메뉴 건너뛰기




Volumn 3, Issue 3, 2012, Pages 1075-1081

Cost-benefit analyses of active distribution network management, part II: Investment reduction analysis

Author keywords

Active network management; distribution network; network planning; renewable energy generation

Indexed keywords

ACTIVE CONTROL SYSTEMS; ACTIVE DISTRIBUTION NETWORK MANAGEMENT; ANNUAL OUTPUT; DECOMPOSITION METHODS; DURATION CURVE; LOAD LEVELS; NETWORK EXPANSION; NETWORK EXPANSION PLANNING; NETWORK INVESTMENT; NETWORK PLANNING; NETWORK REINFORCEMENTS; OPERATIONAL CONDITIONS; RENEWABLE ENERGY GENERATION; SECURITY CRITERION; TOTAL COSTS; WIND FARM;

EID: 84865472656     PISSN: 19493053     EISSN: None     Source Type: Journal    
DOI: 10.1109/TSG.2011.2177869     Document Type: Article
Times cited : (60)

References (21)
  • 2
    • 78649529894 scopus 로고    scopus 로고
    • AuRA-NMS: An autonomous regional active network management system for EDF energy and SP energy networks
    • Jul. 25-29
    • E. M. Davidson, M. J. Dolan, G. W. Ault, and S. D. J. McArthur, "AuRA-NMS: An autonomous regional active network management system for EDF energy and SP energy networks", in Proc. IEEE Power Energy Soc. Gen. Meet., Jul. 25-29, 2010.
    • (2010) Proc. IEEE Power Energy Soc. Gen. Meet.
    • Davidson, E.M.1    Dolan, M.J.2    Ault, G.W.3    McArthur, S.D.J.4
  • 3
    • 84865456948 scopus 로고    scopus 로고
    • Cost-benefit analyses of active distribution network management, part I: Annual benefit analysis
    • submitted for publication
    • Z. Hu and F. Li, "Cost-benefit analyses of active distribution network management, part I: Annual benefit analysis", IEEE Trans. Smart Grid, submitted for publication.
    • IEEE Trans. Smart Grid
    • Hu, Z.1    Li, F.2
  • 5
    • 0037843031 scopus 로고    scopus 로고
    • Classification of publications and models on transmission expansion planning
    • May.
    • G. Latorre, R. D. Cruz, J. M. Areiza, and A. Villegas, "Classification of publications and models on transmission expansion planning", IEEE Trans. Power Syst., vol. 18, no. 2, pp. 938-946, May 2003.
    • (2003) IEEE Trans. Power Syst. , vol.18 , Issue.2 , pp. 938-946
    • Latorre, G.1    Cruz, R.D.2    Areiza, J.M.3    Villegas, A.4
  • 6
    • 0042526113 scopus 로고    scopus 로고
    • Transmission expansion planning: A mixed-integer LP approach
    • Aug.
    • N. Alguacil, A. L. Motto, and A. J. Conejo, "Transmission expansion planning: A mixed-integer LP approach", IEEE Trans. Power Syst., vol. 18, no. 3, pp. 1070-1077, Aug. 2003.
    • (2003) IEEE Trans. Power Syst. , vol.18 , Issue.3 , pp. 1070-1077
    • Alguacil, N.1    Motto, A.L.2    Conejo, A.J.3
  • 7
    • 0035425561 scopus 로고    scopus 로고
    • A mixed integer disjunctive model for transmission network expansion
    • DOI 10.1109/59.932295, PII S0885895001060801
    • L. Bahiense, G. C. Oliveira, M. Pereira, and S. Granville, "A mixed integer disjunctive model for transmission network expansion", IEEE Trans. Power Syst., vol. 16, no. 3, pp. 560-565, Aug. 2001. (Pubitemid 32680757)
    • (2001) IEEE Transactions on Power Systems , vol.16 , Issue.3 , pp. 560-565
    • Bahiense, L.1    Oliveira, G.C.2    Pereira, M.3    Granville, S.4
  • 9
    • 77951264706 scopus 로고    scopus 로고
    • Security-constrained transmission planning: A mixed-integer disjunctive approach
    • Aug
    • G. C. Oliveira, S. Binato, L. Bahiense, L. Thomé, and M. V. Pereira, "Security-constrained transmission planning: A mixed-integer disjunctive approach", Optim. Online, Aug. 2004 [Online]. Available: http://www.optimizationonline.org
    • (2004) Optim. Online
    • Oliveira, G.C.1    Binato, S.2    Bahiense, L.3    Thomé, L.4    Pereira, M.V.5
  • 10
    • 68349154621 scopus 로고    scopus 로고
    • Market-based generation and transmission planning with uncertainties
    • Aug.
    • J. H. Roh, M. Shahidehpour, and L. Wu, "Market-based generation and transmission planning with uncertainties", IEEE Trans. Power Syst., vol. 24, no. 3, pp. 1587-1598, Aug. 2009.
    • (2009) IEEE Trans. Power Syst. , vol.24 , Issue.3 , pp. 1587-1598
    • Roh, J.H.1    Shahidehpour, M.2    Wu, L.3
  • 11
    • 33947301794 scopus 로고    scopus 로고
    • Reliability-based transmission reinforcement planning associated with large-scale wind farms
    • DOI 10.1109/TPWRS.2006.889126
    • R. Billinton and W. Wangdee, "Reliability-based transmission reinforcement planning associated with large-scale wind farms", IEEE Trans. Power Syst., vol. 22, no. 1, pp. 34-41, Feb. 2007. (Pubitemid 46437713)
    • (2007) IEEE Transactions on Power Systems , vol.22 , Issue.1 , pp. 34-41
    • Billinton, R.1    Wangdee, W.2
  • 12
