-
1
-
-
0003515463
-
-
Prentice-Hall Englewood Cliffs, New Jersey
-
R. Ahuja, T. Magnanti, and J. Orlin Network Flows: Theory, Algorithms, and Applications 1993 Prentice-Hall Englewood Cliffs, New Jersey
-
(1993)
Network Flows: Theory, Algorithms, and Applications
-
-
Ahuja, R.1
Magnanti, T.2
Orlin, J.3
-
4
-
-
33846605140
-
Using mixed-integer programming to solve power grid blackout problems
-
D. Bienstock, and S. Mattia Using mixed-integer programming to solve power grid blackout problems Discrete Optimization 4 1 2007 115 141
-
(2007)
Discrete Optimization
, vol.4
, Issue.1
, pp. 115-141
-
-
Bienstock, D.1
Mattia, S.2
-
5
-
-
84902116005
-
Forthcoming. Integrating restoration and scheduling decisions for disrupted interdependent infrastructure systems
-
Cavdaroglu, B.; Hammel, E.; Mitchell, J.; Sharkey, T.; Wallace, W.; forthcoming. Integrating restoration and scheduling decisions for disrupted interdependent infrastructure systems. Annals of Operations Research. http://dx.doi.org/10.1007/s10479-011-0959-3.
-
Annals of Operations Research
-
-
Cavdaroglu, B.1
Hammel, E.2
Mitchell, J.3
Sharkey, T.4
Wallace, W.5
-
6
-
-
34247199918
-
Infrastructure failure interdependencies in extreme events: Power outage consequences in the 1998 ice storm
-
S. Chang, T. McDaniels, J. Mikawoz, and K. Peterson Infrastructure failure interdependencies in extreme events: power outage consequences in the 1998 ice storm Natural Hazards 41 2 2007 337 358
-
(2007)
Natural Hazards
, vol.41
, Issue.2
, pp. 337-358
-
-
Chang, S.1
McDaniels, T.2
Mikawoz, J.3
Peterson, K.4
-
7
-
-
31144479402
-
Single-machine scheduling with precedence constraints
-
J. Correa, and A. Schulz Single-machine scheduling with precedence constraints Mathematics of Operations Research 30 4 2005 1005 1021
-
(2005)
Mathematics of Operations Research
, vol.30
, Issue.4
, pp. 1005-1021
-
-
Correa, J.1
Schulz, A.2
-
8
-
-
0000788402
-
Lifted flow cover inequalities for mixed 0-1 integer programs
-
Z. Gu, G. Nemhauser, and M. Savelsbergh Lifted flow cover inequalities for mixed 0-1 integer programs Mathematical Programming 85 3 1999 439 467
-
(1999)
Mathematical Programming
, vol.85
, Issue.3
, pp. 439-467
-
-
Gu, Z.1
Nemhauser, G.2
Savelsbergh, M.3
-
9
-
-
0032628273
-
Efficient recovery from power outage
-
Vitter, J.; Larmore, L.; Leighton, F. (Eds.) Atlanta, GA, USA
-
Guha, S.; Moss, A.; Naor, J.; Schieber, B.; 1999. Efficient recovery from power outage. In: Vitter, J.; Larmore, L.; Leighton, F. (Eds.), Proceedings of the Symposium on Theory of Computing (STOC). Atlanta, GA, USA.
-
(1999)
Proceedings of the Symposium on Theory of Computing (STOC)
-
-
Guha, S.1
Moss, A.2
Naor, J.3
Schieber, B.4
-
10
-
-
36248929272
-
Restoration of services in interdependent infrastructure systems: A network flows approach
-
E. Lee, J. Mitchell, and W. Wallace Restoration of services in interdependent infrastructure systems: a network flows approach IEEE Transactions on Systems, Man, and Cybernetics, Part C: Applications and Reviews 37 6 2007 1303 1317
-
(2007)
IEEE Transactions on Systems, Man, and Cybernetics, Part C: Applications and Reviews
, vol.37
, Issue.6
, pp. 1303-1317
-
-
Lee, E.1
Mitchell, J.2
Wallace, W.3
-
12
-
-
33751084580
-
Impacts of the 2001 World Trade Center attack on New York City critical infrastructures
-
D. Mendonca, and W. Wallace Impacts of the 2001 World Trade Center attack on New York City critical infrastructures Journal of Infrastructure Systems 12 4 2006 260 270
-
(2006)
Journal of Infrastructure Systems
, vol.12
, Issue.4
, pp. 260-270
-
-
Mendonca, D.1
Wallace, W.2
-
13
-
-
0037871958
-
Solving project scheduling problems by minimum cut computations
-
R. Möhring, A. Schulz, F. Stork, and M. Uetz Solving project scheduling problems by minimum cut computations Management Science 49 3 2003 330 350
-
(2003)
Management Science
, vol.49
, Issue.3
, pp. 330-350
-
-
Möhring, R.1
Schulz, A.2
Stork, F.3
Uetz, M.4
-
14
-
-
84901037182
-
Restoring infrastructure systems: An integrated network design and scheduling problem
-
Johnson, A.; Miller, J. (Eds.) Cancun, Mexico
-
Nurre, S.; Sharkey, T.; 2010. Restoring infrastructure systems: an integrated network design and scheduling problem. In Johnson, A.; Miller, J. (Eds.), Proceedings of the 2010 Industrial Engineering Research Conference. Cancun, Mexico.
