메뉴 건너뛰기




Volumn 42, Issue 6, 2012, Pages 1042-1053

A novel approach to optimization of refining schedules for crude oil operations in refinery

Author keywords

Crude oil operations; linear programming; short term scheduling; transportation problem

Indexed keywords

COMBINATORIAL PROBLEM; CONTROL PERSPECTIVE; INDUSTRIAL CASE STUDY; LINEAR PROGRAMMING PROBLEM; OIL OPERATIONS; PRODUCTION RATES; SHORT-TERM SCHEDULING; TRANSPORTATION PROBLEM;

EID: 84867884609     PISSN: 10946977     EISSN: None     Source Type: Journal    
DOI: 10.1109/TSMCC.2012.2185226     Document Type: Article
Times cited : (35)

References (40)
  • 1
    • 84867878207 scopus 로고
    • (Process Industry Modeling System) User's manual, Version 6.0, Bechtel Corp., Houston, TX
    • PIMS (Process Industry Modeling System) User's manual, Version 6.0, Bechtel Corp., Houston, TX, 1993.
    • (1993) PIMS
  • 2
    • 2442583184 scopus 로고    scopus 로고
    • Continuous-time versus discrete-time approaches for scheduling of chemical processes: A review
    • DOI 10.1016/j.compchemeng.2004.05.002, PII S0098135404001401
    • C. A. Floudas and X. Lin, "Continuous-time versus discrete-time approaches for scheduling of chemical processes:Areview," Comput.Chem. Eng., vol. 28, pp. 2109-2129, 2004. (Pubitemid 39094063)
    • (2004) Computers and Chemical Engineering , vol.28 , Issue.11 , pp. 2109-2129
    • Floudas, C.A.1    Lin, X.2
  • 3
    • 34447327533 scopus 로고    scopus 로고
    • Formal representation of meta-operation of chemical plants
    • Jul.
    • H. A. Gabbar, "Formal representation of meta-operation of chemical plants," IEEE Trans. Syst., Man, Cybern. C, Appl. Rev., vol. 37, no. 4, pp. 633-641, Jul. 2007.
    • (2007) IEEE Trans. Syst., Man, Cybern. C, Appl. Rev. , vol.37 , Issue.4 , pp. 633-641
    • Gabbar, H.A.1
  • 5
    • 0035340218 scopus 로고    scopus 로고
    • Short-term scheduling and recipe optimization of blending processes
    • K. Glismann and G. Gruhn, "Short-term scheduling and recipe optimization of blending processes," Comput. Chem. Eng., vol. 25, pp. 627-634, 2001.
    • (2001) Comput. Chem. Eng. , vol.25 , pp. 627-634
    • Glismann, K.1    Gruhn, G.2
  • 6
    • 0032216021 scopus 로고    scopus 로고
    • Effective continuous-time formulation for short-term scheduling. 1. Multipurpose batch processes
    • M. G. Ierapetritou and C. A. Floudas, "Effective continuous-time formulation for short-term scheduling, 1. Multipurpose batch processes," Ind. Eng. Chem. Res., vol. 37, pp. 4341-4359, 1998. (Pubitemid 29144956)
    • (1998) Industrial and Engineering Chemistry Research , vol.37 , Issue.11 , pp. 4341-4359
    • Ierapetritou, M.G.1    Floudas, C.A.2
  • 7
    • 0032216046 scopus 로고    scopus 로고
    • Effective continuous-time formulation for short-term scheduling. 2. Continuous and semicontinuous processes
    • M. G. Ierapetritou and C. A. Floudas, "Effective continuous-time formulation for short-term scheduling, 2. continuous and semicontinuous processes," Ind. Eng. Chem. Res., vol. 37, pp. 4360-4374, 1998. (Pubitemid 29144957)
    • (1998) Industrial and Engineering Chemistry Research , vol.37 , Issue.11 , pp. 4360-4374
    • Ierapetritou, M.G.1    Floudas, C.A.2
  • 8
    • 0038310819 scopus 로고    scopus 로고
    • Refinery short-term scheduling using continuous time formulation: Crude-oil operations
    • Z. Jia, M. Ierapetritou, and J. D. Kelly, "Refinery short-term scheduling using continuous time formation: Crude oil operations," Ind. Eng. Chem. Res., vol. 42, pp. 3085-3097, 2003. (Pubitemid 36736686)
    • (2003) Industrial and Engineering Chemistry Research , vol.42 , Issue.13 , pp. 3085-3097
    • Jia, Z.1    Ierapetritou, M.2    Kelly, J.D.3
  • 9
    • 1942532285 scopus 로고    scopus 로고
