-
1
-
-
0000629441
-
Multi-agent planning and coordination for distributed concurrent engineering
-
Balasubramanian, S., Maturana, F.P., and Norrie, D.H., 1996. Multi-agent planning and coordination for distributed concurrent engineering. International Journal of Cooperative Information Systems, 5 (2-3), 153-179. (Pubitemid 126717382)
-
(1996)
International Journal of Cooperative Information Systems
, vol.5
, Issue.2-3
, pp. 153-179
-
-
Balasubramanian, S.1
Maturana, F.P.2
Norrie, D.H.3
-
2
-
-
28944454561
-
Ant colony optimization: Introduction and recent trends
-
DOI 10.1016/j.plrev.2005.10.001, PII S1571064505000333
-
Blum, C., 2005. Ant colony optimization: introduction and recent trends. Physics of Life Reviews, 2 (4), 353-373. (Pubitemid 41781478)
-
(2005)
Physics of Life Reviews
, vol.2
, Issue.4
, pp. 353-373
-
-
Blum, C.1
-
3
-
-
18744404504
-
An ant colony optimization algorithm for shop scheduling problems
-
DOI 10.1023/B:JMMA.0000038614.39977.6f
-
Blum, C. and Sampels, M., 2004. An ant colony optimization algorithm for shop scheduling problems. Journal of Mathematical Modelling and Algorithms, 3 (3), 285-308. (Pubitemid 40678150)
-
(2004)
Journal of Mathematical Modelling and Algorithms
, vol.3
, Issue.3
, pp. 285-308
-
-
Blum, C.1
Sampels, M.2
-
5
-
-
65249125899
-
Ant colony optimization system for a multi-quantitative and qualitative objective job-shop parallelmachine- scheduling problem
-
Chang, P.T., et al., 2008. Ant colony optimization system for a multi-quantitative and qualitative objective job-shop parallelmachine- scheduling problem. International Journal of Production Research, 46 (20), 5719-5759.
-
(2008)
International Journal of Production Research
, vol.46
, Issue.20
, pp. 5719-5759
-
-
Chang, P.T.1
-
6
-
-
0002298494
-
Ant system for job-shop scheduling
-
Colorni, A., et al., 1994. Ant system for job-shop scheduling. Belgian Journal of Operations Research, Statistics and Computer Science, 34 (1), 39-53.
-
(1994)
Belgian Journal of Operations Research, Statistics and Computer Science
, vol.34
, Issue.1
, pp. 39-53
-
-
Colorni, A.1
-
7
-
-
0030082551
-
Ant system: Optimization by a colony of cooperating agents
-
PII S1083441996004177
-
Dorigo, M., Maniezzo, V., and Colorni, A., 1996. The ant system: optimization by a colony of cooperating agents. IEEE Transactions on Systems, Man and Cybernetics, Part B, 26 (2), 29-41. (Pubitemid 126780573)
-
(1996)
IEEE Transactions on Systems, Man, and Cybernetics, Part B: Cybernetics
, vol.26
, Issue.1
, pp. 29-41
-
-
Dorigo, M.1
Maniezzo, V.2
Colorni, A.3
-
8
-
-
0032630439
-
Manufacturing responsiveness through integrated process planning and scheduling
-
Gindy, N.N., Saad, S.M., and Yue, Y., 1999. Manufacturing responsiveness through integrated process planning and scheduling. International Journal of Production Research, 37 (11), 2399-2418.
