Volumn 62, Issue 5-8, 2012, Pages 759-773

The economic lot scheduling problem with deteriorating items and shortage: An imperialist competitive algorithm

Author keywords

Deterioration factor; Economic lot scheduling problem; Imperialist competitive algorithm; Shortage cost

Indexed keywords

COMPETITIVE ALGORITHMS; COMPUTATIONAL RESULTS; COMPUTATIONAL TIME; DETERIORATING ITEMS; DETERIORATION FACTOR; ECONOMIC LOT SCHEDULING PROBLEMS; HOLDING COSTS; LOT SIZING; MANUFACTURING ENVIRONMENTS; OPTIMAL BATCH SIZE; POWER-OF-TWO; REPLENISHMENT CYCLE; SCHEDULING DECISIONS; SETUP COSTS; SHORTAGE COST; THREE COMPONENT;

EID: 84867085430     PISSN: 02683768     EISSN: 14333015     Source Type: Journal    
DOI: 10.1007/s00170-011-3820-6     Document Type: Article
Times cited : (20)

References (43)
  • 1
    • 0001021905 scopus 로고    scopus 로고
    • Optimal pricing and lot-sizing under conditions of perish ability and partial backordering
    • Abad PL (1996) Optimal pricing and lot-sizing under conditions of perish ability and partial backordering. Manag Sci 42:1093-1104
    • (1996) Manag Sci , vol.42 , pp. 1093-1104
    • Abad, P.L.1
  • 2
    • 0034507540 scopus 로고    scopus 로고
    • Optimal lot size for a perishable good under conditions of finite production and partial backordering and lost sale
    • Abad PL (2000) Optimal lot size for a perishable good under conditions of finite production and partial backordering and lost sale. Comput Ind Eng 38:457-465
    • (2000) Comput Ind Eng , vol.38 , pp. 457-465
    • Abad, P.L.1
  • 3
    • 33244484571 scopus 로고    scopus 로고
    • Incorporating robustness into genetic algorithm search of stochastic simulation outputs
    • Al-Aomar R (2006) Incorporating robustness into genetic algorithm search of stochastic simulation outputs. Simulat Model Pract Theor 14:201-223
    • (2006) Simulat Model Pract Theor , vol.14 , pp. 201-223
    • Al-Aomar, R.1
  • 5
    • 0030195390 scopus 로고    scopus 로고
    • A production lot size inventory model for deteriorating items and arbitrary production and demand rates
    • Balkhi Z, Benkherouf L (1996) A production lot size inventory model for deteriorating items and arbitrary production and demand rates. Eur J Oper Res 92:302-309
    • (1996) Eur J Oper Res , vol.92 , pp. 302-309
    • Balkhi, Z.1    Benkherouf, L.2
  • 6
    • 0037334899 scopus 로고    scopus 로고
    • A framework for simulation-optimization software
    • Boesel J, Nelson BL, Ishii N (2003) A framework for simulation- optimization software. IIE Transactions 35:221-229
    • (2003) IIE Transactions , vol.35 , pp. 221-229
    • Boesel, J.1    Nelson, B.L.2    Ishii, N.3
  • 7
    • 0000326705 scopus 로고
    • A dynamic programming approach to a lot scheduling problem
    • Bomberger E (1966) A dynamic programming approach to a lot scheduling problem. Manag Sci 12:778-84
    • (1966) Manag Sci , vol.12 , pp. 778-784
    • Bomberger, E.1
  • 8
    • 70449623048 scopus 로고    scopus 로고
    • Economic lot scheduling problems incorporating a cost of using the production facility
    • Brander P, Segerstedt A (2009) Economic lot scheduling problems incorporating a cost of using the production facility. Int J Prod Res 47:3611-3624
    • (2009) Int J Prod Res , vol.47 , pp. 3611-3624
    • Brander, P.1    Segerstedt, A.2
  • 9
    • 33847643247 scopus 로고    scopus 로고
    • The economic lot scheduling problem: A pure genetic search approach
    • Chatfield DC (2007) The economic lot scheduling problem: a pure genetic search approach. Comput Oper Res 34:2865-2881
    • (2007) Comput Oper Res , vol.34 , pp. 2865-2881
    • Chatfield, D.C.1
  • 11
    • 1142268167 scopus 로고    scopus 로고
    • Finding effective schedules for the economic lot scheduling problem: A simple mixed integer programming approach
    • Cooke DL, Rohleder TR, Silver ED (2004) Finding effective schedules for the economic lot scheduling problem: a simple mixed integer programming approach. Int J Prod Res 42:21-36
    • (2004) Int J Prod Res , vol.42 , pp. 21-36
    • Cooke, D.L.1    Rohleder, T.R.2    Silver, E.D.3
  • 12
    • 0023420909 scopus 로고
    • The ELSP: Achieving feasibility using time-varying lot sizes
    • Dobson G (1987) The ELSP: achieving feasibility using time-varying lot sizes. Oper Res 35(5):764-71
    • (1987) Oper Res , vol.35 , Issue.5 , pp. 764-771
    • Dobson, G.1