    • Efficient short-term scheduling of refinery operations based on a continuous time formulation
    • DOI 10.1016/j.compchemeng.2003.09.007, PII S0098135403002394
    • Z. Jia and M. Ierapetritou, "Efficient short-term scheduling of refinery operations based on a continuous time formulation," Comput. Chem. Eng., vol. 28, pp. 1001-1019, 2004. (Pubitemid 38520956)
    • (2004) Computers and Chemical Engineering , vol.28 , Issue.6-7 , pp. 1001-1019
    • Jia, Z.1    Ierapetritou, M.2
  • 10
    • 50549096839 scopus 로고    scopus 로고
    • Global optimization for scheduling refinery crude oil operations
    • R. Karuppiah, K. C. Furmanb, and I. E. Grossmann, "Global optimization for scheduling refinery crude oil operations," Comput. Chem. Eng., vol. 32, pp. 2745-2766, 2008.
    • (2008) Comput. Chem. Eng. , vol.32 , pp. 2745-2766
    • Karuppiah, R.1    Furmanb, K.C.2    Grossmann, I.E.3
  • 11
    • 0030151372 scopus 로고    scopus 로고
    • Mixed-integer linear programming model for refinery short-term scheduling of crude oil unloading with inventory management
    • H. Lee, J. M. Pinto, I. E. Grossmann, and S. Park, "Mixed integer linear programming model for refinery short-term scheduling of crude oil unloading with inventory management," Ind. Eng. Chem. Res., vol. 35, pp. 1630-1641, 1996. (Pubitemid 126467230)
    • (1996) Industrial and Engineering Chemistry Research , vol.35 , Issue.5 , pp. 1630-1641
    • Lee, H.1    Pinto, J.M.2    Grossmann, I.E.3    Park, S.4
  • 12
    • 0742319169 scopus 로고    scopus 로고
    • An efficient genetic algorithm for job shop scheduling with tardiness objectives
    • D. C. Mattfeld and C. Bierwirth, "An efficient genetic algorithm for job shop scheduling with tardiness objectives," Eur. J. Oper. Res., vol. 155, no. 2, pp. 616-630, 2004.
    • (2004) Eur. J. Oper. Res. , vol.155 , Issue.2 , pp. 616-630
    • Mattfeld, D.C.1    Bierwirth, C.2
  • 13
    • 0037093434 scopus 로고    scopus 로고
    • An efficient MILP continuous-time formulation for short-term scheduling of multiproduct continuous facilities
    • DOI 10.1016/S0098-1354(01)00789-X, PII S009813540100789X
    • C. A. Mendez and J. Cerda, "An efficient MILP continuous time formulation for short-term scheduling of multiproduct continuous facilities," Comput. Chem. Eng., vol. 26, pp. 687-695, 2002. (Pubitemid 34552720)
    • (2002) Computers and Chemical Engineering , vol.26 , Issue.4-5 , pp. 687-695
    • Mendez, C.A.1    Cerda, J.2
  • 14
    • 0042807254 scopus 로고    scopus 로고
    • Dynamic scheduling in multiproduct batch plants
    • DOI 10.1016/S0098-1354(03)00050-4
    • C. A. Mendez and J. Cerda, "Dynamic scheduling in multiproduct batch plants," Comput. Chem. Eng., vol. 27, pp. 1247-1259, 2003. (Pubitemid 36897199)
    • (2003) Computers and Chemical Engineering , vol.27 , Issue.8-9 , pp. 1247-1259
    • Mendez, C.A.1    Cerda, J.2
  • 15
    • 33344469706 scopus 로고    scopus 로고
    • A simultaneous optimization approach for off-line blending and scheduling of oil-refinery operations
    • DOI 10.1016/j.compchemeng.2005.11.004, PII S0098135405002966
    • C. A. Mendez, I. E. Grossmann, I. Harjunkoski, and P. Kabore, "A simultaneous optimization approach for off-line blending and scheduling of oil-refinery operations," Comput. Chem. Eng., vol. 30, no. 4, pp. 614-634, 2006. (Pubitemid 43289119)
    • (2006) Computers and Chemical Engineering , vol.30 , Issue.4 , pp. 614-634
    • Mendez, C.A.1    Grossmann, I.E.2    Harjunkoski, I.3    Kabore, P.4
  • 16
    • 0042306174 scopus 로고    scopus 로고
    • Process technology in the petroleum industry-Current situation and future trends
    • L. F. L. Moro, "Process technology in the petroleum industry-Current situation and future trends," Comput. Chem. Eng., vol. 27, pp. 1303-1305, 2003.
