Volumn 50, Issue 22, 2012, Pages 6372-6387

Cycle time analysis in reentrant robotic cells with swap ability

Author keywords

Robotic cells; Sequencing

Indexed keywords

CELL SCHEDULING; CYCLE TIME; OPTIMALITY; OPTIMALITY CONDITIONS; PARAMETER VALUES; REENTRANT ROBOTIC CELLS; ROBOTIC CELL; SEQUENCING; SINGLE PARTS; SUFFICIENT CONDITIONS;

EID: 84868217987     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207543.2011.642823     Document Type: Article
Times cited : (32)

References (35)
  • 1
  • 4
    • 3042869197 scopus 로고    scopus 로고
    • Flow-shop robotisé monoproduit avec stockage
    • Brauner, N., Finke, G., and Gueguen, C., 1998. Flow-shop robotize monoproduit avec stockage. European Journal of Automation/Journal Européen des Systèmes Automatisés - APII-JESA, 32 (7/8), 875-891. (Pubitemid 128537673)
    • (1998) Journal Europeen des Systemes Automatises , vol.32 , Issue.7-8 , pp. 875-891
    • Brauner, N.1    Finke, G.2    Gueguen, C.3
  • 5
    • 0002804434 scopus 로고    scopus 로고
    • On a conjecture about robotic cells: New simplified proof for the three-machine case
    • Brauner, N. and Finke, G., 1999. On a conjecture in robotic cells: new simplified proof for the three-machine case. INFOR, 37 (1), 20-36. (Pubitemid 129701794)
    • (1999) INFOR , vol.37 , Issue.1 , pp. 20-36
    • Brauner, N.1    Finke, G.2
  • 6
    • 0035546060 scopus 로고    scopus 로고
    • Optimal moves of the material handling system in a robotic cell
    • DOI 10.1016/S0925-5273(01)00132-3, PII S0925527301001323
    • Brauner, N. and Finke, G., 2001. Optimal moves of the material handling system in a robotic cell. International Journal of Production Economics, 74 (1-3), 269-277. (Pubitemid 32998211)
    • (2001) International Journal of Production Economics , vol.74 , Issue.1-3 , pp. 269-277
    • Brauner, N.1    Finke, G.2
  • 7
    • 49749086485 scopus 로고    scopus 로고
    • Identical part production in cyclic robotic cells: Concepts, overview and open questions
    • Brauner, N., 2008. Identical part production in cyclic robotic cells: concepts, overview and open questions. Discrete Applied Mathematics, 156 (13), 2480-2492.
    • (2008) Discrete Applied Mathematics , vol.156 , Issue.13 , pp. 2480-2492
    • Brauner, N.1
  • 8
    • 0036476753 scopus 로고    scopus 로고
    • Multicyclic hoist scheduling with constant processing times
    • DOI 10.1109/70.988976, PII S1042296X02017780
    • Che, A., Chu, C., and Chu, F., 2002. Multicyclic hoist scheduling with constant processing times. IEEE Transactions on Robotics and Automation, 18 (1), 69-80. (Pubitemid 34414687)
    • (2002) IEEE Transactions on Robotics and Automation , vol.18 , Issue.1 , pp. 69-80
    • Che, A.1    Chu, C.2    Chu, F.3
  • 9
    • 67349222218 scopus 로고    scopus 로고
    • Multi-degree cyclic scheduling of a no-wait robotic cell with multiple robots
    • Che, A. and Chu, C., 2009. Multi-degree cyclic scheduling of a no-wait robotic cell with multiple robots. European Journal of Operational Research, 199 (1), 77-88.
    • (2009) European Journal of Operational Research , vol.199 , Issue.1 , pp. 77-88
    • Che, A.1    Chu, C.2
  • 10
    • 74549120245 scopus 로고    scopus 로고
    • Optimal cyclic scheduling of a hoist and multi-type parts with fixed processing times
    • Che, A., et al., 2010. Optimal cyclic scheduling of a hoist and multi-type parts with fixed processing times. International Journal of Production Research, 48 (5), 1225-1243.
    • (2010) International Journal of Production Research , vol.48 , Issue.5 , pp. 1225-1243
    • Che, A.1
  • 11
    • 79251626563 scopus 로고    scopus 로고
