-
2
-
-
37549009171
-
Modeling design information to evaluate pre-fabricated and pre-cast design solution for reducing construction waste in high rise residential buildings
-
A.N. Baldwin, L.Y. Shen, C.S. Poon, S.A. Austin, and I. Wong Modeling design information to evaluate pre-fabricated and pre-cast design solution for reducing construction waste in high rise residential buildings Automat. Constr. 17 3 2008 333 341
-
(2008)
Automat. Constr.
, vol.17
, Issue.3
, pp. 333-341
-
-
Baldwin, A.N.1
Shen, L.Y.2
Poon, C.S.3
Austin, S.A.4
Wong, I.5
-
3
-
-
33744941582
-
A benefit-cost analysis on the economic feasibility of construction waste minimization
-
R.A. Begum, C. Siwar, J.J. Pereira, and A.H. Jaafar A benefit-cost analysis on the economic feasibility of construction waste minimization Resour. Conserv. Recycl. 48 1 2006 86 98
-
(2006)
Resour. Conserv. Recycl.
, vol.48
, Issue.1
, pp. 86-98
-
-
Begum, R.A.1
Siwar, C.2
Pereira, J.J.3
Jaafar, A.H.4
-
5
-
-
0030406151
-
Construction waste: Quantification and source evaluation
-
A.G. Bossink, and H.J.H. Brouwers Construction waste: quantification and source evaluation J. Constr. Eng. Manage. 122 1 1996 55 60
-
(1996)
J. Constr. Eng. Manage.
, vol.122
, Issue.1
, pp. 55-60
-
-
Bossink, A.G.1
Brouwers, H.J.H.2
-
6
-
-
34547816008
-
Developing a framework for sustainability management in engineering SMEs
-
S. Burke, and W.F. Gaughran Developing a framework for sustainability management in engineering SMEs Robot. Comput. Integ. Manuf. 23 2007 696 703
-
(2007)
Robot. Comput. Integ. Manuf.
, vol.23
, pp. 696-703
-
-
Burke, S.1
Gaughran, W.F.2
-
7
-
-
0036680228
-
An application of bar-code system for reducing construction wastes
-
Z. Chen, H. Li, and C.T.C. Wong An application of bar-code system for reducing construction wastes Automat. Constr. 11 5 2002 521 533
-
(2002)
Automat. Constr.
, vol.11
, Issue.5
, pp. 521-533
-
-
Chen, Z.1
Li, H.2
Wong, C.T.C.3
-
14
-
-
33244459426
-
A model for assessing the economic viability of construction and demolition waste recycling - The case of Ireland
-
X. Duran, H. Lenihan, and B. O'Regan A model for assessing the economic viability of construction and demolition waste recycling - the case of Ireland Resour. Conserv. Recycl. 46 3 2006 302 320
-
(2006)
Resour. Conserv. Recycl.
, vol.46
, Issue.3
, pp. 302-320
-
-
Duran, X.1
Lenihan, H.2
O'Regan, B.3
-
15
-
-
1842736956
-
Building waste assessment score: Design-based tool
-
L.L. Ekanayake, and G. Ofori Building waste assessment score: design-based tool Build. Environ. 39 7 2004 851 861
-
(2004)
Build. Environ.
, vol.39
, Issue.7
, pp. 851-861
-
-
Ekanayake, L.L.1
Ofori, G.2
-
16
-
-
84968147098
-
Towards the sustainable corporation: Win-win-win business strategies for sustainable development
-
J. Elkington Towards the sustainable corporation: win-win-win business strategies for sustainable development Calif. Manage. Rev. 36 2 1994 90 100
-
(1994)
Calif. Manage. Rev.
, vol.36
, Issue.2
, pp. 90-100
-
-
Elkington, J.1
-
18
-
-
33751518002
-
A study conducted to reduce construction waste generation in Turkey
-
T. Esin, and N. Cosgun A study conducted to reduce construction waste generation in Turkey Build. Environ. 42 4 2007 1667 1674
-
(2007)
Build. Environ.
, vol.42
, Issue.4
, pp. 1667-1674
-
-
Esin, T.1
Cosgun, N.2
-
19
-
-
84993047549
-
Minimizing waste on construction project sites
-
O.O. Faniran, and G. Caban Minimizing waste on construction project sites Eng. Constr. Architect. Manage. 5 2 1998 182 188
-
(1998)
Eng. Constr. Architect. Manage.
, vol.5
, Issue.2
, pp. 182-188
-
-
Faniran, O.O.1
Caban, G.2
-
20
-
-
77957885330
-
A methodology to identify sustainability indicators in construction project management - Application to infrastructure projects in Spain
-
G. Fernandez, and F. Rodriguez A methodology to identify sustainability indicators in construction project management - application to infrastructure projects in Spain Ecol. Indic. 10 2010 1193 1201
-
(2010)
Ecol. Indic.