    • (2003) Comput. Chem. Eng. , vol.27 , pp. 1303-1305
    • Moro, L.F.L.1
  • 17
    • 0030191906 scopus 로고    scopus 로고
    • Refinery operation and control: A future vision
    • R. Pelham and C. Pharris, "Refinery operation and control: A future vision," Hydrocarbon Process., vol. 75, no. 7, pp. 89-94, 1996.
    • (1996) Hydrocarbon Process. , vol.75 , Issue.7 , pp. 89-94
    • Pelham, R.1    Pharris, C.2
  • 18
    • 0030713544 scopus 로고    scopus 로고
    • A logic-based approach to scheduling problem with resource constraints
    • J. M. Pinto and I. E. Grossmann, "A logic-based approach to scheduling problem with resource constraints," Comput. Chem. Eng., vol. 21, pp. 801-818, 1997.
    • (1997) Comput. Chem. Eng. , vol.21 , pp. 801-818
    • Pinto, J.M.1    Grossmann, I.E.2
  • 19
    • 0034287620 scopus 로고    scopus 로고
    • Planning and scheduling models for refinery operations
    • J. M. Pinto, M. Joly, and L. F. L. Moro, "Planning and scheduling models for refinery operations," Comput. Chem. Eng., vol. 24, pp. 2259-2276, 2000.
    • (2000) Comput. Chem. Eng. , vol.24 , pp. 2259-2276
    • Pinto, J.M.1    Joly, M.2    Moro, L.F.L.3
  • 20
    • 0033339182 scopus 로고    scopus 로고
    • Simulated annealing algorithm for job shop scheduling
    • S. G. Ponnambalam, N. Jawahar, and P. Aravindan, "A simulated annealing algorithm for job shop scheduling," Prod. Planning Control, vol. 10, no. 8, pp. 767-777, 1999. (Pubitemid 30512782)
    • (1999) Production Planning and Control , vol.10 , Issue.8 , pp. 767-777
    • Ponnambalam, S.G.1    Jawahar, N.2    Aravindan, P.3
  • 21
    • 0041805289 scopus 로고    scopus 로고
    • Scheduling of a multiproduct pipeline system
    • DOI 10.1016/S0098-1354(03)00049-8
    • R. Rejowski and J. M. Pinto, "Scheduling of a multiproduct pipeline system," Comput. Chem. Eng., vol. 27, no. 8-9, pp. 1229-1246, 2003. (Pubitemid 36897198)
    • (2003) Computers and Chemical Engineering , vol.27 , Issue.8-9 , pp. 1229-1246
    • Rejowski Jr., R.1    Pinto, J.M.2
  • 22
    • 0033357382 scopus 로고    scopus 로고
    • Job shop scheduling with beam search
    • DOI 10.1016/S0377-2217(98)00319-1
    • I. Sabuncuoglu and M. Bayiz, "Job shop scheduling with beam search," Eur. J. Oper. Res., vol. 118, no. 2, pp. 390-412, 1999. (Pubitemid 30504873)
    • (1999) European Journal of Operational Research , vol.118 , Issue.2 , pp. 390-412
    • Sabuncuoglu, I.1    Bayiz, M.2
  • 23
    • 66849129512 scopus 로고    scopus 로고
    • Scheduling of loading and unloading of crude oil in a refinery using event-based discrete time formulation
    • G. K. D. Saharidisa, M. Minouxb, and Y. Dallery, "Scheduling of loading and unloading of crude oil in a refinery using event-based discrete time formulation," Comput. Chem. Eng., vol. 33, pp. 1413-1426, 2009.