-
(1999)
International Journal of Production Research
, vol.37
, Issue.11
, pp. 2399-2418
-
-
Gindy, N.N.1
Saad, S.M.2
Yue, Y.3
-
9
-
-
0031121228
-
Bidding-based process planning and scheduling in a multi-agent system
-
PII S0360835296000563
-
Gu, P., Balasubramanian, S., and Norrie, D.H., 1997. Bidding-based process planning and scheduling in a multi-agent system. Computers & Industrial Engineering, 32 (2), 477-496. (Pubitemid 127406328)
-
(1997)
Computers and Industrial Engineering
, vol.32
, Issue.2
, pp. 477-496
-
-
Gu, P.1
Balasubramanian, S.2
Norrie, D.H.3
-
10
-
-
0030270466
-
Solving cell formation problems in a manufacturing environment with flexible processing and routeing capabilities
-
Ho, Y.C. and Moodie, C.L., 1996. Solving cell formation problems in a manufacturing environment with flexible processing and routing capabilities. International Journal of Production Research, 34 (10), 2901-2923. (Pubitemid 126519746)
-
(1996)
International Journal of Production Research
, vol.34
, Issue.10
, pp. 2901-2923
-
-
Ho, Y.-C.1
Moodie, C.L.2
-
11
-
-
79251627866
-
A progressive approach for the integration of process planning and scheduling
-
Huang, S.H., Zhang, H.C., and Smith, M.L., 1995. A progressive approach for the integration of process planning and scheduling. IIE Transactions, 1 (4), 456-464.
-
(1995)
IIE Transactions
, vol.1
, Issue.4
, pp. 456-464
-
-
Huang, S.H.1
Zhang, H.C.2
Smith, M.L.3
-
12
-
-
0028401319
-
Flexible process plans: Their value in flexible automation systems
-
Hutchinson, G.K. and Pflughoeft, K.A., 1994. Flexible process plans: their value in flexible automation systems. International Journal of Production Research, 32 (3), 707-719.
-
(1994)
International Journal of Production Research
, vol.32
, Issue.3
, pp. 707-719
-
-
Hutchinson, G.K.1
Pflughoeft, K.A.2
-
13
-
-
0026155862
-
Scheduling approaches for random job shop flexible manufacturing systems
-
Hutchison, J., et al., 1991. Scheduling approaches for random job shop flexible manufacturing systems. International Journal of Production Research, 29 (5), 1053-1067.
-
(1991)
International Journal of Production Research
, vol.29
, Issue.5
, pp. 1053-1067
-
-
Hutchison, J.1
-
14
-
-
0012473394
-
Optimization of selection of machine-tool, loading sequence of parts and machining conditions in job-shop type machining systems
-
Iwata, K., Murotsu, Y., and Oba, F., 1978. Optimization of selection of machine-tool, loading sequence of parts and machining conditions in job-shop type machining systems. Annals of the CIRP, 27 (1), 447-451.
-
(1978)
Annals of the CIRP
, vol.27
, Issue.1
, pp. 447-451
-
-
Iwata, K.1
Murotsu, Y.2
Oba, F.3
-
15
-
-
33746031638
-
Integration of process planning and scheduling functions
-
Khoshnevis, B. and Chen, Q., 1990. Integration of process planning and scheduling functions. Journal of Intelligent Manufacturing, 1 (2), 165-176.
-
(1990)
Journal of Intelligent Manufacturing
, vol.1
, Issue.2
, pp. 165-176
-
-
Khoshnevis, B.1
Chen, Q.2
-
16
-
-
0032044924
-
A mathematical model for job shop scheduling with multiple process plan consideration per job
-
Kim, K.H. and Egbelu, P.J., 1998. A mathematical model for job shop scheduling with multiple process plan consideration per job. Production Planning and Control, 9 (3), 250-259. (Pubitemid 128624325)
-
(1998)
Production Planning and Control
, vol.9
, Issue.3
, pp. 250-259
-
-
Kim, K.-H.1
Egbelu, P.J.2
-
17
-
-
0032690982
-
Scheduling in a production environment with multiple process plans per job
-
Kim, K.H. and Egbelu, P.J., 1999. Scheduling in a production environment with multiple process plans per job. International Journal of Production Research, 37 (12), 2725-2753.