, vol.10
, pp. 1193-1201
-
-
Fernandez, G.1
Rodriguez, F.2
-
22
-
-
0141792299
-
Building waste management in Bulgaria: Challenges and opportunities
-
R. Hadjieva-Zaharieva, E. Dimitrova, and F. Buyle-Bodin Building waste management in Bulgaria: challenges and opportunities Waste Manage. 23 8 2003 749 761
-
(2003)
Waste Manage.
, vol.23
, Issue.8
, pp. 749-761
-
-
Hadjieva-Zaharieva, R.1
Dimitrova, E.2
Buyle-Bodin, F.3
-
23
-
-
39749181110
-
Managing construction waste on-site through system dynamics modeling: The case of Hong Kong
-
J.L. Hao, M.J. Hills, and L.Y. Shen Managing construction waste on-site through system dynamics modeling: the case of Hong Kong Eng. Constr. Architect. Manage. 15 2 2008 103 113
-
(2008)
Eng. Constr. Architect. Manage.
, vol.15
, Issue.2
, pp. 103-113
-
-
Hao, J.L.1
Hills, M.J.2
Shen, L.Y.3
-
24
-
-
84946923457
-
-
HKEPD (Hong Kong Environment Protection Department)
-
HKEPD (Hong Kong Environment Protection Department) Monitoring of Solid Waste in Hong Kong 2007 https://www.wastereduction.gov.hk/en/materials/info/
-
(2007)
Monitoring of Solid Waste in Hong Kong
-
-
-
27
-
-
55549143657
-
Quantifying the waste reduction potential of using prefabrication in building construction in Hong Kong
-
L. Jaillon, C.S. Poon, and Y.H. Chiang Quantifying the waste reduction potential of using prefabrication in building construction in Hong Kong Waste Manage. 29 1 2009 309 320
-
(2009)
Waste Manage.
, vol.29
, Issue.1
, pp. 309-320
-
-
Jaillon, L.1
Poon, C.S.2
Chiang, Y.H.3
-
28
-
-
33947202189
-
Treatment of commercial, construction and demolition waste in North Rthine-Westphalia: Policy-making and operation options
-
V. Karavezyris Treatment of commercial, construction and demolition waste in North Rthine-Westphalia: policy-making and operation options Waste Manage. 25 2 2007 183 189
-
(2007)
Waste Manage.
, vol.25
, Issue.2
, pp. 183-189
-
-
Karavezyris, V.1
-
29
-
-
9644252862
-
Environmental management of construction and demolition waste in Kuwait
-
N. Kartam, N. Al-Mutairi, I. Al-Ghusain, and J. Al-Humoud Environmental management of construction and demolition waste in Kuwait Waste Manage. 24 10 2004 1049 1059
-
(2004)
Waste Manage.
, vol.24
, Issue.10
, pp. 1049-1059
-
-
Kartam, N.1
Al-Mutairi, N.2
Al-Ghusain, I.3
Al-Humoud, J.4
-
32
-
-
0034049562
-
Employee perceptions of the solid waste management system operation in a large Australia contracting organization: Implications for company policy implementation
-
H. Lingard, P. Graham, and G. Smithers Employee perceptions of the solid waste management system operation in a large Australia contracting organization: implications for company policy implementation Constr. Manage. Econ. 18 4 2000 383 393
-
(2000)
Constr. Manage. Econ.
, vol.18
, Issue.4
, pp. 383-393
-
-
Lingard, H.1
Graham, P.2
Smithers, G.3
-
33
-
-
78649322407
-
Exploring critical success factors for waste management in construction projects of China
-
W.S. Lu, and H.P. Yuan Exploring critical success factors for waste management in construction projects of China Resour. Conserv. Recycl. 55 2 2010 201 208
-
(2010)
Resour. Conserv. Recycl.
, vol.55
, Issue.2
, pp. 201-208
-
-
Lu, W.S.1
Yuan, H.P.2
-
34
-
-
79951558224
-
An empirical investigation of construction and demolition waste generation rates in Shenzhen city, South China
-
W.S. Lu, H.P. Yuan, J.R. Li, J.L. Hao, X.M. Mi, and Z.K. Ding An empirical investigation of construction and demolition waste generation rates in Shenzhen city, South China Waste Manage. 31 2011 680 687
-
(2011)
Waste Manage.
, vol.31
, pp. 680-687
-
-
Lu, W.S.1
Yuan, H.P.2
Li, J.R.3
Hao, J.L.4
Mi, X.M.5
Ding, Z.K.6
-
37
-
-
0033099577
-
A cost effective waste management plan
-
T.H. Mills, E. Showalter, and D. Jarman A cost effective waste management plan Cost Eng. 41 3 1999 35 43
-
(1999)
Cost Eng.
