메뉴 건너뛰기




Volumn 41, Issue 2, 2013, Pages 390-396

Decision support for lead time and demand variability reduction

Author keywords

Decision analysis; Inventory; Lead time; Marginal value; Supply chain management

Indexed keywords

DECISION MAKING; DECISION SUPPORT SYSTEMS; DECISION THEORY; INVESTMENTS;

EID: 84867025742     PISSN: 03050483     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.omega.2012.03.005     Document Type: Article
Times cited : (29)

References (33)
  • 1
    • 0031108822 scopus 로고    scopus 로고
    • Information distortion in a supply chain: the bullwhip effect
    • Lee H.L., Padmanabhan V., Whang S. Information distortion in a supply chain: the bullwhip effect. Management Science 1997, 43(4):546-559.
    • (1997) Management Science , vol.43 , Issue.4 , pp. 546-559
    • Lee, H.L.1    Padmanabhan, V.2    Whang, S.3
  • 2
    • 0033686633 scopus 로고    scopus 로고
    • The value of information sharing in a two-level supply chain
    • Lee H.L., So K.C., Tang C.S. The value of information sharing in a two-level supply chain. Management Science 2000, 46(5):626-643.
    • (2000) Management Science , vol.46 , Issue.5 , pp. 626-643
    • Lee, H.L.1    So, K.C.2    Tang, C.S.3
  • 3
    • 0141636309 scopus 로고    scopus 로고
    • Supply-side collaboration and its value in supply chains
    • Fu Y., Piplani R. Supply-side collaboration and its value in supply chains. European Journal of Operational Research 2004, 152(1):281-288.
    • (2004) European Journal of Operational Research , vol.152 , Issue.1 , pp. 281-288
    • Fu, Y.1    Piplani, R.2
  • 4
    • 0035351881 scopus 로고    scopus 로고
    • Producer-supplier contracts with incomplete information
    • Lim W.S. Producer-supplier contracts with incomplete information. Management Science 2001, 47(5):709-715.
    • (2001) Management Science , vol.47 , Issue.5 , pp. 709-715
    • Lim, W.S.1
  • 6
    • 0242624454 scopus 로고    scopus 로고
    • Models for supply chains in e-business
    • Swaminathan J.M., Tayur S.R. Models for supply chains in e-business. Management Science 2003, 49(10):1387-1406.
    • (2003) Management Science , vol.49 , Issue.10 , pp. 1387-1406
    • Swaminathan, J.M.1    Tayur, S.R.2
  • 7
    • 71349087209 scopus 로고    scopus 로고
    • The impact of supply chain integration on performance: a contingency and configuration approach
    • Flynn B.B., Huo B., Zhao X. The impact of supply chain integration on performance: a contingency and configuration approach. Journal of Operations Management 2010, 28(1):58-71.
    • (2010) Journal of Operations Management , vol.28 , Issue.1 , pp. 58-71
    • Flynn, B.B.1    Huo, B.2    Zhao, X.3
  • 8
    • 0026819456 scopus 로고
    • Changing the givens in modelling inventory problems: the example of just-in-time systems
    • Silver E.A. Changing the givens in modelling inventory problems: the example of just-in-time systems. International Journal of Production Economics 1992, 26(1-3):347-351.
    • (1992) International Journal of Production Economics , vol.26 , Issue.1-3 , pp. 347-351
    • Silver, E.A.1
  • 9
    • 41949106779 scopus 로고    scopus 로고
    • Target costing for supply chain management: an economic framework
    • Smith W.I., Lockamy A. Target costing for supply chain management: an economic framework. Journal of Corporate Accounting & Finance 2000, 12(1):67-77.
    • (2000) Journal of Corporate Accounting & Finance , vol.12 , Issue.1 , pp. 67-77
    • Smith, W.I.1    Lockamy, A.2
  • 10