-
(1999)
International Journal of Production Research
, vol.37
, Issue.12
, pp. 2725-2753
-
-
Kim, K.H.1
Egbelu, P.J.2
-
18
-
-
0031366277
-
A negotiation based scheduling for items with flexible process plans
-
PII S0360835297002532
-
Kim, K.H., Song, J.Y., and Wang, K.H., 1997. A negotiation based scheduling for items with flexible process plan. Computers in Industrial Engineering, 33 (3-4), 785-788. (Pubitemid 127406902)
-
(1997)
Computers and Industrial Engineering
, vol.33
, Issue.3-4
, pp. 785-788
-
-
Kim, K.H.1
Song, J.Y.2
Wang, K.H.3
-
19
-
-
0037410965
-
A symbiotic evolutionary algorithm for the integration of process planning and job shop scheduling
-
DOI 10.1016/S0305-0548(02)00063-1, PII S0305054802000631
-
Kim, Y.K., Park, K., and Ko, J., 2003. A symbiotic evolutionary algorithm for the integration of process planning and job shop scheduling. Computers & Operations Research, 30 (8), 1151-1171. (Pubitemid 36346002)
-
(2003)
Computers and Operations Research
, vol.30
, Issue.8
, pp. 1151-1171
-
-
Kim, Y.K.1
Park, K.2
Ko, J.3
-
20
-
-
0042021869
-
Job-shop scheduling with processing alternatives
-
Kis, T., 2003. Job-shop scheduling with processing alternatives. European Journal of Operational Research, 151 (2), 307-332.
-
(2003)
European Journal of Operational Research
, vol.151
, Issue.2
, pp. 307-332
-
-
Kis, T.1
-
21
-
-
0035923926
-
External partner selection using tabu search heuristics in distributed manufacturing
-
DOI 10.1080/00207540110072263
-
Ko, C.S., Kim, T., and Hwang, H., 2001. External partner selection using tabu search heuristics in distributed manufacturing. International Journal of Production Research, 39 (17), 3959-3974. (Pubitemid 35165494)
-
(2001)
International Journal of Production Research
, vol.39
, Issue.17
, pp. 3959-3974
-
-
Ko, C.S.1
Kim, T.2
Hwang, H.3
-
22
-
-
0242493312
-
Scheduling of flexible manufacturing systems: An ant colony optimization approach
-
Kumar, R., Tiwari, M.K., and Shankar, R., 2003. Scheduling of flexible manufacturing systems: an ant colony optimization approach. Proceedings of the I MECH E Part B Journal of Engineering Manufacture, 217 (11), 1443-1453.
-
(2003)
Proceedings of the i MECH e Part B Journal of Engineering Manufacture
, vol.217
, Issue.11
, pp. 1443-1453
-
-
Kumar, R.1
Tiwari, M.K.2
Shankar, R.3
-
23
-
-
0035175069
-
Integration of process planning and scheduling using simulation based genetic algorithms
-
DOI 10.1007/s001700170035
-
Lee, H. and Kim, S.S., 2001. Integration of process planning and scheduling using simulation based genetic algorithms. International Journal of Advanced Manufacturing Technology, 18 (8), 586-590. (Pubitemid 33074064)
-
(2001)
International Journal of Advanced Manufacturing Technology
, vol.18
, Issue.8
, pp. 586-590
-
-
Lee, H.1
Kim, S.-S.2
-
24
-
-
77955268719
-
Integrated process planning and scheduling by an agent-based ant colony optimization
-
Leung, C.W., et al., 2010. Integrated process planning and scheduling by an agent-based ant colony optimization. Computers & Industrial Engineering, 59 (1), 166-180.
-
(2010)
Computers & Industrial Engineering
, vol.59
, Issue.1
, pp. 166-180
-
-
Leung, C.W.1
-
25
-
-
84950937653
-
Integrated shop floor control using autonomous agents
-
Lin, G.Y.J. and Solberg, J.J., 1992. Integrated shop floor control using autonomous agents. IIE Transactions, 24 (3), 57-71.
-
(1992)
IIE Transactions
, vol.24
, Issue.3
, pp. 57-71
-
-
Lin, G.Y.J.1
Solberg, J.J.2
-
26
-
-
0037272238
-
Ant colony optimization with global pheromone evaluation for scheduling a single machine
-
Merkle, D. and Middendorf, M., 2003. Ant colony optimization with global pheromone evaluation for scheduling a single machine. Applied Intelligence, 18 (1), 105-111.
