메뉴 건너뛰기




Volumn 1551 LNCS, Issue , 1999, Pages 335-349

Constraint-based resource allocation and scheduling in steel manufacturing

Author keywords

Finite domain constraints; Flow maximization; Scheduling; Steel manufacturing

Indexed keywords

CONSTRAINT-BASED; FINITE DOMAIN CONSTRAINTS; GREEDY ALGORITHMS; MAXIMIZATION PROBLEM; STEEL MANUFACTURING; SUB-PROBLEMS;

EID: 84867475769     PISSN: 03029743     EISSN: 16113349     Source Type: Book Series    
DOI: None     Document Type: Conference Paper
Times cited : (2)

References (5)
  • 2
    • 0001343733 scopus 로고    scopus 로고
    • A branch & bound method for the general-shop problem with sequencing dependent setup-times
    • P. Bruckner and O. Thiele. A branch & bound method for the general-shop problem with sequencing dependent setup-times. OR Spectrum, 18:145-161, 1996.
    • (1996) OR Spectrum , vol.18 , pp. 145-161
    • Bruckner, P.1    Thiele, O.2
  • 3
    • 0000165767 scopus 로고
    • An algorithm for solving the job-shop scheduling problem
    • J. Carlier and E. Pinson. An algorithm for solving the job-shop scheduling problem. Management Science, 35(2):164-176, 1989.
    • (1989) Management Science , vol.35 , Issue.2 , pp. 164-176
    • Carlier, J.1    Pinson, E.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.