-
(2010)
Proceedings of the 2010 Industrial Engineering Research Conference
-
-
Nurre, S.1
Sharkey, T.2
-
15
-
-
64549088634
-
Critical infrastructure, interdependencies, and resilience
-
T. O'Rourke Critical infrastructure, interdependencies, and resilience The Bridge: National Academy of Engineering 37 1 2007 22 29
-
(2007)
The Bridge: National Academy of Engineering
, vol.37
, Issue.1
, pp. 22-29
-
-
O'Rourke, T.1
-
16
-
-
84866395745
-
-
Progress Energy, Storm Information
-
Progress Energy, 2010. Storm Information. Retrieved from < https://www.progress-energy.com/carolinas/home/storms-outages/index.page >.
-
(2010)
-
-
-
18
-
-
0035696915
-
Identifying, understanding, and analyzing critical infrastructure interdependencies
-
S.M. Rinaldi, J.P. Peerenboom, and T.K. Kelly Identifying, understanding, and analyzing critical infrastructure interdependencies IEEE Control Systems Magazine 21 6 2001 11 25
-
(2001)
IEEE Control Systems Magazine
, vol.21
, Issue.6
, pp. 11-25
-
-
Rinaldi, S.M.1
Peerenboom, J.P.2
Kelly, T.K.3
-
19
-
-
14644393550
-
An experimental study of LP-based approximation algorithms for scheduling problems
-
M. Savelsbergh, R. Uma, and J. Wein An experimental study of LP-based approximation algorithms for scheduling problems INFORMS Journal on Computing 17 1 2005 123 136
-
(2005)
INFORMS Journal on Computing
, vol.17
, Issue.1
, pp. 123-136
-
-
Savelsbergh, M.1
Uma, R.2
Wein, J.3
-
20
-
-
0004321534
-
-
Unpublished doctoral dissertation, Department of Mathematics, Technische Universität Berlin, Germany
-
Schulz, A.; 1996. Polytopes and scheduling. Unpublished doctoral dissertation, Department of Mathematics, Technische Universität Berlin, Germany.
-
(1996)
Polytopes and Scheduling
-
-
Schulz, A.1
-
21
-
-
0002066821
-
Various optimizers for single stage production
-
W. Smith Various optimizers for single stage production Naval Research Logistics 3 1-2 1956 59 66
-
(1956)
Naval Research Logistics
, vol.3
, Issue.12
, pp. 59-66
-
-
Smith, W.1
-
22
-
-
34249830539
-
A time indexed formulation of non-preemptive single machine scheduling problems
-
J. Sousa, and L. Wolsey A time indexed formulation of non-preemptive single machine scheduling problems Mathematical Programming 54 3 1992 353 367
-
(1992)
Mathematical Programming
, vol.54
, Issue.3
, pp. 353-367
-
-
Sousa, J.1
Wolsey, L.2
-
23
-
-
15744397018
-
Managing disruptions to critical interdependent infrastructures in the context of the 2001 World Trade Center attack
-
W. Wallace, D. Mendonca, E. Lee, J. Mitchell, and J. Chow Managing disruptions to critical interdependent infrastructures in the context of the 2001 World Trade Center attack Beyond September 2003 165 198
-
(2003)
Beyond September
, pp. 165-198
-
-
Wallace, W.1
Mendonca, D.2
Lee, E.3
Mitchell, J.4
Chow, J.5
-
24
-
-
21244468469
-
The relation of time indexed formulations of single machine scheduling problems to the node packing problem
-
H. Waterer, E. Johnson, P. Nobili, and M. Savelsbergh The relation of time indexed formulations of single machine scheduling problems to the node packing problem Mathematical Programming 93 3 2002 477 494
-
(2002)
Mathematical Programming
, vol.93
, Issue.3
, pp. 477-494
-
-
Waterer, H.1
Johnson, E.2
Nobili, P.3
Savelsbergh, M.4
-
25
-
-
33846408652
-
Optimizing scheduling of post-earthquake electric power restoration tasks
-
N. Xu, S. Guikema, R. Davidson, L. Nozick, Z. Cagnan, and K. Vaziri Optimizing scheduling of post-earthquake electric power restoration tasks Earthquake Engineering and Structural Dynamics 36 2 2007 265 284
-
(2007)
Earthquake Engineering and Structural Dynamics
, vol.36
, Issue.2
, pp. 265-284
-
-
Xu, N.1
Guikema, S.2
Davidson, R.3
Nozick, L.4
Cagnan, Z.5
Vaziri, K.6
|