1
-
-
78751561993
-
Large scale integration of wind power: Moderating thermal power plant cycling
-
L. Göransson and F. Johnsson, "Large scale integration of wind power: Moderating thermal power plant cycling Wind Energy, vol. 14, no. 1, pp. 91-105, 2011.
-
(2011)
Wind Energy
, vol.14
, Issue.1
, pp. 91-105
-
-
Göransson, L.1
Johnsson, F.2
-
2
-
-
77951667398
-
Base-load cycling on a system with significant wind penetration
-
May
-
N. Troy, E. Denny, and M. O'Malley, "Base-load cycling on a system with significant wind penetration IEEE Trans. Power Syst., vol. 25, no. 2, pp. 1088-1097, May 2010.
-
(2010)
IEEE Trans. Power Syst
, vol.25
, Issue.2
, pp. 1088-1097
-
-
Troy, N.1
Denny, E.2
O'Malley, M.3
-
3
-
-
84867982270
-
Damage to power plants due to cycling
-
Damage to Power Plants Due to Cycling, EPRI. Palo Alto, CA, 2001.
-
(2001)
EPRI Palo Alto, CA
-
-
-
4
-
-
0028480021
-
Ramp-rate limits in unit commitment and economic dispatch incorporating rotor fatigue effect
-
Aug
-
C. Wang and S. M. Shahidehpour, "Ramp-rate limits in unit commitment and economic dispatch incorporating rotor fatigue effect IEEE Trans. Power Syst., vol. 9, no. 3, pp. 1539-1545, Aug. 1994.
-
(1994)
IEEE Trans. Power Syst
, vol.9
, Issue.3
, pp. 1539-1545
-
-
Wang, C.1
Shahidehpour, S.M.2
-
5
-
-
0028369582
-
Thermal stress computation for steam-electric generator dispatch
-
Feb
-
J. K. Delson, "Thermal stress computation for steam-electric generator dispatch IEEE Trans. Power Syst., vol. 9, no. 1, pp. 120-127, Feb. 1994.
-
(1994)
IEEE Trans. Power Syst
, vol.9
, Issue.1
, pp. 120-127
-
-
Delson, J.K.1
-
6
-
-
84867982265
-
Editorial Profitable operation requires knowing how much it costs to cycle your unit
-
[Online]. Available
-
Editorial, "Profitable operation requires knowing how much it costs to cycle your unit Combined Cycle J. Spring, 2004. [Online]. Available: http://www.combinedcyclejournal.com.
-
(2004)
Combined Cycle J Spring
-
-
-
7
-
-
77951666040
-
Profitable operation requires knowing how much it costs to cycle your unit
-
Second Quarter
-
S. Lefton, "Profitable operation requires knowing how much it costs to cycle your unit Combined Cycle J., pp. 49-52, Second Quarter, 2004.
-
(2004)
Combined Cycle J
, pp. 49-52
-
-
Lefton, S.1
-
8
-
-
77951667978
-
Optimizing power plant cycling operations while reducing generating plant damage and costs at the irish electricity supply board
-
S. Lefton, P. Besuner, P. Grimsrud, A. Bissel, and G. Norman, Optimizing Power Plant Cycling Operations While Reducing Generating Plant Damage and Costs at the Irish Electricity Supply Board, Aptech Engineering Service, Sunnyvale, CA, Tech. Rep. 123, 1998.
-
(1998)
Aptech Engineering Service, Sunnyvale, CA, Tech Rep
, vol.123
-
-
Lefton, S.1
Besuner, P.2
Grimsrud, P.3
Bissel, A.4
Norman, G.5
-
9
-
-
84867989237
-
Determining the cost of cycling and varied load operations: Methodology
-
Determining the Cost of Cycling and Varied Load Operations:Methodology, EPRI. Palo Alto, CA, 2002, 1004412.
-
(2002)
EPRI Palo Alto, CA
, pp. 1004412
-
-
-
10
-
-
84867982266
-
Correlating cycle dutyWith cost at fossil fuel power plants
-
Correlating Cycle DutyWith Cost at Fossil Fuel Power Plants, EPRI. Palo Alto, CA, 2001, 1004010.
-
(2001)
EPRI Palo Alto, CA
, pp. 1004010
-
-
-
11
-
-
33747623533
-
A computationally efficient mixed-integer linear formulation for the thermal unit commitment problem
-
DOI 10.1109/TPWRS.2006.876672
-
M. Carrion and J. M. Arroyo, "A computationally efficient mixedinteger linear formulation for the unit commitment problem IEEE Trans. Power Syst., vol. 21, no. 3, pp. 1371-1378, Aug. 2006. (Pubitemid 44263531)
-
(2006)
IEEE Transactions on Power Systems
, vol.21
, Issue.3
, pp. 1371-1378
-
-
Carrion, M.1
Arroyo, J.M.2
-
12
-
-
0034244118
-
Optimal response of a thermal unit to an electricity spot market
-
Aug
-
J. M. Arroyo and A. J. Conejo, "Optimal response of a thermal unit to an electricity spot market IEEE Trans. Power Syst., vol. 15, no. 3, pp. 1098-1104, Aug. 2000.
-
(2000)
IEEE Trans. Power Syst
, vol.15
, Issue.3
, pp. 1098-1104
-
-
Arroyo, J.M.1
Conejo, A.J.2
-
13
-
-
0030082567
-
A genetic algorithm solution to the unit commitment problem
-
S. A. Kazarlis, A. G. Bakirtzis, and V. Petridis, "A genetic algorithm solution to the unit commitment problem IEEE Trans. Power Syst., vol. 11, no. 1, pp. 83-92, Feb. 1996. (Pubitemid 126781131)
-
(1996)
IEEE Transactions on Power Systems
, vol.11
, Issue.1
, pp. 83-92
-
-
Kazarlis, S.A.1
Bakirtzis, A.G.2
Petridis, V.3
-
14
-
-
84867983829
-
The real cost of on/off cycling
-
S. Lefton, P. Besuner, and D. D. Agan, "The real cost of on/off cycling Modern Power Syst., vol. 26, no. 10, 2006.
-
(2006)
Modern Power Syst
, vol.26
, Issue.10
-
-
Lefton, S.1
Besuner, P.2
Agan, D.D.3
|