  • 13
    • 0000413306 scopus 로고
    • Economic batch size determination for multiprod-uct scheduling
    • Eilon S (1958) Economic batch size determination for multiprod-uct scheduling. Oper Res Q 10:217-277
    • (1958) Oper Res Q , vol.10 , pp. 217-277
    • Eilon, S.1
  • 14
    • 0017931081 scopus 로고
    • The economic lot scheduling problem (ELSP): Review and extension
    • Elmaghraby SE (1978) The economic lot scheduling problem (ELSP): review and extension. Manag Sci 24:587-597
    • (1978) Manag Sci , vol.24 , pp. 587-597
    • Elmaghraby, S.E.1
  • 15
    • 0020781730 scopus 로고
    • Analysis of inventory system with deteriorating items
    • Elsayed EA, Teresi C (1983) Analysis of inventory system with deteriorating items. Int J Prod Res 21:449-460
    • (1983) Int J Prod Res , vol.21 , pp. 449-460
    • Elsayed, E.A.1    Teresi, C.2
  • 16
    • 0000848478 scopus 로고
    • Optimal power-of-two replenishment strategies in capacitated general production distribution networks
    • Federgruen A, Zheng YS (1993) Optimal power-of-two replenishment strategies in capacitated general production distribution networks. Manag Sci 39:710-727
    • (1993) Manag Sci , vol.39 , pp. 710-727
    • Federgruen, A.1    Zheng, Y.S.2
  • 17
    • 0027927413 scopus 로고
    • Economic lot scheduling problem with raw material considerations
    • Gallego G, Joneja D (1994) Economic lot scheduling problem with raw material considerations. Oper Res 42(1):92-101
    • (1994) Oper Res , vol.42 , Issue.1 , pp. 92-101
    • Gallego, G.1    Joneja, D.2
  • 18
    • 0001370183 scopus 로고
    • A model for an exponentially decaying inventory
    • Ghare PM, Schrader GF (1963) A model for an exponentially decaying inventory. J Ind Eng 14:238-243
    • (1963) J Ind Eng , vol.14 , pp. 238-243
    • Ghare, P.M.1    Schrader, G.F.2
  • 19
    • 0016553281 scopus 로고
    • Scheduling a multi-product single machine system-A new approach
    • Goyal SK (1975) Scheduling a multi-product single machine system-A new approach. Int J Prod Res 13:487-93
    • (1975) Int J Prod Res , vol.13 , pp. 487-493
    • Goyal, S.K.1
  • 20
    • 0025786235 scopus 로고
    • An order-level lot-size inventory model for deteriorating items with finite replenishment rate
    • Heng KJ, Labban J, Linn RJ (1991) An order-level lot-size inventory model for deteriorating items with finite replenishment rate. Comput Ind Eng 20:187-197
    • (1991) Comput Ind Eng , vol.20 , pp. 187-197
    • Heng, K.J.1    Labban, J.2    Linn, R.J.3
  • 21
    • 84867040980 scopus 로고    scopus 로고
    • The economic lot scheduling problem in flow lines with sequence-dependent setups
    • Heydari M, Torabi SA (2008) The economic lot scheduling problem in flow lines with sequence-dependent setups. World Academy of Science Eng Tech 47:2008
    • (2008) World Academy of Science Eng Tech , vol.47 , pp. 2008
    • Heydari, M.1    Torabi, S.A.2
  • 22
    • 0020587837 scopus 로고
    • On the general feasibility of scheduling lot sizes of several products on one machine
    • Hsu WL (1983) On the general feasibility of scheduling lot sizes of several products on one machine. Manag Sci 29:93-105
    • (1983) Manag Sci , vol.29 , pp. 93-105
    • Hsu, W.L.1
  • 23
    • 0032118242 scopus 로고    scopus 로고
    • Crossing over genetic algorithms: The Sugal generalized GA
    • Hunter A (1998) Crossing over genetic algorithms: the Sugal generalized GA. Journal of Heuristics 4:179-192
    • (1998) Journal of Heuristics , vol.4 , pp. 179-192
    • Hunter, A.1
  • 24
    • 0022029141 scopus 로고
    • The joint replenishment problem with a power-of-two restriction
    • Jackson PL, Maxwell WL, Muckstadt JA (1985) The joint replenishment problem with a power-of-two restriction. IIE Trans 17:25-32
    • (1985) IIE Trans , vol.17 , pp. 25-32
    • Jackson, P.L.1    Maxwell, W.L.2    Muckstadt, J.A.3
  • 25
    • 78549242535 scopus 로고    scopus 로고
    • Imperialist competitive algorithm for minimum bit error rate beamforming
    • Khabbazi A, Atashpaz E, Lucas C (2009) Imperialist competitive algorithm for minimum bit error rate beamforming. Int J Bio-Inspired Comput 1:125-133
    • (2009) Int J Bio-Inspired Comput , vol.1 , pp. 125-133
    • Khabbazi, A.1    Atashpaz, E.2    Lucas, C.3
  • 26
    • 0026243201 scopus 로고
    • The economic lot scheduling problem: Theory and practice
