-
2
-
-
84865653540
-
-
Renewable Energies Agency
-
Renewable Energies Agency. EEG Stammdaten, Berlin, 2010.
-
(2010)
EEG Stammdaten, Berlin.
-
-
-
9
-
-
84889714896
-
Solar Energy Grid integration Systems (SEGIS): Goals, Processes and Impacts
-
Bower W,. Solar Energy Grid integration Systems (SEGIS): Goals, Processes and Impacts. 4th International Conference on Integration of Renewable and Distributed Energy Resources, Albuquerque, NM, December 2010.
-
(2010)
4th International Conference on Integration of Renewable and Distributed Energy Resources, Albuquerque, NM, December
-
-
Bower, W.1
-
10
-
-
84865627487
-
Specifieke Technische Aansluitingsvoorschriften voor Gedecentraliseerde Productie-installaties die in Parallel Werken met het Distributienet
-
C10/11, Rev. 12, May.
-
Specifieke Technische Aansluitingsvoorschriften voor Gedecentraliseerde Productie-installaties die in Parallel Werken met het Distributienet. Synergrid, C10/11, Rev. 12, May 2009.
-
(2009)
Synergrid
-
-
-
15
-
-
84889761839
-
-
DERlab e.V. [accessed on 11 May 2011]
-
DERlab e.V. http://derlab.eu/media/pdf/docs/D2.1-Rev7f-PU.pdf [accessed on 11 May 2011].
-
-
-
-
17
-
-
84889699795
-
-
Strauss P. (ed.). DERlab. Deliverable 2.8, Kassel, Germany [accessed on 12 May 2011].
-
Strauss P, (ed.). DER Inverter White Book. DERlab. Deliverable 2.8, Kassel, Germany, 2009. http://www.derlab.eu/media/pdf/docs/DERlab-D2.8- whitebook-static-converters-rev0.pdf [accessed on 12 May 2011].
-
(2009)
DER Inverter White Book
-
-
-
18
-
-
84889719605
-
European Network of Transmission System Operators for Electricity (ENTSO-E)
-
Brussels, Belgium [accessed on 12 May 2011]
-
European Network of Transmission System Operators for Electricity (ENTSO-E). Draft Requirements for Grid Connection Applicable to all Generators, Brussels, March 2011. Brussels, Belgium, http://www.entsoe.eu [accessed on 12 May 2011].
-
(2011)
Draft Requirements for Grid Connection Applicable to All Generators, Brussels, March
-
-
-
19
-
-
84865653550
-
Draft Requirements for Grid Connection Applicable to all Generators, ENTSO-E, 22 March
-
[accessed on 12 May 2011]
-
Draft Requirements for Grid Connection Applicable to all Generators, ENTSO-E, 22 March 2011. http://www.entsoe.eu/ [accessed on 12 May 2011].
-
(2011)
Http://www.entsoe.eu/
-
-
-
20
-
-
84875688552
-
Voltage control in distribution systems with high level of pv-penetration-improving absorption capacity for pv systems by reactive power supply
-
Stetz T, Yan W, Braun M,. Voltage Control in Distribution Systems with High Level of PV-penetration-Improving Absorption Capacity for PV Systems by Reactive Power Supply. 25th European Photovoltaic Solar Energy Conference, Valencia, 2010.
-
(2010)
25th European Photovoltaic Solar Energy Conference, Valencia
-
-
Stetz, T.1
Yan, W.2
Braun, M.3
-
21
-
-
84905835025
-
Improving PV-integration into the Distribution Grid-Contribution of Multifunctional PV-battery systems to Stabilised System Operation
-
Braun M, Büdenbender K, Thomas U, Schmiegel A, Schuh H, Magnor D, Sauer DU, Marcel JC,. Improving PV-integration into the Distribution Grid-Contribution of Multifunctional PV-battery systems to Stabilised System Operation. 25th European Photovoltaic Solar Energy Conference and Exhibition, Valencia, 2010.
-
(2010)
25th European Photovoltaic Solar Energy Conference and Exhibition, Valencia.
-
-
Braun, M.1
Büdenbender, K.2
Thomas, U.3
Schmiegel, A.4
Schuh, H.5
Magnor, D.6
Sauer, D.U.7
Marcel, J.C.8
-
22
-
-
80054888153
-
-
ICCEP: Ischia (Italy), 14-16 June.
-
Favuzza S, Graditi G, Ippolito MG, Massaro F, Musca R, Riva Sanseverino E, Zizzo G,. Transition of a Distribution System towards an Active Network. Part I: Preliminary Design and Scenario Perspectives. ICCEP: Ischia (Italy), 14-16 June 2011.
-
(2011)
Transition of A Distribution System Towards An Active Network. Part I: Preliminary Design and Scenario Perspectives
-
-
Favuzza, S.1
Graditi, G.2
Ippolito, M.G.3
Massaro, F.4
Musca, R.5
Riva Sanseverino, E.6
Zizzo, G.7
-
23
-
-
80054915092
-
-
ICCEP: Ischia (Italy), 14-16 June.
-
Cosentino V, Graditi G, Favuzza S, Ippolito MG, Massaro F, Riva Sanseverino E, Zizzo G,. Transition of a Distribution System towards an Active Network. Part II: Economical Analysis of Selected Scenario. ICCEP: Ischia (Italy), 14-16 June 2011.
