메뉴 건너뛰기




Volumn , Issue , 2012, Pages

Data centres in the ancillary services market

Author keywords

ancillary services; electrical markets; simulation; smart grids

Indexed keywords

ANCILLARY SERVICE; ANCILLARY SERVICES MARKETS; DATA CENTRES; ELECTRICAL GRIDS; ELECTRICAL MARKET; ENERGY COST; ENERGY USE; LARGE DATA; POWER GRIDS; SIMULATION; SMART GRID; SUPPLY AND DEMAND;

EID: 84869389454     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/IGCC.2012.6322252     Document Type: Conference Paper
Times cited : (41)

References (48)
  • 2
    • 47249127725 scopus 로고    scopus 로고
    • The case for energy-proportional computing
    • L. A. Barroso and U. Holzle, "The case for energy-proportional computing," Computer, vol. 40, no. 12, pp. 33-37, 2007.
    • (2007) Computer , vol.40 , Issue.12 , pp. 33-37
    • Barroso, L.A.1    Holzle, U.2
  • 5
    • 84870633244 scopus 로고    scopus 로고
    • "EnerNOC," http://www.enernoc.com.
    • EnerNOC
  • 17
    • 79960180251 scopus 로고    scopus 로고
    • Optimal power cost management using stored energy in data centers
    • Jun.
    • R. Urgaonkar, B. Urgaonkar, M. J. Neely, and A. Sivasubramanian, "Optimal power cost management using stored energy in data centers," in SIGMETRICS, Jun. 2011, pp. 221-232.
    • (2011) SIGMETRICS , pp. 221-232
    • Urgaonkar, R.1    Urgaonkar, B.2    Neely, M.J.3    Sivasubramanian, A.4
  • 18
    • 81055138232 scopus 로고    scopus 로고
    • Leveraging thermal storage to cut the electricity bill for datacenter cooling
    • ser. HotPower '11. New York, NY, USA: ACM
    • Y. Wang, X. Wang, and Y. Zhang, "Leveraging thermal storage to cut the electricity bill for datacenter cooling," in Proceedings of the 4th Workshop on Power-Aware Computing and Systems, ser. HotPower '11. New York, NY, USA: ACM, 2011, pp. 8:1-8:5.
    • (2011) Proceedings of the 4th Workshop on Power-Aware Computing and Systems
    • Wang, Y.1    Wang, X.2    Zhang, Y.3
  • 20
    • 18844449403 scopus 로고    scopus 로고
    • Vehicle-to-grid power fundamentals: Calculating capacity and net revenue
    • W. Kempton and J. Tomic, "Vehicle-to-grid power fundamentals: Calculating capacity and net revenue," Journal of Power Sources, vol. 144, no. 1, pp. 268-279, 2005.
    • (2005) Journal of Power Sources , vol.144 , Issue.1 , pp. 268-279
    • Kempton, W.1    Tomic, J.2
  • 21
    • 84870630819 scopus 로고    scopus 로고
    • IVGTF Task 2.4 Report, Mar. [Online]. Available
    • "Operating practices, procedures, and tools," North American Electrical Reliability Corporation, IVGTF Task 2.4 Report, Mar. 2011. [Online]. Available: http://www.nerc.com/docs/pc/ivgtf/IVGTF2-4.pdf
    • (2011) Operating Practices, Procedures, and Tools
  • 23
    • 42549083091 scopus 로고    scopus 로고
    • Manual 2, Oct. [Online]. Available
    • "Ancillary services manual," New York Independent System Operator, Manual 2, Oct. 2011. [Online]. Available: http://www.nyiso.com/public/ webdocs/documents/manuals/operations/ancserv.pdf
    • (2011) Ancillary Services Manual
  • 24
    • 84870644932 scopus 로고    scopus 로고
    • Manual 14, May [Online]. Available
    • "Accounting and billing manual," New York Independent System Operator, Manual 14, May 2011. [Online]. Available: http://www.nyiso.com/public/ webdocs/documents/manuals/administrative/acctbillmnl.pdf
    • (2011) Accounting and Billing Manual
  • 25
    • 84870640568 scopus 로고    scopus 로고
    • Nov.
    • D. Pratt, "Demand side ancillary services," http://www.nyiso.com/public/webdocs/services/market-training/workshops-courses/ other/demand-side-ancilsvcs.pdf, Nov. 2008.
    • (2008) Demand Side Ancillary Services
    • Pratt, D.1
  • 26
    • 84860220340 scopus 로고    scopus 로고
    • 2010 ISO/RTO Metrics Report Appendix G, [Online]. Available
    • "New York Independent System Operator (NYISO)," Federal Energy Regulatory Commission, 2010 ISO/RTO Metrics Report Appendix G, 2010. [Online]. Available: http://www.ferc.gov/industries/electric/indus-act/rto/metrics/nyiso- rto-metrics.pdf
    • (2010) New York Independent System Operator (NYISO)