    • A polynomial algorithm for multi-robot 2-cyclic scheduling in a no-wait robotic cell
    • Che, A., et al., 2011. A polynomial algorithm for multi-robot 2-cyclic scheduling in a no-wait robotic cell. Computers & Operations Research, 38 (9), 1275-1285.
    • (2011) Computers & Operations Research , vol.38 , Issue.9 , pp. 1275-1285
    • Che, A.1
  • 12
    • 0002604088 scopus 로고    scopus 로고
    • Cyclic scheduling in 3-machine robotic flow shops
    • Crama, Y. and Van de Klundert, J., 1999. Cyclic scheduling in 3-machine robotic flow shops. Journal of Scheduling, 2 (1), 35-54. (Pubitemid 129633834)
    • (1999) Journal of Scheduling , vol.2 , Issue.1 , pp. 35-54
    • Crama, Y.1    Van De Klundert, J.2
  • 13
    • 0034367676 scopus 로고    scopus 로고
    • Cyclic scheduling in robotic flowshops
    • Crama, Y., et al., 2000. Cyclic scheduling in robotic flowshops. Annals of Operations Research, 96 (1-4), 97-124.
    • (2000) Annals of Operations Research , vol.96 , Issue.1-4 , pp. 97-124
    • Crama, Y.1
  • 15
    • 23944522312 scopus 로고    scopus 로고
    • Sequencing and scheduling in robotic cells: Recent developments
    • DOI 10.1007/s10951-005-2861-9
    • Dawande, M., et al., 2005. Sequencing and scheduling in robotic cells: recent developments. Journal of Scheduling, 8 (5), 387-426. (Pubitemid 41202890)
    • (2005) Journal of Scheduling , vol.8 , Issue.5 , pp. 387-426
    • Dawande, M.1    Geismar, H.N.2    Sethi, S.P.3    Sriskandarajah, C.4
  • 16
    • 28244447024 scopus 로고    scopus 로고
    • Scheduling dual gripper robotic cell: One-unit cycles
    • DOI 10.1016/j.ejor.2004.09.019, PII S0377221704006447
    • Drobouchevitch, G., Sethi, S.P., and Sriskandarajah, C., 2006. Scheduling dual gripper robotic cells: one-unit cycles. European Journal of Operational Research, 171 (2), 598-631. (Pubitemid 41706217)
    • (2006) European Journal of Operational Research , vol.171 , Issue.2 , pp. 598-631
    • Drobouchevitch, I.G.1    Sethi, S.P.2    Sriskandarajah, C.3
  • 19
    • 77957890217 scopus 로고    scopus 로고
    • Robotic cells with stochastic processing times
    • Geismar, H.N. and Pinedo, M., 2010. Robotic cells with stochastic processing times. IIE Transactions, 42 (12), 897-914.
    • (2010) IIE Transactions , vol.42 , Issue.12 , pp. 897-914
    • Geismar, H.N.1    Pinedo, M.2
  • 21
    • 70350571109 scopus 로고    scopus 로고
    • Bicriteria robotic operation allocation in a flexible manufacturing cell
    • Gultekin, H., Akturk, M.S., and Karasan, O.E., 2010. Bicriteria robotic operation allocation in a flexible manufacturing cell. Computers & Operations Research, 37 (4), 779-789.
    • (2010) Computers & Operations Research , vol.37 , Issue.4 , pp. 779-789
    • Gultekin, H.1    Akturk, M.S.2    Karasan, O.E.3
  • 22
    • 0035885224 scopus 로고    scopus 로고
    • Makespan minimization for flow-shop problems with transportation times and a single robot
    • DOI 10.1016/S0166-218X(00)00316-4, PII S0166218X00003164
    • Hurink, J. and Knust, S., 2001. Makespan minimization for flow-shop problems with transportation times and a single robot. Discrete Applied Mathematics, 112 (1-3), 199-216. (Pubitemid 33676141)
    • (2001) Discrete Applied Mathematics , vol.112 , Issue.1-3 , pp. 199-216
    • Hurink, J.1    Knust, S.2
  • 23
    • 84870946514 scopus 로고    scopus 로고
    • Cyclic scheduling of a robotic flexible cell with load lock and swap
    • In press, doi:10.1007/s 10845-011-0505-0509
    • Jolai, F., et al., 2011. Cyclic scheduling of a robotic flexible cell with load lock and swap. Journal of Intelligent Manufacturing. In press, doi:10.1007/s 10845-011-0505-9.
    • (2011) Journal of Intelligent Manufacturing
