메뉴 건너뛰기




Volumn 3, Issue 3, 2012, Pages 1235-1243

Reliability evaluation of phasor measurement unit using Monte Carlo dynamic fault tree method

Author keywords

Dynamic fault tree analysis; Monte Carlo simulation; phasor measurement unit (PMU); reliability evaluation; wide area monitoring system (WAMS)

Indexed keywords

DYNAMIC FAULT TREE ANALYSIS; MONTE CARLO SIMULATION; PHASOR MEASUREMENT UNIT; RELIABILITY EVALUATION; WIDE AREA MONITORING SYSTEM;

EID: 84865500412     PISSN: 19493053     EISSN: None     Source Type: Journal    
DOI: 10.1109/TSG.2011.2180937     Document Type: Article
Times cited : (89)

References (26)
  • 1
    • 21244494114 scopus 로고    scopus 로고
    • Wide-area protection and power system utilization
    • DOI 10.1109/JPROC.2005.847266, Energy Infrastructure Defense Systems
    • J. Bertsch et al., "Wide-area protection and power system utilization", Proc. IEEE, vol. 93, no. 5, pp. 997-1003, May 2005. (Pubitemid 40891831)
    • (2005) Proceedings of the IEEE , vol.93 , Issue.5 , pp. 997-1003
    • Bertsch, J.1    Carnal, C.2    Karlsson, D.3    McDaniel, J.4    Vu, K.5
  • 3
    • 77954028596 scopus 로고    scopus 로고
    • Reliability analysis of wide-area measurement system
    • Jul.
    • Y. Wang, W. Y. Li, and J. P. Lu, "Reliability analysis of wide-area measurement system", IEEE Trans. Power Del., vol. 25, no. 3, pp. 1483-1491, Jul. 2010.
    • (2010) IEEE Trans. Power Del. , vol.25 , Issue.3 , pp. 1483-1491
    • Wang, Y.1    Li, W.Y.2    Lu, J.P.3
  • 4
    • 84865469588 scopus 로고    scopus 로고
    • Reliability evaluation of the communication network in wide-area protection
    • unpublished
    • Z. H. Dai, Z. P. Wang, and Y. J. Jiao, "Reliability evaluation of the communication network in wide-area protection", IEEE Trans. Power Del., unpublished.
    • IEEE Trans. Power Del.
    • Dai, Z.H.1    Wang, Z.P.2    Jiao, Y.J.3
  • 5
    • 77957325730 scopus 로고    scopus 로고
    • Ensemble decision trees for phasor measurement unit-based wide-area security assessment in the operations time frame
    • Dec.
    • S. R. Samantaray, I. Kamwa, and G. Joos, "Ensemble decision trees for phasor measurement unit-based wide-area security assessment in the operations time frame", IET Gener. Transm. Distrib., vol. 4, no. 12, pp. 1334-1348, Dec. 2010.
    • (2010) IET Gener. Transm. Distrib. , vol.4 , Issue.12 , pp. 1334-1348
    • Samantaray, S.R.1    Kamwa, I.2    Joos, G.3
  • 6
    • 51449099958 scopus 로고    scopus 로고
    • The wide-world of wide-area measurement
    • Aug.
    • A. G. Phadke and R. M. De Moraes, "The wide-world of wide-area measurement", IEEE Power Energy Mag., vol. 6, no. 5, pp. 52-65, Aug. 2008.
    • (2008) IEEE Power Energy Mag. , vol.6 , Issue.5 , pp. 52-65
    • Phadke, A.G.1    De Moraes, R.M.2
  • 7
    • 21244436499 scopus 로고    scopus 로고
    • Design aspects for wide-area monitoring and control systems
    • DOI 10.1109/JPROC.2005.846336, Energy Infrastructure Defense Systems
    • M. Zima et al., "Design aspects for wide-area monitoring and control systems", Proc. IEEE, vol. 93, no. 5, pp. 980-996, May 2005. (Pubitemid 40891830)
    • (2005) Proceedings of the IEEE , vol.93 , Issue.5 , pp. 980-996
    • Zima, M.1    Larsson, M.2    Korba, P.3    Rehtanz, C.4    Andersson, G.5
  • 8
    • 70349504663 scopus 로고    scopus 로고