-
(2003)
Applied Intelligence
, vol.18
, Issue.1
, pp. 105-111
-
-
Merkle, D.1
Middendorf, M.2
-
27
-
-
0036672003
-
Ant colony optimization for resource-constrained project scheduling
-
DOI 10.1109/TEVC.2002.802450, PII 1011092002802450
-
Merkle, D., Middendorf, M., and Schmeck, H., 2002. Ant colony optimization for resource-constrained project scheduling. IEEE Transactions on Evolutionary Computation, 6 (4), 333-346. (Pubitemid 35032735)
-
(2002)
IEEE Transactions on Evolutionary Computation
, vol.6
, Issue.4
, pp. 333-346
-
-
Merkle, D.1
Middendorf, M.2
Schmeck, H.3
-
28
-
-
0032642660
-
Genetic algorithms in integrated process planning and scheduling
-
Morad, N. and Zalzala, A., 1999. Genetic algorithms in integrated process planning and scheduling. Journal of Intelligent Manufacturing, 10 (2), 169-179.
-
(1999)
Journal of Intelligent Manufacturing
, vol.10
, Issue.2
, pp. 169-179
-
-
Morad, N.1
Zalzala, A.2
-
30
-
-
0000481860
-
A simulated annealing approach to integrated production scheduling
-
Palmer, G.J., 1996. A simulated annealing approach to integrated production scheduling. Journal of Intelligent Manufacturing, 7 (3), 163-176.
-
(1996)
Journal of Intelligent Manufacturing
, vol.7
, Issue.3
, pp. 163-176
-
-
Palmer, G.J.1
-
31
-
-
15344338961
-
Two ant-colony algorithms for minimizing total flowtime in permutation flowshops
-
DOI 10.1016/j.cie.2004.12.009, PII S0360835204001913, Selected Papers from the 30th International Conference on Computers and Industrial Engineering
-
Rajendran, C. and Ziegler, H., 2005. Two ant-colony algorithms for minimizing total flowtime in permutation flowshops. Computers & Industrial Engineering, 48 (4), 789-797. (Pubitemid 40391497)
-
(2005)
Computers and Industrial Engineering
, vol.48
, Issue.4
, pp. 789-797
-
-
Rajendran, C.1
Ziegler, H.2
-
32
-
-
6944224399
-
Dissimilarity maximization method for real-time routing of parts in random flexible manufacturing systems
-
Saygin, C. and Kilic, S.E., 2004. Dissimilarity maximization method for real-time routing of parts in random flexible manufacturing systems. International Journal of Flexible Manufacturing Systems, 16 (2), 169-182.
-
(2004)
International Journal of Flexible Manufacturing Systems
, vol.16
, Issue.2
, pp. 169-182
-
-
Saygin, C.1
Kilic, S.E.2
-
33
-
-
0030241347
-
Process plan selection based on product mix and production volume
-
Seo, Y. and Egbelu, P.J., 1996. Process plan selection based on product mix and production volume. International Journal of Production Research, 34 (9), 2639-2655. (Pubitemid 126519797)
-
(1996)
International Journal of Production Research
, vol.34
, Issue.9
, pp. 2639-2655
-
-
Seo, Y.1
Egbelu, P.J.2
-
34
-
-
6344253119
-
Application of ant colony optimization for no-wait flowshop scheduling problem to minimize the total completion time
-
Shyu, S.J., Lin, B.M.T., and Yin, P.Y., 2004. Application of ant colony optimization for no-wait flowshop scheduling problem to minimize the total completion time. Computers & Industrial Engineering, 47 (2-3), 181-193.
-
(2004)
Computers & Industrial Engineering
, vol.47
, Issue.2-3
, pp. 181-193
-
-
Shyu, S.J.1
Lin, B.M.T.2
Yin, P.Y.3
-
35
-
-
0024175169
-
Process planning and scheduling - A method of integration for productivity improvement
-
Sundaram, R.M. and Fu, S.S., 1988. Process planning and scheduling - A method of integration for productivity improvement. Computers & Industrial Engineering, 15 (1-4), 296-301.