    • 0037431656 scopus 로고    scopus 로고
    • A stochastic inventory modelof dualsourced supply chain with lead-time reduction
    • Ryu S.W., Lee K.K. A stochastic inventory modelof dualsourced supply chain with lead-time reduction. International Journal of Production Economics 2003, 81-82:513-524.
    • (2003) International Journal of Production Economics , pp. 513-524
    • Ryu, S.W.1    Lee, K.K.2
  • 11
    • 79951670256 scopus 로고    scopus 로고
    • The impact of stochastic lead time reduction on inventory cost under order crossover
    • Hayya J.C., Harrison T.P., He X.J. The impact of stochastic lead time reduction on inventory cost under order crossover. European Journal of Operational Research 2011, 211:274-281.
    • (2011) European Journal of Operational Research , vol.211 , pp. 274-281
    • Hayya, J.C.1    Harrison, T.P.2    He, X.J.3
  • 12
    • 30044434448 scopus 로고    scopus 로고
    • Sharing shipping quantity information in the supply chain
    • Zhang C., Tan G.W., Robb D.J., Zheng X. Sharing shipping quantity information in the supply chain. Omega 2006, 34(5):427-438.
    • (2006) Omega , vol.34 , Issue.5 , pp. 427-438
    • Zhang, C.1    Tan, G.W.2    Robb, D.J.3    Zheng, X.4
  • 13
    • 0348154255 scopus 로고    scopus 로고
    • Contract assembly: dealing with combined supply lead time and demand quantity uncertainty
    • Song J.S., Yano C.A., Lerssrisutiya P. Contract assembly: dealing with combined supply lead time and demand quantity uncertainty. Manufacturing & Service Operations Management 2000, 2(3):287-296.
    • (2000) Manufacturing & Service Operations Management , vol.2 , Issue.3 , pp. 287-296
    • Song, J.S.1    Yano, C.A.2    Lerssrisutiya, P.3
  • 14
    • 36549064794 scopus 로고    scopus 로고
    • A supply chain design model with unreliable supply
    • Qi L., Shen Z.M. A supply chain design model with unreliable supply. Naval Research Logistics 2007, 54(8):829-844.
    • (2007) Naval Research Logistics , vol.54 , Issue.8 , pp. 829-844
    • Qi, L.1    Shen, Z.M.2
  • 15
    • 0026151962 scopus 로고
    • Investing in reducing lead-time randomness in continuous-review inventory models
    • Gerchak Y., Parlar M. Investing in reducing lead-time randomness in continuous-review inventory models. Engineering Costs and Production Economics 1991, 21:191-197.
    • (1991) Engineering Costs and Production Economics , vol.21 , pp. 191-197
    • Gerchak, Y.1    Parlar, M.2
  • 16
    • 0016521332 scopus 로고
    • Effect of lead time on inventory: a static analysis
    • Das C. Effect of lead time on inventory: a static analysis. Operational Research Quarterly 1975, 26(2):273-282.
    • (1975) Operational Research Quarterly , vol.26 , Issue.2 , pp. 273-282
    • Das, C.1
  • 17
    • 40649104337 scopus 로고    scopus 로고
    • Incentives for information sharing in duopoly with capacity constraints
    • Wu J., Zhai X., Huang Z. Incentives for information sharing in duopoly with capacity constraints. Omega 2008, 36(6):963-975.
    • (2008) Omega , vol.36 , Issue.6 , pp. 963-975
    • Wu, J.1    Zhai, X.2    Huang, Z.3
  • 18
    • 80054110961 scopus 로고    scopus 로고
    • A delayed demand supply chain: incentives for upstream players
    • Hosoda T., Disney S.M. A delayed demand supply chain: incentives for upstream players. Omega 2012, 40(4):478-487.
    • (2012) Omega , vol.40 , Issue.4 , pp. 478-487
    • Hosoda, T.1    Disney, S.M.2
  • 19
    • 0032290624 scopus 로고    scopus 로고