    • (2009) Comput. Chem. Eng. , vol.33 , pp. 1413-1426
    • Saharidisa, G.K.D.1    Minouxb, M.2    Dallery, Y.3
  • 24
    • 0029701808 scopus 로고    scopus 로고
    • Mathematical programming techniques for crude oil scheduling
    • N. Shah, "Mathematical programming techniques for crude oil scheduling," Comput. Chem. Eng., vol. 20, pp. S1227-S1232, 1996. (Pubitemid 126653564)
    • (1996) Computers and Chemical Engineering , vol.20 , Issue.SUPPL.2
    • Shah, N.1
  • 25
    • 71549139151 scopus 로고    scopus 로고
    • Centralizeddecentralized optimization for refinery scheduling
    • N. Shah, G. K. D. Saharidis, Z. Jia, and M. G. Ierapetritou, "Centralizeddecentralized optimization for refinery scheduling," Comput. Chem. Eng., vol. 33, pp. 2091-2105, 2009.
    • (2009) Comput. Chem. Eng. , vol.33 , pp. 2091-2105
    • Shah, N.1    Saharidis, G.K.D.2    Jia, Z.3    Ierapetritou, M.G.4
  • 26
    • 0034661457 scopus 로고    scopus 로고
    • Planning, scheduling and control systems: Why can they not work together
    • D. E. Shobrys andD.C.White, "Planning, scheduling and control systems: Why can they not work together," Comput. Chem. Eng., vol. 24, pp. 63-173, 2000.
    • (2000) Comput. Chem. Eng. , vol.24 , pp. 63-173
    • Shobrys, D.E.1    White, D.C.2
  • 27
    • 34548116204 scopus 로고    scopus 로고
    • Short-term scheduling for refinery process: Bridging the gap between theory and applications
    • Jun.
    • N. Q. Wu, M. C. Zhou, and F. Chu, "Short-term scheduling for refinery process: Bridging the gap between theory and applications," Int. J. Intell. Control Syst., vol. 10, no. 2, pp. 162-174, Jun. 2005.
    • (2005) Int. J. Intell. Control Syst. , vol.10 , Issue.2 , pp. 162-174
    • Wu, N.Q.1    Zhou, M.C.2    Chu, F.3
  • 28
    • 54849159400 scopus 로고    scopus 로고
    • A Petri net based heuristic algorithm for realizability of target refining schedule for oil refinery
    • Oct.
    • N. Q.Wu, M. C. Zhou, and F. Chu, "A Petri net based heuristic algorithm for realizability of target refining schedule for oil refinery," IEEE Trans. Autom. Sci. Eng., vol. 5, no. 4, pp. 661-676, Oct. 2008.
    • (2008) IEEE Trans. Autom. Sci. Eng. , vol.5 , Issue.4 , pp. 661-676
    • Wu, N.Q.1    Zhou, M.C.2    Chu, F.3
  • 29
    • 56049106348 scopus 로고    scopus 로고
    • Short-term schedulability analysis of crude oil operations in refinery with oil residency time constraint using Petri net
    • Nov.
    • N. Q.Wu, F. Chu, C. B. Chu, and M. C. Zhou, "Short-term schedulability analysis of crude oil operations in refinery with oil residency time constraint using Petri net," IEEE Trans. Syst., Man, Cybern. C, Appl. Rev., vol. 38, no. 6, pp. 765-778, Nov. 2008.
    • (2008) IEEE Trans. Syst., Man, Cybern. C, Appl. Rev. , vol.38 , Issue.6 , pp. 765-778
    • Wu, N.Q.1    Chu, F.2    Chu, C.B.3    Zhou, M.C.4
  • 30
    • 58649115610 scopus 로고    scopus 로고
    • Short-term schedulability analysis of multiple distiller crude oil operations in refinery with oil residency time constraint
    • Jan.
    • N. Q.Wu, F. Chu, C. B. Chu, and M. C. Zhou, "Short-term schedulability analysis of multiple distiller crude oil operations in refinery with oil residency time constraint," IEEE Trans. Syst., Man, Cybern. C, Appl. Rev., vol. 39, no. 1, pp. 1-16, Jan. 2009.