-
(1988)
Computers & Industrial Engineering
, vol.15
, Issue.1-4
, pp. 296-301
-
-
Sundaram, R.M.1
Fu, S.S.2
-
36
-
-
10444253903
-
Reactive multi-agent system for assembly cell control
-
Tang, H.P. and Wong, T.N., 2005. Reactive multi-agent system for assembly cell control. Robotics and Computer-Integrated Manufacturing, 21 (2), 87-98.
-
(2005)
Robotics and Computer-Integrated Manufacturing
, vol.21
, Issue.2
, pp. 87-98
-
-
Tang, H.P.1
Wong, T.N.2
-
37
-
-
0141885118
-
Negotiation-based routing in job shops via collaborative agents
-
Usher, J.M., 2003. Negotiation-based routing in job shops via collaborative agents. Journal of Intelligent Manufacturing, 14 (5), 485-499.
-
(2003)
Journal of Intelligent Manufacturing
, vol.14
, Issue.5
, pp. 485-499
-
-
Usher, J.M.1
-
38
-
-
27944463574
-
Optimal process planning for a combined punch-and-laser cutting machine using ant colony optimization
-
DOI 10.1080/00207540500070376
-
Wang, G.G. and Xie, S.Q., 2005. Optimal process planning for a combined punch-and-laser cutting machine using ant colony optimization. International Journal of Production Research, 43 (11), 2195-2216. (Pubitemid 41663546)
-
(2005)
International Journal of Production Research
, vol.43
, Issue.11
, pp. 2195-2216
-
-
Wang, G.G.1
Xie, S.Q.2
-
39
-
-
0033341387
-
Scheduling with alternatives: A link between process planning and scheduling
-
DOI 10.1023/A:1007683710427
-
Weintraub, A., et al., 1999. Scheduling with alternatives: a link between process planning and scheduling. IIE Transactions, 31 (11), 1093-1102. (Pubitemid 30523918)
-
(1999)
IIE Transactions (Institute of Industrial Engineers)
, vol.31
, Issue.11
, pp. 1093-1102
-
-
Weintraub, A.1
Cormier, D.2
Hodgson, T.3
King, R.4
Wilson, J.5
Zozom, A.6
-
40
-
-
32644476109
-
An agent-based negotiation approach to integrate process planning and scheduling
-
DOI 10.1080/00207540500409723, PII U775X356952466
-
Wong, T.N., et al., 2006a. An agent-based negotiation approach to integrate process planning and scheduling. International Journal of Production Research, 44 (7), 1331-1351. (Pubitemid 43245719)
-
(2006)
International Journal of Production Research
, vol.44
, Issue.7
, pp. 1331-1351
-
-
Wong, T.N.1
Leung, C.W.2
Mak, K.L.3
Fung, R.Y.K.4
-
41
-
-
33744827670
-
Dynamic shopfloor scheduling in multi-agent manufacturing systems
-
DOI 10.1016/j.eswa.2005.09.073, PII S0957417405002629
-
Wong, T.N., et al., 2006b. Dynamic shopfloor scheduling in multi-agent manufacturing systems. Expert Systems with Applications, 31 (3), 486-494. (Pubitemid 43831628)
-
(2006)
Expert Systems with Applications
, vol.31
, Issue.3
, pp. 486-494
-
-
Wong, T.N.1
Leung, C.W.2
Mak, K.L.3
Fung, R.Y.K.4
-
42
-
-
0242269797
-
Integration of process planning and scheduling by exploring the flexibility of process planning
-
Zhang, Y.F., Saravanan, A.N., and Fuh, J.Y.H., 2003. Integration of process planning and scheduling by exploring the flexibility of process planning. International Journal of Production Research, 41 (3), 611-628.
-
(2003)
International Journal of Production Research
, vol.41
, Issue.3
, pp. 611-628
-
-
Zhang, Y.F.1
Saravanan, A.N.2
Fuh, J.Y.H.3
|