메뉴 건너뛰기




Volumn , Issue , 2010, Pages

Dynamic economic dispatch with generator's feasible operation region

Author keywords

Dynamic economic load dispatch; Feasible operation region; Ramp rate limit

Indexed keywords

DYNAMIC ECONOMIC DISPATCH; ECONOMIC LOAD DISPATCH; GENERATING UNIT; GENERATOR SYSTEMS; RAMP RATE CONSTRAINTS; RAMP RATE LIMIT; RAMP RATE LIMITS; RAMP RATES; SUPPLY-DEMAND BALANCES;

EID: 84868193249     PISSN: 21574839     EISSN: 21574847     Source Type: Conference Proceeding    
DOI: 10.1109/APPEEC.2010.5448180     Document Type: Conference Paper
Times cited : (3)

References (10)
  • 1
    • 0019080510 scopus 로고
    • Dynamic economic dispatch of generation
    • Nov.
    • D. W. Ross and S. Kim, "Dynamic economic dispatch of generation," IEEE Trans. on Power Apparatus and Systems, vol. PAS-99, no. 6, pp. 2060-2068, Nov. 1980.
    • (1980) IEEE Trans. on Power Apparatus and Systems , vol.PAS-99 , Issue.6 , pp. 2060-2068
    • Ross, D.W.1    Kim, S.2
  • 2
    • 0020091778 scopus 로고
    • Spinning reserve constrained static and dynamic economic dispatch
    • Feb.
    • W. G. Wood, "Spinning reserve constrained static and dynamic economic dispatch," IEEE Trans. on Power Apparatus and Systems, vol. PAS-101, no. 2, pp. 381-388, Feb. 1982.
    • (1982) IEEE Trans. on Power Apparatus and Systems , vol.PAS-101 , Issue.2 , pp. 381-388
    • Wood, W.G.1
  • 3
    • 0028480910 scopus 로고
    • Price-based ramp-rate model for dynamic dispatch and unit commitment
    • Aug.
    • F. N. Lee, L. Lemonidis, and K. C. Liu, "Price-based ramp-rate model for dynamic dispatch and unit commitment," IEEE Trans. on Power Systems, vol. 9, no. 3, pp. 1233-1242, Aug. 1994.
    • (1994) IEEE Trans. on Power Systems , vol.9 , Issue.3 , pp. 1233-1242
    • Lee, F.N.1    Lemonidis, L.2    Liu, K.C.3
  • 4
    • 0025385333 scopus 로고
    • Application of linear programming redispatch technique to dynamic generation allocation
    • Feb.
    • C. B. Somuah and N. Khunaizi, "Application of linear programming redispatch technique to dynamic generation allocation," IEEE Trans. on Power Systems, vol. 5, no. 1, pp. 20-26, Feb. 1990.
    • (1990) IEEE Trans. on Power Systems , vol.5 , Issue.1 , pp. 20-26
    • Somuah, C.B.1    Khunaizi, N.2
  • 5
    • 0031143248 scopus 로고    scopus 로고
    • Dynamic economic dispatch using the extended security constrained economic dispatch algorithm
    • May
    • W. R. Barcelo and P. Rastgoufard, "Dynamic economic dispatch using the extended security constrained economic dispatch algorithm," IEEE Trans. on Power Systems, vol. 12, no. 2, pp. 961-967, May 1997.
    • (1997) IEEE Trans. on Power Systems , vol.12 , Issue.2 , pp. 961-967
    • Barcelo, W.R.1    Rastgoufard, P.2
  • 6
    • 0031996509 scopus 로고    scopus 로고
    • Economic dispatch with network and ramping constrained via interior point methods
    • Feb.
    • G. Irisarri, L. M. Kimball, K. A. Clements, A. Bagchi, and P. W. Davis, "Economic dispatch with network and ramping constrained via interior point methods," IEEE Trans. on Power Systems., vol. 13, no. 1, pp. 236-242, Feb. 1998.
    • (1998) IEEE Trans. on Power Systems , vol.13 , Issue.1 , pp. 236-242
    • Irisarri, G.1    Kimball, L.M.2    Clements, K.A.3    Bagchi, A.4    Davis, P.W.5
  • 7
    • 0027647348 scopus 로고
    • Effects of ramp-rate limits on unit commitment and economic dispatch
    • pp. 1341-1350, Aug.
    • C. Wang and M. Shahidehpour, "Effects of ramp-rate limits on unit commitment and economic dispatch," IEEE Trans. on Power Systems, vol. 8, no. 3, pp. 1341-1350, pp. 1341-1350, Aug. 1993.
    • (1993) IEEE Trans. on Power Systems , vol.8 , Issue.3 , pp. 1341-1350
    • Wang, C.1    Shahidehpour, M.2
  • 8
    • 0035248330 scopus 로고    scopus 로고
    • Dynamic economic dispatch: Feasible and optimal solutions
    • Feb.
    • X. S. Han, H. B. Gooi, D. S. Kirschen, "Dynamic economic dispatch: feasible and optimal solutions," IEEE Trans. on Power Systems, vol. 16, no. 1, pp. 22-28, Feb. 2001.
    • (2001) IEEE Trans. on Power Systems , vol.16 , Issue.1 , pp. 22-28
    • Han, X.S.1    Gooi, H.B.2    Kirschen, D.S.3
  • 9
    • 24944481717 scopus 로고    scopus 로고
    • Reserve Constrained Dynamic Dispatch of Units with Valve-Point Effects
    • Aug.
    • T. A. A. Victoire and A. E. Jeyakumar, "Reserve Constrained Dynamic Dispatch of Units With Valve-Point Effects," IEEE Trans. on Power Systems, vol. 20, no. 3, pp. 1273-1282, Aug. 2005.
    • (2005) IEEE Trans. on Power Systems , vol.20 , Issue.3 , pp. 1273-1282
    • Victoire, T.A.A.1    Jeyakumar, A.E.2
  • 10
    • 4043130848 scopus 로고    scopus 로고
    • A fuzzy-optimization approach to dynamic economic dispatch considering uncertainties
    • Aug.
    • P. Attaviriyanupap, H. Kita, E. Tanaka, J. Hasegawa, "A fuzzy-optimization approach to dynamic economic dispatch considering uncertainties," IEEE Trans. on Power Systems, vol. 19, no. 3, pp. 1299-1307, Aug. 2004.
    • (2004) IEEE Trans. on Power Systems , vol.19 , Issue.3 , pp. 1299-1307
    • Attaviriyanupap, P.1    Kita, H.2    Tanaka, E.3    Hasegawa, J.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.