메뉴 건너뛰기




Volumn 20, Issue 6, 2012, Pages 681-697

Is the distribution grid ready to accept large-scale photovoltaic deployment? State of the art, progress, and future prospects

Author keywords

ancillary services; case studies; distribution grid; grid codes; grid integration; photovoltaic

Indexed keywords

ANCILLARY SERVICE; DISTRIBUTION GRID; GRID CODES; GRID INTEGRATION; PHOTOVOLTAIC;

EID: 84865615565     PISSN: 10627995     EISSN: 1099159X     Source Type: Journal    
DOI: 10.1002/pip.1204     Document Type: Conference Paper
Times cited : (139)

References (35)
  • 2
    • 84865653540 scopus 로고    scopus 로고
    • Renewable Energies Agency
    • Renewable Energies Agency. EEG Stammdaten, Berlin, 2010.
    • (2010) EEG Stammdaten, Berlin.
  • 10
    • 84865627487 scopus 로고    scopus 로고
    • Specifieke Technische Aansluitingsvoorschriften voor Gedecentraliseerde Productie-installaties die in Parallel Werken met het Distributienet
    • C10/11, Rev. 12, May.
    • Specifieke Technische Aansluitingsvoorschriften voor Gedecentraliseerde Productie-installaties die in Parallel Werken met het Distributienet. Synergrid, C10/11, Rev. 12, May 2009.
    • (2009) Synergrid
  • 15
    • 84889761839 scopus 로고    scopus 로고
    • DERlab e.V. [accessed on 11 May 2011]
    • DERlab e.V. http://derlab.eu/media/pdf/docs/D2.1-Rev7f-PU.pdf [accessed on 11 May 2011].
  • 17
    • 84889699795 scopus 로고    scopus 로고
    • Strauss P. (ed.). DERlab. Deliverable 2.8, Kassel, Germany [accessed on 12 May 2011].
    • Strauss P, (ed.). DER Inverter White Book. DERlab. Deliverable 2.8, Kassel, Germany, 2009. http://www.derlab.eu/media/pdf/docs/DERlab-D2.8- whitebook-static-converters-rev0.pdf [accessed on 12 May 2011].
    • (2009) DER Inverter White Book
  • 18
    • 84889719605 scopus 로고    scopus 로고
    • European Network of Transmission System Operators for Electricity (ENTSO-E)
    • Brussels, Belgium [accessed on 12 May 2011]
    • European Network of Transmission System Operators for Electricity (ENTSO-E). Draft Requirements for Grid Connection Applicable to all Generators, Brussels, March 2011. Brussels, Belgium, http://www.entsoe.eu [accessed on 12 May 2011].
    • (2011) Draft Requirements for Grid Connection Applicable to All Generators, Brussels, March
  • 19
    • 84865653550 scopus 로고    scopus 로고
    • Draft Requirements for Grid Connection Applicable to all Generators, ENTSO-E, 22 March
    • [accessed on 12 May 2011]
    • Draft Requirements for Grid Connection Applicable to all Generators, ENTSO-E, 22 March 2011. http://www.entsoe.eu/ [accessed on 12 May 2011].
    • (2011) Http://www.entsoe.eu/
  • 20
    • 84875688552 scopus 로고    scopus 로고
    • Voltage control in distribution systems with high level of pv-penetration-improving absorption capacity for pv systems by reactive power supply
    • Stetz T, Yan W, Braun M,. Voltage Control in Distribution Systems with High Level of PV-penetration-Improving Absorption Capacity for PV Systems by Reactive Power Supply. 25th European Photovoltaic Solar Energy Conference, Valencia, 2010.
    • (2010) 25th European Photovoltaic Solar Energy Conference, Valencia
    • Stetz, T.1    Yan, W.2    Braun, M.3
  • 27
    • 84893726098 scopus 로고    scopus 로고
    • Analysis of high-penetration levels of pv into the distribution grid in california
    • Mather B,. Analysis of High-penetration Levels of PV into the Distribution Grid in California. High Penetration Solar Forum, San Diego, CA, March 2011.
    • (2011) High Penetration Solar Forum, San Diego, CA, March.
    • Mather, B.1
  • 29
    • 82855164143 scopus 로고    scopus 로고
    • Reactive power control method between dg using ict for proper voltage control of utility distribution system
    • Kobayashi H, Hatta H,. Reactive Power Control Method between DG Using ICT for Proper Voltage Control of Utility Distribution System. Proceedings of the IEEE PES General Meeting, 2011.
    • (2011) Proceedings of the IEEE PES General Meeting.
    • Kobayashi, H.1    Hatta, H.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.