, vol.41
, Issue.3
, pp. 35-43
-
-
Mills, T.H.1
Showalter, E.2
Jarman, D.3
-
39
-
-
0000705512
-
The environment: The fourth construction project objective?
-
G. Ofori The environment: the fourth construction project objective? Constr. Manage. Econ. 10 5 1992 369 395
-
(1992)
Constr. Manage. Econ.
, vol.10
, Issue.5
, pp. 369-395
-
-
Ofori, G.1
-
40
-
-
75849159199
-
Environmental performance of construction waste: Comparing three scenarios from a case study in Catalonia, Spain
-
O. Ortiz, J.C. Pasqualino, and F. Castells Environmental performance of construction waste: comparing three scenarios from a case study in Catalonia, Spain Waste Manage. 30 4 2010 646 654
-
(2010)
Waste Manage.
, vol.30
, Issue.4
, pp. 646-654
-
-
Ortiz, O.1
Pasqualino, J.C.2
Castells, F.3
-
42
-
-
42149102027
-
Architects' perspectives on construction waste reduction by design
-
M. Osmani, J. Glass, and A.D.F. Price Architects' perspectives on construction waste reduction by design Waste Manage. 28 7 2008 1147 1158
-
(2008)
Waste Manage.
, vol.28
, Issue.7
, pp. 1147-1158
-
-
Osmani, M.1
Glass, J.2
Price, A.D.F.3
-
43
-
-
0034996007
-
On-site sorting of construction and demolition waste in Hong Kong
-
C.S. Poon, A.T.W. Yu, and L.H. Ng On-site sorting of construction and demolition waste in Hong Kong Resour. Conserv. Recycl. 32 2 2001 157 172
-
(2001)
Resour. Conserv. Recycl.
, vol.32
, Issue.2
, pp. 157-172
-
-
Poon, C.S.1
Yu, A.T.W.2
Ng, L.H.3
-
44
-
-
3242723881
-
Comparison of low-waste building technologies adopted in public and private housing projects in Hong Kong
-
C.S. Poon, A.T.W. Yu, and L.H. Ng Comparison of low-waste building technologies adopted in public and private housing projects in Hong Kong Eng. Constr. Architect. Manage. 10 2 2003 88 98
-
(2003)
Eng. Constr. Architect. Manage.
, vol.10
, Issue.2
, pp. 88-98
-
-
Poon, C.S.1
Yu, A.T.W.2
Ng, L.H.3
-
45
-
-
3242699509
-
Reducing building waste at construction sites in Hong Kong
-
C.S. Poon, A.T.W. Yu, and L. Jaillon Reducing building waste at construction sites in Hong Kong Constr. Manage. Econ. 22 5 2004 461 470
-
(2004)
Constr. Manage. Econ.
, vol.22
, Issue.5
, pp. 461-470
-
-
Poon, C.S.1
Yu, A.T.W.2
Jaillon, L.3
-
46
-
-
71649091390
-
A discussion on the reuse of building components in Brazil: An analysis of major social, economical and legal factors
-
C.G. Rocha, and M.A. Sattler A discussion on the reuse of building components in Brazil: an analysis of major social, economical and legal factors Waste Manage. 54 2009 104 112
-
(2009)
Waste Manage.
, vol.54
, pp. 104-112
-
-
Rocha, C.G.1
Sattler, M.A.2
-
48
-
-
37849047249
-
A checklist for assessing sustainable performance of construction projects
-
L.Y. Shen, J.L. Hao, V.W.Y. Tam, and H. Yao A checklist for assessing sustainable performance of construction projects J. Civil Eng. Manage. 13 4 2007 273 281
-
(2007)
J. Civil Eng. Manage.
, vol.13
, Issue.4
, pp. 273-281
-
-
Shen, L.Y.1
Hao, J.L.2
Tam, V.W.Y.3
Yao, H.4
-
49
-
-
0036778996
-
Implementation of environmental management in the Hong Kong construction industry
-
L.Y. Shen, and V.W.Y. Tam Implementation of environmental management in the Hong Kong construction industry Int. J. Proj. Manage. 20 7 2002 535 543
-
(2002)
Int. J. Proj. Manage.
, vol.20
, Issue.7
, pp. 535-543
-
-
Shen, L.Y.1
Tam, V.W.Y.2
-
50
-
-
13944266403
-
Mapping approach for examining waste management on construction sites
-
L.Y. Shen, V.W.Y. Tam, C.M. Tam, and D. Drew Mapping approach for examining waste management on construction sites J. Constr. Eng. Manage. 130 4 2004 472 481
-
(2004)
J. Constr. Eng. Manage.
, vol.130
, Issue.4
, pp. 472-481
-
-
Shen, L.Y.1
Tam, V.W.Y.2
Tam, C.M.3
Drew, D.4
-
51
-
-
33646746594
-
Improving environmental performance by means of empowerment of contractors
-
L.Y. Shen, H. Yao, and G. Alan Improving environmental performance by means of empowerment of contractors Manage. Environ. Qual. Int. J. 17 3 2006 242 257
-
(2006)
Manage. Environ. Qual. Int. J.