    • Reliability analysis of phasor measurement unit using hierarchical Markov modeling
    • Y. Wang, W. Y. Li, and J. P. Lu, "Reliability analysis of phasor measurement unit using hierarchical Markov modeling", Electr. Power Compon. Syst., vol. 37, pp. 517-532, 2009.
    • (2009) Electr. Power Compon. Syst. , vol.37 , pp. 517-532
    • Wang, Y.1    Li, W.Y.2    Lu, J.P.3
  • 9
    • 77957009928 scopus 로고    scopus 로고
    • Reliability modeling of PMUs using fuzzy sets
    • Oct.
    • F. Aminifar et al., "Reliability modeling of PMUs using fuzzy sets", IEEE Trans. Power Del., vol. 25, no. 4, pp. 2384-2391, Oct. 2010.
    • (2010) IEEE Trans. Power Del. , vol.25 , Issue.4 , pp. 2384-2391
    • Aminifar, F.1
  • 10
    • 77949272703 scopus 로고    scopus 로고
    • Probabilistic algebraic analysis of fault trees with priority dynamic gates and repeated events
    • Mar.
    • G. Merle et al., "Probabilistic algebraic analysis of fault trees with priority dynamic gates and repeated events", IEEE Trans. Rel., vol. 59, no. 1, pp. 250-261, Mar. 2010.
    • (2010) IEEE Trans. Rel. , vol.59 , Issue.1 , pp. 250-261
    • Merle, G.1
  • 11
    • 0032157653 scopus 로고    scopus 로고
    • Design of reliable systems using static & dynamic fault trees
    • PII S0018952998097152
    • Y. Ren and J. B. Dugan, "Design of reliable systems using static & dynamic fault trees", IEEE Trans. Rel., vol. 47, no. 3, pp. 234-244, Sep. 1998. (Pubitemid 128741116)
    • (1998) IEEE Transactions on Reliability , vol.47 , Issue.3 PART 1 , pp. 234-244
    • Ren, Y.1    Dugan, J.B.2
  • 12
    • 84865496307 scopus 로고    scopus 로고
    • Research on reliability modeling of complex system based on dynamic fault tree
    • Oct.
    • J. Yuan et al., "Research on reliability modeling of complex system based on dynamic fault tree", in Proc. Technol. Innov. Conf., Oct. 2009, pp. 1-5.
    • (2009) Proc. Technol. Innov. Conf. , pp. 1-5
    • Yuan, J.1
  • 13
    • 0014881462 scopus 로고    scopus 로고
    • Network approaches to finding the reliability of repairable systems
    • Aug.
    • J. A. Buzacott, "Network approaches to finding the reliability of repairable systems", IEEE Trans. Rel., vol. 19, no. 4, pp. 140-146, Aug. 2009.
    • (2009) IEEE Trans. Rel. , vol.19 , Issue.4 , pp. 140-146
    • Buzacott, J.A.1
  • 14
    • 0017009468 scopus 로고    scopus 로고
    • An efficient algorithm for deducing the minimal cuts and reliability indices of a general network configuration
    • Aug.
    • R. N. Allan, R. Billinton, and M. F. De Oliveira, "An efficient algorithm for deducing the minimal cuts and reliability indices of a general network configuration", IEEE Trans. Rel., vol. 25, no. 4, pp. 226-233, Aug. 2009.
    • (2009) IEEE Trans. Rel. , vol.25 , Issue.4 , pp. 226-233
    • Allan, R.N.1    Billinton, R.2    De Oliveira, M.F.3
  • 15
    • 11244348902 scopus 로고    scopus 로고
    • Monte Carlo simulation based reliability evaluation in a multi-bilateral contracts market
    • DOI 10.1049/ip-gtd:20041066
    • L. Goel, P. A. Viswanath, and P. Wang, "Monte Carlo simulation based reliability evaluation in a multi-bilateral contracts market", IEE Proc. Gener., Transm., Distrib., vol. 151, no. 6, pp. 728-734, Dec. 2004. (Pubitemid 40056350)
    • (2004) IEE Proceedings: Generation, Transmission and Distribution , vol.151 , Issue.6 , pp. 728-734
