메뉴 건너뛰기




Volumn , Issue , 2012, Pages

Integration of wind power plants into the electric system - The Brazilian experience

Author keywords

Grid Code; Renewable Generation; Wind Power Plants

Indexed keywords

ELECTRIC SYSTEMS; GRID CODES; RENEWABLE GENERATION; THERMAL GENERATING UNITS; UNIT GENERATOR; VOLTAGE AND FREQUENCY CONTROL;

EID: 84869412279     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/TDC-LA.2012.6319134     Document Type: Conference Paper
Times cited : (8)

References (12)
  • 10
    • 84872118611 scopus 로고    scopus 로고
    • Overcoming Operational Challenges to maximize the levels of wind integration - A System Operator perspective
    • paper C2-105
    • Yvonne Coughlan, J.O'Sullivan, S.Rourke,A. Kennedy, "Overcoming Operational Challenges to maximize the levels of wind integration - a System Operator perspective" - paper C2-105, CIGRÉ 2012 Session.
    • CIGRÉ 2012 Session
    • Coughlan, Y.1    O'Sullivan, J.2    Rourke, S.3    Kennedy, A.4
  • 12
    • 84956862081 scopus 로고    scopus 로고
    • Wind turbine generator controls: Meeting present and future grid code requirements
    • paper C2-101
    • S. El Itany,G.Joods, "Wind turbine generator controls: meeting present and future grid code requirements", paper C2-101 - CIGRÉ 2012 Session.
    • CIGRÉ 2012 Session
    • El Itany, S.1    Joods, G.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.