    • Lopez MA, Kingsman BG (1991) The economic lot scheduling problem: theory and practice. Int J Prod Econ 23:147-164
    • (1991) Int J Prod Econ , vol.23 , pp. 147-164
    • Lopez, M.A.1    Kingsman, B.G.2
  • 27
    • 0025403559 scopus 로고
    • A lot-sizing model for just-in-time manufacturing
    • Luss H, Rosenwein MB (1990) A lot-sizing model for just-in-time manufacturing. J Oper Res Soc 41(3):201-209
    • (1990) J Oper Res Soc , vol.41 , Issue.3 , pp. 201-209
    • Luss, H.1    Rosenwein, M.B.2
  • 28
    • 0001947442 scopus 로고
    • The scheduling of economic lot sizes
    • Maxwell WL (1964) The scheduling of economic lot sizes. Nav Res Logist Q 11:89-124
    • (1964) Nav Res Logist Q , vol.11 , pp. 89-124
    • Maxwell, W.L.1
  • 29
    • 0016551919 scopus 로고
    • Optimal production lot size model for a system with deteriorating items
    • Misra RB (1975) Optimal production lot size model for a system with deteriorating items. Int J Prod Res 13:495-505
    • (1975) Int J Prod Res , vol.13 , pp. 495-505
    • Misra, R.B.1
  • 31
    • 33748683739 scopus 로고    scopus 로고
    • Hybrid genetic algorithm for group technology economic lot scheduling problem
    • Moon IK, Cha BC, Bae HC (2006) Hybrid genetic algorithm for group technology economic lot scheduling problem. Int J Prod Res 44:4551-4568
    • (2006) Int J Prod Res , vol.44 , pp. 4551-4568
    • Moon, I.K.1    Cha, B.C.2    Bae, H.C.3
  • 32
    • 0020154464 scopus 로고
    • Perishable inventory theory: A review
    • Nahmias S (1978) Perishable inventory theory: a review. Oper Res 30:680-708
    • (1978) Oper Res , vol.30 , pp. 680-708
    • Nahmias, S.1
  • 35
    • 0025720325 scopus 로고
    • Survey of literature on continuously deteriorating inventory models
    • Raafat F (1991) Survey of literature on continuously deteriorating inventory models. J Oper Res Soc 42:27-37
    • (1991) J Oper Res Soc , vol.42 , pp. 27-37
    • Raafat, F.1
  • 36
    • 0001343645 scopus 로고
    • Rounding off to powers of two in continuous relaxations of capacitated lot sizing problems
    • Roundy R (1984) Rounding off to powers of two in continuous relaxations of capacitated lot sizing problems. Manag Sci 35:1433-1442
    • (1984) Manag Sci , vol.35 , pp. 1433-1442
    • Roundy, R.1
  • 38
    • 1542475830 scopus 로고    scopus 로고
    • A basic period approach to the economic lot scheduling problem with shelf life considerations
    • Soman CA, Van Donk DP, Gaalman G (2004) A basic period approach to the economic lot scheduling problem with shelf life considerations. Int J Prod Res 42:1677-1689
    • (2004) Int J Prod Res , vol.42 , pp. 1677-1689
    • Soman, C.A.1    Van Donk, D.P.2    Gaalman, G.3
  • 40
    • 36049016444 scopus 로고    scopus 로고
    • Improved immune algorithm for global numerical optimisation and job-shop scheduling problems
    • Tsai JT, Ho WH, Liu TK, Chou JH (2007) Improved immune algorithm for global numerical optimisation and job-shop scheduling problems. Appl Math Comput 194:406-424
    • (2007) Appl Math Comput , vol.194 , pp. 406-424
    • Tsai, J.T.1    Ho, W.H.2    Liu, T.K.3    Chou, J.H.4
  • 41
    • 0035341857 scopus 로고    scopus 로고
    • The economic lot scheduling problem under power-of-two policy
    • Yao MJ, Elmaghraby SE (2001) The economic lot scheduling problem under power-of-two policy. Comput Math Appl (CMWA) 41:1379-1393
    • (2001) Comput Math Appl (CMWA) , vol.41 , pp. 1379-1393
    • Yao, M.J.1    Elmaghraby, S.E.2
  • 42
    • 17944372286 scopus 로고    scopus 로고
    • On the feasibility testing of the economic lot scheduling problem using the extended basic period approach
    • Yao MJ, Elmaghraby SE, Chen IC (2003) On the feasibility testing of the economic lot scheduling problem using the extended basic period approach. J Chin Inst Ind Eng 20:435-448
    • (2003) J Chin Inst Ind Eng , vol.20 , pp. 435-448
    • Yao, M.J.1    Elmaghraby, S.E.2    Chen, I.C.3
  • 43
    • 17944365896 scopus 로고    scopus 로고
    • Solving the economic lot scheduling problem with deteriorating items using genetic algorithms
    • Yao MJ, Huang JX (2005) Solving the economic lot scheduling problem with deteriorating items using genetic algorithms. J Food Eng 70:309-322
    • (2005) J Food Eng , vol.70 , pp. 309-322
    • Yao, M.J.1    Huang, J.X.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.