    • 71849084961 scopus 로고    scopus 로고
    • A conceptual study on reliability constrained transmission system planning including wind power
    • Jul. 26-30
    • L. Wang and C. Singh, "A conceptual study on reliability constrained transmission system planning including wind power", in Proc. IEEE Power Energy Soc. Gen. Meet., Jul. 26-30, 2009.
    • (2009) Proc. IEEE Power Energy Soc. Gen. Meet.
    • Wang, L.1    Singh, C.2
  • 13
    • 4043183268 scopus 로고    scopus 로고
    • Application of interruptible contracts to increase wind-power penetration in congested areas
    • Aug.
    • J. Kabouris and C. D. Vournas, "Application of interruptible contracts to increase wind-power penetration in congested areas", IEEE Trans. Power Syst., vol. 19, no. 3, pp. 1642-1649, Aug. 2004.
    • (2004) IEEE Trans. Power Syst. , vol.19 , Issue.3 , pp. 1642-1649
    • Kabouris, J.1    Vournas, C.D.2
  • 14
    • 0031198932 scopus 로고    scopus 로고
    • Power distribution planning: A review of models and issues
    • S. K. Khator and L. C. Leung, "Power distribution planning: A review of models and issues", IEEE Trans. Power Syst., vol. 12, no. 3, pp. 1151-1159, Aug. 1997. (Pubitemid 127771490)
    • (1997) IEEE Transactions on Power Systems , vol.12 , Issue.3 , pp. 1151-1159
    • Khator, S.K.1    Leung, L.C.2
  • 15
    • 43849107458 scopus 로고    scopus 로고
    • Models for quantifying the economic benefits of distributed generation
    • DOI 10.1109/TPWRS.2008.920718
    • H. A. Gil and G. Joos, "Models for quantifying the economic benefits of distributed generation", IEEE Trans. Power Syst., vol. 23, no. 2, pp. 327-335, May 2008. (Pubitemid 351695810)
    • (2008) IEEE Transactions on Power Systems , vol.23 , Issue.2 , pp. 327-335
    • Gil, H.A.1    Joos, G.2
  • 16
    • 68349131737 scopus 로고    scopus 로고
    • Evaluating the impact of network investment deferral on distributed generation expansion
    • Aug.
    • A. Piccolo and P. Siano, "Evaluating the impact of network investment deferral on distributed generation expansion", IEEE Trans. Power Syst., vol. 24, no. 3, pp. 1559-1567, Aug. 2009.
    • (2009) IEEE Trans. Power Syst. , vol.24 , Issue.3 , pp. 1559-1567
    • Piccolo, A.1    Siano, P.2
  • 17
    • 33746190662 scopus 로고    scopus 로고
    • Methodology for determination of economic connection capacity for renewable generator connections to distribution networks optimised by active power flow management
    • DOI 10.1049/ip-gtd:20050173
    • R. A. F. Currie, G. W. Ault, and J. R. McDonald, "Methodology for determination of economic connection capacity for renewable generator connections to distribution networks optimised by active power flow management", IEE Proc. Gener., Transm., Distrib., vol. 153, no. 4, pp. 456-462, Jul. 2006. (Pubitemid 44090991)
    • (2006) IEE Proceedings: Generation, Transmission and Distribution , vol.153 , Issue.4 , pp. 456-462
    • Currie, R.A.F.1    Ault, G.W.2    McDonald, J.R.3
  • 18
    • 50249135416 scopus 로고    scopus 로고
    • Network management systems for active distribution networks-A feasibility study
    • Contract Number: K/EL/00310/00/00, URN Number: 04/1361
    • D. Roberts, "Network management systems for active distribution networks-A feasibility study", DTI Distributed Generation Programme (Contractor: SP Power Systems LTD), 2004, Contract Number: K/EL/00310/00/00, URN Number: 04/1361.
    • (2004) DTI Distributed Generation Programme (Contractor: SP Power Systems LTD)
    • Roberts, D.1
  • 19
    • 43849112156 scopus 로고    scopus 로고
    • Congestion-driven transmission planning considering the impact of generator expansion
    • DOI 10.1109/TPWRS.2008.919248
    • O. B. Tor, A. N. Guven, and M. Shahidehpour, "Congestion-driven transmission planning considering the impact of generator expansion", IEEE Trans. Power Syst., vol. 23, no. 2, pp. 781-789, May 2008. (Pubitemid 351695859)
    • (2008) IEEE Transactions on Power Systems , vol.23 , Issue.2 , pp. 781-789
    • Tor, O.B.1    Guven, A.N.2    Shahidehpour, M.3
  • 20
    • 78649608570 scopus 로고    scopus 로고
    • Network expansion planning considering N-1 security criterion by iterative mixed-integer programming approach
    • Jul.
    • Z. Hu and F. Li, "Network expansion planning considering N-1 security criterion by iterative mixed-integer programming approach", in Proc. IEEE PES Gen. Meet., Jul. 2010.
    • (2010) Proc. IEEE PES Gen. Meet.
    • Hu, Z.1    Li, F.2
  • 21
    • 84865449235 scopus 로고    scopus 로고
    • "Distribution Price Control Review 5 (DPCR5) " [Online]. Available: http://www.ofgem.gov.uk/Networks/ElecDist/PriceCntrls/DPCR5/Pages/ DPCR5.aspx


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.