    • Jolai, F.1
  • 25
    • 0031635632 scopus 로고    scopus 로고
    • A polynomial algorithm for scheduling small-scale manufacturing cells served by multiple robots
    • Kogan, K. and Levner, E., 1998. A polynomial algorithm for scheduling small-scale manufacturing cells served by multiple robots. Computers & Operations Research, 25 (1), 53-62. (Pubitemid 128655002)
    • (1998) Computers and Operations Research , vol.25 , Issue.1 , pp. 53-62
    • Koganl, K.1    Levner, E.2
  • 26
    • 33646717079 scopus 로고    scopus 로고
    • Scheduling single-armed cluster tools with reentrant wafer flows
    • Lee, H.Y. and Lee, T.E., 2006. Scheduling single-armed cluster tools with reentrant wafer flows. IEEE Transactions on Semiconductor Manufacturing, 19 (2), 226-240.
    • (2006) IEEE Transactions on Semiconductor Manufacturing , vol.19 , Issue.2 , pp. 226-240
    • Lee, H.Y.1    Lee, T.E.2
  • 27
    • 0029491089 scopus 로고
    • Flowshop scheduling of robotic cells with job-dependent transportation and set-up effects
    • Levner, E., Kogan, K., and Maimon, O., 1995. Flowshop scheduling of robotic cells with job-dependent transportation and set-up effects. Journal of the Operational Research Society, 46 (12), 1447-1455.
    • (1995) Journal of the Operational Research Society , vol.46 , Issue.12 , pp. 1447-1455
    • Levner, E.1    Kogan, K.2    Maimon, O.3
  • 30
    • 5144232236 scopus 로고    scopus 로고
    • Resolution of a scheduling problem in a Fowshop robotic cell
    • Soukhal, A. and Martineau, P., 2005. Resolution of a scheduling problem in a Fowshop robotic cell. European Journal of Operational Research, 161 (1), 62-72.
    • (2005) European Journal of Operational Research , vol.161 , Issue.1 , pp. 62-72
    • Soukhal, A.1    Martineau, P.2
  • 31
    • 17444428658 scopus 로고    scopus 로고
    • Scheduling in reentrant robotic cells: Algorithms and complexity
    • DOI 10.1007/s10951-005-5314-6
    • Steiner, G. and Xue, Z., 2005. Scheduling in reentrant robotic cells: algorithms and complexity. Journal of Scheduling, 8 (1), 25-48. (Pubitemid 40536258)
    • (2005) Journal of Scheduling , vol.8 , Issue.1 , pp. 25-48
    • Steiner, G.1    Xue, Z.2
  • 32
    • 84868252271 scopus 로고    scopus 로고
    • Cycle time analysis for wafer revisiting process in scheduling of single-arm cluster tools
    • In press, doi: 10.3724/SP.J.1005. 2008.00225
    • Sun, Y. and Wu, N., 2010. Cycle time analysis for wafer revisiting process in scheduling of single-arm cluster tools. International Journal of Automation and Computing. In press, doi: 10.3724/SP.J.1005. 2008.00225.
    • (2010) International Journal of Automation and Computing
    • Sun, Y.1    Wu, N.2
  • 33
    • 77956689709 scopus 로고    scopus 로고
    • A branch and bound algorithm for optimal cyclic scheduling in a robotic cell with processing time windows
    • Yan, P., et al., 2010. A branch and bound algorithm for optimal cyclic scheduling in a robotic cell with processing time windows. International Journal of Production Research, 48 (21), 6461-6480.
    • (2010) International Journal of Production Research , vol.48 , Issue.21 , pp. 6461-6480
    • Yan, P.1
  • 34
    • 80053342524 scopus 로고    scopus 로고
    • An analysis of cyclic scheduling problems in robot centered cells
    • Yildiz, S., Karasan, O.E., and Akturk, M.S., 2010. An analysis of cyclic scheduling problems in robot centered cells. Computers & Operations Research, 39 (6), 1290-1299.
    • (2010) Computers & Operations Research , vol.39 , Issue.6 , pp. 1290-1299
    • Yildiz, S.1    Karasan, O.E.2    Akturk, M.S.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.