-
(2011)
Transition of A Distribution System Towards An Active Network. Part II: Economical Analysis of Selected Scenario
-
-
Cosentino, V.1
Graditi, G.2
Favuzza, S.3
Ippolito, M.G.4
Massaro, F.5
Riva Sanseverino, E.6
Zizzo, G.7
-
24
-
-
84865663187
-
-
CIRED: Frankfurt (Germany), 6-9 June.
-
Favuzza S, Graditi G, Ippolito MG, Massaro F, Musca R, Riva Sanseverino E, Zizzo G,. From Fuel Based Generation to Smart Renewable Generation: Preliminary Design for an Islanded System. Part I: Technical Issue and Future Scenarios. CIRED: Frankfurt (Germany), 6-9 June 2011.
-
(2011)
From Fuel Based Generation to Smart Renewable Generation: Preliminary Design for An Islanded System. Part I: Technical Issue and Future Scenarios
-
-
Favuzza, S.1
Graditi, G.2
Ippolito, M.G.3
Massaro, F.4
Musca, R.5
Riva Sanseverino, E.6
Zizzo, G.7
-
25
-
-
84893582292
-
-
CIRED: Frankfurt (Germany), 6-9 June.
-
Cosentino V, Graditi G, Favuzza S, Ippolito MG, Massaro F, Riva Sanseverino E, Zizzo G,. From Fuel Based Generation to Smart Renewable Generation: Preliminary Design for an Islanded System. Part II: Selection of Future Scenario and Economical Issues. CIRED: Frankfurt (Germany), 6-9 June 2011.
-
(2011)
From Fuel Based Generation to Smart Renewable Generation: Preliminary Design for An Islanded System. Part II: Selection of Future Scenario and Economical Issues
-
-
Cosentino, V.1
Graditi, G.2
Favuzza, S.3
Ippolito, M.G.4
Massaro, F.5
Riva Sanseverino, E.6
Zizzo, G.7
-
26
-
-
84861014910
-
Deploying high penetration photovoltaic systems -A case study
-
Coddington M, Baca D, Kroposki B, Basso T,. Deploying High Penetration Photovoltaic Systems-A Case Study. IEEE Photovoltaic Specialist Conference, Seattle, WA, June 2011.
-
(2011)
IEEE Photovoltaic Specialist Conference, Seattle, WA, June.
-
-
Coddington, M.1
Baca, D.2
Kroposki, B.3
Basso, T.4
-
27
-
-
84893726098
-
Analysis of high-penetration levels of pv into the distribution grid in california
-
Mather B,. Analysis of High-penetration Levels of PV into the Distribution Grid in California. High Penetration Solar Forum, San Diego, CA, March 2011.
-
(2011)
High Penetration Solar Forum, San Diego, CA, March.
-
-
Mather, B.1
-
29
-
-
82855164143
-
Reactive power control method between dg using ict for proper voltage control of utility distribution system
-
Kobayashi H, Hatta H,. Reactive Power Control Method between DG Using ICT for Proper Voltage Control of Utility Distribution System. Proceedings of the IEEE PES General Meeting, 2011.
-
(2011)
Proceedings of the IEEE PES General Meeting.
-
-
Kobayashi, H.1
Hatta, H.2
-
33
-
-
84889697713
-
Bringing together international research on high penetration pv in electricity grids -The new task 14 of the iea -Pvps programme
-
Mayr C, Bründlinger R, Fechner H, Braun M, Ogimoto K, Frederiksen K, Kroposki B, Graditi G, MacGill IF, Turcotte D, Perret L,. Bringing Together International Research on High Penetration PV in Electricity Grids-The New Task 14 of the IEA-PVPS Programme. 4th International Conference on Integration of Renewable and Distributed Energy Resources, Albuquerque, USA, 2010.
-
(2010)
4th International Conference on Integration of Renewable and Distributed Energy Resources, Albuquerque, USA
-
-
Mayr, C.1
Bründlinger, R.2
Fechner, H.3
Braun, M.4
Ogimoto, K.5
Frederiksen, K.6
Kroposki, B.7
Graditi, G.8
MacGill, I.F.9
Turcotte, D.10
Perret, L.11
-
34
-
-
84889741353
-
Technical site description of the demonstration zone including results from measurements
-
Vandewaerde D, Truyens F, Lemmens E, Deprez W, Woyte A, Dexters A,. Technical Site Description of the Demonstration Zone Including Results from Measurements. MetaPV, Deliverable 1.1, December 2010.
-
(2010)
MetaPV, Deliverable 1.1, December
-
-
Vandewaerde, D.1
Truyens, F.2
Lemmens, E.3
Deprez, W.4
Woyte, A.5
Dexters, A.6
-
35
-
-
79957862710
-
Enhancement of the Network Hosting Capacity-Clearing Space for/with PV
-
Bletterie B, Goršek A, Uljanić B, Blažič B, Woyte A, Vu Van T, Truyens F, Jahn J,. Enhancement of the Network Hosting Capacity-Clearing Space for/with PV. 25th European Photovoltaic Solar Energy Conference and Exhibition, Valencia, 2010.
-
(2010)
25th European Photovoltaic Solar Energy Conference and Exhibition, Valencia
-
-
Bletterie, B.1
Goršek, A.2
Uljanić, B.3
Blažič, B.4
Woyte, A.5
Van, V.T.6
Truyens, F.7
Jahn, J.8
|