    • Optimization of (s,S) inventory systems with random lead times and a service level constraint
    • Bashyam S., Fu M.C. Optimization of (s,S) inventory systems with random lead times and a service level constraint. Management Science 1998, 44(12):243-256.
    • (1998) Management Science , vol.44 , Issue.12 , pp. 243-256
    • Bashyam, S.1    Fu, M.C.2
  • 24
    • 80052025507 scopus 로고    scopus 로고
    • Inventory control for the supply chain: an adaptive control approach based on the identification of the lead-time
    • Garcia C.A., Ibeas A., Herrera J., Vilanova R. Inventory control for the supply chain: an adaptive control approach based on the identification of the lead-time. Omega 2012, 40(3):314-327.
    • (2012) Omega , vol.40 , Issue.3 , pp. 314-327
    • Garcia, C.A.1    Ibeas, A.2    Herrera, J.3    Vilanova, R.4
  • 25
    • 38649130709 scopus 로고    scopus 로고
    • Inventory management with variable lead-time dependent procurement cost
    • Chandra C., Grabis J. Inventory management with variable lead-time dependent procurement cost. Omega 2008, 36:877-887.
    • (2008) Omega , vol.36 , pp. 877-887
    • Chandra, C.1    Grabis, J.2
  • 26
    • 33746256211 scopus 로고    scopus 로고
    • Recursive behavior of safety stock reduction: the effect of lead-time uncertainty
    • Wang P., Hill J.A. Recursive behavior of safety stock reduction: the effect of lead-time uncertainty. Decision Sciences 2006, 37(2):285-290.
    • (2006) Decision Sciences , vol.37 , Issue.2 , pp. 285-290
    • Wang, P.1    Hill, J.A.2
  • 28
    • 85005421889 scopus 로고
    • The cost of ignoring lead-time unreliability in inventory theory
    • Vinson C. The cost of ignoring lead-time unreliability in inventory theory. Decision Sciences 1972, 3(2):87-105.
    • (1972) Decision Sciences , vol.3 , Issue.2 , pp. 87-105
    • Vinson, C.1
  • 29
    • 20444479443 scopus 로고    scopus 로고
    • The effect of lead time uncertainty on safety stocks
    • Chopra S., Reinhardt G., Dada M. The effect of lead time uncertainty on safety stocks. Decision Sciences 2004, 35(1):1-24.
    • (2004) Decision Sciences , vol.35 , Issue.1 , pp. 1-24
    • Chopra, S.1    Reinhardt, G.2    Dada, M.3
  • 30
    • 19744372304 scopus 로고    scopus 로고
    • The cost of lead-time variability: the case of the exponential distribution
    • He X.J., Kim J.G., Hayya J.C. The cost of lead-time variability: the case of the exponential distribution. International Journal of Production Economics 2005, 97(2):130-142.
    • (2005) International Journal of Production Economics , vol.97 , Issue.2 , pp. 130-142
    • He, X.J.1    Kim, J.G.2    Hayya, J.C.3
  • 32
    • 77957159986 scopus 로고    scopus 로고
    • The exact fill rate in a periodic review base stock system under normally distributed demand
    • Silver E.A., Bischak D.P. The exact fill rate in a periodic review base stock system under normally distributed demand. Omega 2011, 39(3):346-349.
    • (2011) Omega , vol.39 , Issue.3 , pp. 346-349
    • Silver, E.A.1    Bischak, D.P.2
  • 33
    • 38749152403 scopus 로고    scopus 로고
    • Some insights regarding the optimal reorder period in periodic review inventory systems
    • Silver E.A., Robb D.J. Some insights regarding the optimal reorder period in periodic review inventory systems. International Journal of Production Economics 2008, 112(1):354-366.
    • (2008) International Journal of Production Economics , vol.112 , Issue.1 , pp. 354-366
    • Silver, E.A.1    Robb, D.J.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.