  • 27
    • 84856611023 scopus 로고    scopus 로고
    • Growth in data center electricity use 2005 to 2010
    • Analytics Press at the request of the Oakland, CA, Tech. Rep., Aug.
    • J. G. Koomey, "Growth in data center electricity use 2005 to 2010," Analytics Press at the request of the New York Times, Oakland, CA, Tech. Rep., Aug. 2011.
    • (2011) New York Times
    • Koomey, J.G.1
  • 31
    • 0003572134 scopus 로고    scopus 로고
    • Oak Ridge National Laboratory, Tech. Rep. ORNL/CON-452, Nov. [Online]. Available
    • E. Hirst and B. Kirby, "Ancillary-service details: operating reserves," Oak Ridge National Laboratory, Tech. Rep. ORNL/CON-452, Nov. 1997. [Online]. Available: http://www.osti.gov/energycitations/product.biblio. jsp?osti-id=614919
    • (1997) Ancillary-service Details: Operating Reserves
    • Hirst, E.1    Kirby, B.2
  • 33
    • 84870630868 scopus 로고    scopus 로고
    • Tech. Rep., Jul. [Online]. Available
    • "Historic EDRP and SCR activation information," New York Independent System Operator, Tech. Rep., Jul. 2011. [Online]. Available: http://www.nyiso.com/public/webdocs/products/demand-response/general-info/ event-history.pdf
    • (2011) Historic EDRP and SCR Activation Information
  • 34
    • 61649117759 scopus 로고    scopus 로고
    • Air emissions due to wind and solar power
    • W. Katzenstein and J. Apt, "Air emissions due to wind and solar power," Environmental Science & Technology, vol. 43, no. 2, pp. 253-258, 2009.
    • (2009) Environmental Science & Technology , vol.43 , Issue.2 , pp. 253-258
    • Katzenstein, W.1    Apt, J.2
  • 37
    • 84870652018 scopus 로고    scopus 로고
    • Discussion Paper, May [Online]. Available
    • "Short-term wind integration," Alberta Electrical System Operator, Discussion Paper, May 2010. [Online]. Available: http://www.aeso.ca/ downloads/Wind-Integration-Discussion-Paper.pdf
    • (2010) Short-term Wind Integration
  • 38
    • 84870640919 scopus 로고    scopus 로고
    • Discussion Paper, Dec. [Online]. Available
    • "Phase two wind integration," Alberta Electrical System Operator, Discussion Paper, Dec. 2010. [Online]. Available: http://www.aeso.ca/ downloads/Wind-Integration-Discussion-Paper---Phase-Two.pdf
    • (2010) Phase Two Wind Integration
  • 41
    • 79955885865 scopus 로고    scopus 로고
    • Characteristics of the prices of operating reserves and regulation services in competitive electricity markets
    • P. Wang, H. Zareipour, and W. D. Rosehart, "Characteristics of the prices of operating reserves and regulation services in competitive electricity markets," Energy Policy, vol. 39, no. 6, pp. 3210-3221, 2011.
    • (2011) Energy Policy , vol.39 , Issue.6 , pp. 3210-3221
    • Wang, P.1    Zareipour, H.2    Rosehart, W.D.3
  • 44
    • 34248524480 scopus 로고    scopus 로고
    • The spectrum of power from wind turbines
    • J. Apt, "The spectrum of power from wind turbines," Journal of Power Sources, vol. 169, no. 2, pp. 369-374, 2007.
    • (2007) Journal of Power Sources , vol.169 , Issue.2 , pp. 369-374
    • Apt, J.1
  • 45
    • 62649136694 scopus 로고    scopus 로고
    • Comparative analyses of seven technologies to facilitate the integration of fluctuating renewable energy sources
    • Jun.
    • B. V. Mathiesen and H. Lund, "Comparative analyses of seven technologies to facilitate the integration of fluctuating renewable energy sources," IET Renewable Power Generation, vol. 3, no. 2, pp. 190-204, Jun. 2009.
    • (2009) IET Renewable Power Generation , vol.3 , Issue.2 , pp. 190-204
    • Mathiesen, B.V.1    Lund, H.2
  • 47
    • 36348942495 scopus 로고    scopus 로고
    • Long-run incremental cost pricing based on unused capacity
    • Nov.
    • F. Li and D. L. Tolley, "Long-run incremental cost pricing based on unused capacity," IEEE Transactions on Power Systems, vol. 22, no. 4, pp. 1683-1689, Nov. 2007.
    • (2007) IEEE Transactions on Power Systems , vol.22 , Issue.4 , pp. 1683-1689
    • Li, F.1    Tolley, D.L.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.