink the Electric Business Model
-
Aug./Sept.
-
Sioshansi F.P. Why the Time Has Arrived to Rethink the Electric Business Model. Elec. J. 2012, Aug./Sept.. 10.1016/j.tej.2012.09.003.
-
(2012)
Elec. J.
-
-
Sioshansi, F.P.1
-
9
-
-
84862155188
-
Optimal Planning and Operation of Smart Grids with Electric Vehicle Interconnection
-
ISSN 0733-9402/e-ISSN-1943-7897
-
Stadler M., Marnay C., Kloess M., Cardoso G., Mendes G., Siddiqui A., Sharma R., Mégel O., Lai J. Optimal Planning and Operation of Smart Grids with Electric Vehicle Interconnection. J. of Energy Eng. Special Issue: Challenges and Opportunities in the 21st Century Energy Infrastructure June 2012, 138(2). ISSN 0733-9402/e-ISSN-1943-7897.
-
(2012)
J. of Energy Eng. Special Issue: Challenges and Opportunities in the 21st Century Energy Infrastructure
, vol.138
, Issue.2
-
-
Stadler, M.1
Marnay, C.2
Kloess, M.3
Cardoso, G.4
Mendes, G.5
Siddiqui, A.6
Sharma, R.7
Mégel, O.8
Lai, J.9
-
10
-
-
85168248349
-
-
Statistics, Photon: The Photovoltaic Magazine, Jan. at 111.
-
Statistics, Photon: The Photovoltaic Magazine, Vol. 1, Jan. 2012, at 111.
-
(2012)
, vol.1
-
-
-
11
-
-
85168245189
-
-
U.S. Department of Energy, The Potential Benefits of Distributed Generation and Rate-Related Issues That May Impede Its Expansion, study pursuant to Section 1817 of the Energy Policy Act of 2005, Washington DC, June
-
U.S. Department of Energy, The Potential Benefits of Distributed Generation and Rate-Related Issues That May Impede Its Expansion, study pursuant to Section 1817 of the Energy Policy Act of 2005, Washington DC, June 2007.
-
(2007)
-
-
|