    • Goel, L.1    Viswanath, P.A.2    Wang, P.3
  • 16
    • 0000504339 scopus 로고    scopus 로고
    • A fast Monte Carlo method for evaluating reliability indexes
    • Aug.
    • D. Lieber, A. Nemirovskii, and R. Y. Rubinstein, "A fast Monte Carlo method for evaluating reliability indexes", IEEE Trans. Rel., vol. 48, no. 3, pp. 256-261, Aug. 2002.
    • (2002) IEEE Trans. Rel. , vol.48 , Issue.3 , pp. 256-261
    • Lieber, D.1    Nemirovskii, A.2    Rubinstein, R.Y.3
  • 17
    • 0027700943 scopus 로고    scopus 로고
    • Monte Carlo simulation model for multiarea generation system reliability studies
    • Aug.
    • R. Billinton and L. Gan, "Monte Carlo simulation model for multiarea generation system reliability studies", IEE Proc. Gener., Transm., Distrib., vol. 140, no. 6, pp. 532-538, Aug. 2002.
    • (2002) IEE Proc. Gener., Transm., Distrib. , vol.140 , Issue.6 , pp. 532-538
    • Billinton, R.1    Gan, L.2
  • 19
    • 33847158806 scopus 로고    scopus 로고
    • Field experience and assessment of GPS signal receiving and distribution system for synchronizing power system protection, control and monitoring
    • Jun.
    • D. Itagaki, K. Ohashi, I. Shuto, and H. Ito, "Field experience and assessment of GPS signal receiving and distribution system for synchronizing power system protection, control and monitoring", in Proc. IEEE Power India Conf., Jun. 2006.
    • (2006) Proc. IEEE Power India Conf.
    • Itagaki, D.1    Ohashi, K.2    Shuto, I.3    Ito, H.4
  • 20
    • 33644935366 scopus 로고    scopus 로고
    • Development of high quality backup clock for synchronized phasor measurement unit
    • Jan.
    • S. Zhong, J. W. Fu, and X. R. Wang, "Development of high quality backup clock for synchronized phasor measurement unit", Autom. Electr. Power Syst., vol. 30, no. 1, pp. 68-72, Jan. 2006.
    • (2006) Autom. Electr. Power Syst. , vol.30 , Issue.1 , pp. 68-72
    • Zhong, S.1    Fu, J.W.2    Wang, X.R.3
  • 23
    • 84982318178 scopus 로고    scopus 로고
    • A method for extracting reliability importance indices from reliability simulations of electrical networks
    • Liege, Belgium, Aug
    • P. Hilber and L. Bertling, "A method for extracting reliability importance indices from reliability simulations of electrical networks", in Proc. 15th Power Syst. Comput. Conf. (PSCC), Liege, Belgium, Aug. 2005.
    • (2005) Proc. 15th Power Syst. Comput. Conf. (PSCC)
    • Hilber, P.1    Bertling, L.2
  • 24
    • 11244308001 scopus 로고    scopus 로고
    • Reliability analysis of digital relay
    • Eighth IEE International Conference on Developments in Power System Protection
    • M. S. Ding, G. Wang, and X. H. Li, "Reliability analysis of digital relay", in Proc. 8th IEE Int. Conf. Developments Power Syst. Protection, Apr. 2004, vol. 1, pp. 268-271. (Pubitemid 40061894)
    • (2004) IEE Conference Publication , vol.1 , pp. 268-271
    • Ding, M.1    Wang, G.2    Li, X.3
  • 26
    • 84865513989 scopus 로고    scopus 로고
    • Self-adaptive wide-area damping control based on SSI and WAMS
    • Jul.
    • P. Zhang et al., "Self-adaptive wide-area damping control based on SSI and WAMS", in Proc. Int. Conf. Electr. Eng., Jul. 2010, pp. 11-14.
    • (2010) Proc. Int. Conf. Electr. Eng. , pp. 11-14
    • Zhang, P.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.