, vol.17
, Issue.3
, pp. 242-257
-
-
Shen, L.Y.1
Yao, H.2
Alan, G.3
-
52
-
-
0000278010
-
CIB agenda 21 for sustainable construction
-
C. Sjostrom, and W. Bakens CIB agenda 21 for sustainable construction Build. Res. Inf. 27 6 1999 347 353
-
(1999)
Build. Res. Inf.
, vol.27
, Issue.6
, pp. 347-353
-
-
Sjostrom, C.1
Bakens, W.2
-
57
-
-
40849086243
-
On the effectiveness in implementing a waste management plan method in construction
-
V.W.Y. Tam On the effectiveness in implementing a waste management plan method in construction Waste Manage. 28 6 2008 1072 1080
-
(2008)
Waste Manage.
, vol.28
, Issue.6
, pp. 1072-1080
-
-
Tam, V.W.Y.1
-
58
-
-
34249942080
-
Towards adoption of prefabrication in construction
-
V.W.Y. Tam, C.M. Tam, S.X. Zeng, and C.Y. Ng Towards adoption of prefabrication in construction Build. Environ. 42 10 2007 3642 3654
-
(2007)
Build. Environ.
, vol.42
, Issue.10
, pp. 3642-3654
-
-
Tam, V.W.Y.1
Tam, C.M.2
Zeng, S.X.3
Ng, C.Y.4
-
59
-
-
0035501639
-
A theory of waste behavior in the construction industry
-
M.M.M. Teo, and M. Loosemore A theory of waste behavior in the construction industry Constr. Manage. Econ. 19 7 2001 741 751
-
(2001)
Constr. Manage. Econ.
, vol.19
, Issue.7
, pp. 741-751
-
-
Teo, M.M.M.1
Loosemore, M.2
-
62
-
-
70449123816
-
Indicators of sustainable forestry: The association between wildlife species and forest structure in Finland
-
K. Vierikko, J. Pellikka, I. Hanski, and T. Myllyviita Indicators of sustainable forestry: the association between wildlife species and forest structure in Finland Ecol. Indic. 10 2 2010 361 369
-
(2010)
Ecol. Indic.
, vol.10
, Issue.2
, pp. 361-369
-
-
Vierikko, K.1
Pellikka, J.2
Hanski, I.3
Myllyviita, T.4
-
63
-
-
77956629198
-
Critical success factors for on-site sorting of construction waste: A China study
-
J.Y. Wang, H.P. Yuan, X.P. Kang, and W.S. Lu Critical success factors for on-site sorting of construction waste: a China study Resour. Conserv. Recycl. 54 2010 931 936
-
(2010)
Resour. Conserv. Recycl.
, vol.54
, pp. 931-936
-
-
Wang, J.Y.1
Yuan, H.P.2
Kang, X.P.3
Lu, W.S.4
-
64
-
-
77956627614
-
Research on management measures for reducing construction waste
-
J.Y. Wang, X.P. Kang, L.Y. Shen, and Y.E. Tan Research on management measures for reducing construction waste Architect. Technol. 35 10 2004 732 734
-
(2004)
Architect. Technol.
, vol.35
, Issue.10
, pp. 732-734
-
-
Wang, J.Y.1
Kang, X.P.2
Shen, L.Y.3
Tan, Y.E.4
-
65
-
-
0003545437
-
-
Wced (world Commission On Environment And Development) Oxford University Press UK
-
WCED (World Commission on Environment and Development) Our Common Future 1987 Oxford University Press UK pp. 1-23
-
(1987)
Our Common Future
, pp. 1-23
-
-
-
68
-
-
79951551147
-
Trend of the research on construction and demolition waste management
-
H.P. Yuan, and L.Y. Shen Trend of the research on construction and demolition waste management Waste Manage. 31 2011 670 679
-
(2011)
Waste Manage.
, vol.31
, pp. 670-679
-
-
Yuan, H.P.1
Shen, L.Y.2
-
69
-
-
79953271722
-
Major obstacles to improving the performance of waste management in China's construction industry
-
H.P. Yuan, L.Y. Shen, and J.Y. Wang Major obstacles to improving the performance of waste management in China's construction industry Facilities 29 5/6 2011 224 242
-
(2011)
Facilities
, vol.29
, Issue.5-6
, pp. 224-242
-
-
Yuan, H.P.1
Shen, L.Y.2
Wang, J.Y.3
|