    • (2009) IEEE Trans. Syst., Man, Cybern. C, Appl. Rev. , vol.39 , Issue.1 , pp. 1-16
    • Wu, N.Q.1    Chu, F.2    Chu, C.B.3    Zhou, M.C.4
  • 31
    • 77249123833 scopus 로고    scopus 로고
    • Hybrid Petri net modeling and schedulability analysis of high fusion point oil transportation under tank grouping strategy for crude oil operations in refinery
    • Mar.
    • N. Q.Wu, F. Chu, C. B. Chu, andM. C. Zhou, "Hybrid Petri net modeling and schedulability analysis of high fusion point oil transportation under tank grouping strategy for crude oil operations in refinery," IEEE Trans. Syst., Man, Cybern. C, Appl. Rev., vol. 40, no. 2, pp. 159-175, Mar. 2010.
    • (2010) IEEE Trans. Syst., Man, Cybern. C, Appl. Rev. , vol.40 , Issue.2 , pp. 159-175
    • Wu, N.Q.1    Chu, F.2    Chu, C.B.3    Zhou, M.C.4
  • 32
    • 77649341847 scopus 로고    scopus 로고
    • Tank cycling and scheduling analysis of high fusion point oil transportation for crude oil operations in refinery
    • N. Q.Wu, F. Chu, C. B. Chu, andM. C. Zhou, "Tank cycling and scheduling analysis of high fusion point oil transportation for crude oil operations in refinery," Comput. Chem. Eng., vol. 34, no. 4, pp. 529-543, 2010.
    • (2010) Comput. Chem. Eng. , vol.34 , Issue.4 , pp. 529-543
    • Wu, N.Q.1    Chu, F.2    Chu, C.B.3    Zhou, M.C.4
  • 33
    • 78651081151 scopus 로고    scopus 로고
    • Schedulability analysis of short-term scheduling for crude oil operations in refinerywith oil residency time and charging-tank-switch-overlap constraints
    • Jan.
    • N. Q.Wu, C. B. Chu, F. Chu, andM. C. Zhou, "Schedulability analysis of short-term scheduling for crude oil operations in refinerywith oil residency time and charging-tank-switch-overlap constraints," IEEE Trans. Autom. Sci. Eng., vol. 8, no. 1, pp. 190-204, Jan. 2011.
    • (2011) IEEE Trans. Autom. Sci. Eng. , vol.8 , Issue.1 , pp. 190-204
    • Wu, N.Q.1    Chu, C.B.2    Chu, F.3    Zhou, M.C.4
  • 34
    • 0035452563 scopus 로고    scopus 로고
    • A newadaptive neural network and heuristics hybrid approach for job-shop scheduling
    • S. X.Yang andD.W.Wang, "A newadaptive neural network and heuristics hybrid approach for job-shop scheduling," Comput. Oper. Res., vol. 28, no. 10, pp. 955-971, 2001.
    • (2001) Comput. Oper. Res. , vol.28 , Issue.10 , pp. 955-971
    • Yang, S.X.1    Wang, D.W.2
  • 39
    • 0032141060 scopus 로고    scopus 로고
    • Modeling, analysis, simulation, scheduling, and control of semiconductor manufacturing systems: A petri net approach
    • PII S089465079805876X
    • M. C. Zhou and M. D. Jeng, "Modeling, analysis, simulation, scheduling, and control of semiconductor manufacturing systems: A Petri net approach," IEEE Trans. Semiconductor Manuf., vol. 11, no. 3, pp. 333-357, 1998. (Pubitemid 128742374)
    • (1998) IEEE Transactions on Semiconductor Manufacturing , vol.11 , Issue.3 , pp. 333-357
    • Zhou, M.1    Jeng, M.D.2
  • 40
    • 0028714917 scopus 로고
    • Petri nets and industrial applications: A Tutorial
    • Dec.
    • R. Zurawski and M. C. Zhou, "Petri nets and industrial applications: A Tutorial," IEEE Trans. Ind. Electron., vol. 41, no. 6, pp. 567-583, Dec. 1994.
    • (1994) IEEE Trans. Ind. Electron. , vol.41 , Issue.6 , pp. 567-583
    • Zurawski, R.1    Zhou, M.C.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.