메뉴 건너뛰기




Volumn 39, Issue 17, 2012, Pages 12975-12983

Genetic algorithms for door-assigning and sequencing of trucks at distribution centers for the improvement of operational performance

Author keywords

Distribution center; Genetic algorithm; Supply chain; Truck scheduling

Indexed keywords

CROSSDOCKING; DISTRIBUTION CENTERS; INNOVATIVE SYSTEMS; INTELLIGENT GENETIC ALGORITHM; OPERATIONAL PERFORMANCE; OPTIMAL SOLUTIONS; SCHEDULING PROBLEM; TRUCK SCHEDULING;

EID: 84865044979     PISSN: 09574174     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.eswa.2012.05.057     Document Type: Article
Times cited : (46)

References (24)
  • 1
    • 10444242132 scopus 로고    scopus 로고
    • Effective cross docking for improving distribution efficiencies
    • U.M. Apte, and S. Viswanathan Effective cross docking for improving distribution efficiencies International Journal of Logistics 3 2000 291 302
    • (2000) International Journal of Logistics , vol.3 , pp. 291-302
    • Apte, U.M.1    Viswanathan, S.2
  • 2
    • 79951578965 scopus 로고    scopus 로고
    • Non-identical parallel machine scheduling using genetic algorithm
    • S. Balin Non-identical parallel machine scheduling using genetic algorithm Expert Systems with Applications 38 2011 6814 6821
    • (2011) Expert Systems with Applications , vol.38 , pp. 6814-6821
    • Balin, S.1
  • 3
    • 0034313705 scopus 로고    scopus 로고
    • Reducing labor costs in an LTL crossdocking terminal
    • J.J. Bartholdi, and K.R. Gue Reducing labor costs in an LTL crossdocking terminal Operations Research 48 2000 823 832 (Pubitemid 32189521)
    • (2000) Operations Research , vol.48 , Issue.6 , pp. 823-832
    • Bartholdi III, J.J.1    Gue, K.R.2
  • 5
    • 78049529305 scopus 로고    scopus 로고
    • Meta-heuristics implementation for scheduling of trucks in a cross-docking system with temporary storage
    • A.R. Boloori Arabani, S.M.T. Fatemi Ghomi, and M. Zandieh Meta-heuristics implementation for scheduling of trucks in a cross-docking system with temporary storage Expert Systems with Applications 38 2011 1964 1979
    • (2011) Expert Systems with Applications , vol.38 , pp. 1964-1979
    • Boloori Arabani, A.R.1    Fatemi Ghomi, S.M.T.2    Zandieh, M.3
  • 6
    • 68249114212 scopus 로고    scopus 로고
    • Truck scheduling at zero-inventory cross docking terminals
    • N. Boysen Truck scheduling at zero-inventory cross docking terminals Computers & Operations Research 37 2010 32 41
    • (2010) Computers & Operations Research , vol.37 , pp. 32-41
    • Boysen, N.1
  • 7
    • 77952544548 scopus 로고    scopus 로고
    • Cross dock scheduling: Classification, literature review and research agenda
    • N. Boysen, and M. Fliedner Cross dock scheduling: Classification, literature review and research agenda Omega 38 2010 413 422
    • (2010) Omega , vol.38 , pp. 413-422
    • Boysen, N.1    Fliedner, M.2
  • 8
    • 71149103397 scopus 로고    scopus 로고
    • Scheduling inbound and outbound trucks at cross docking terminals
    • N. Boysen, M. Fliedner, and A. Scholl Scheduling inbound and outbound trucks at cross docking terminals OR Spectrum 32 2010 135 161
    • (2010) OR Spectrum , vol.32 , pp. 135-161
    • Boysen, N.1    Fliedner, M.2    Scholl, A.3
  • 9
    • 51149115118 scopus 로고    scopus 로고
    • Optimizing inbound and outbound door assignments in less-than-truckload crossdocks
    • Y. Bozer, and H. Carlo Optimizing inbound and outbound door assignments in less-than-truckload crossdocks IIE Transactions 40 2008 1007 1018
    • (2008) IIE Transactions , vol.40 , pp. 1007-1018
    • Bozer, Y.1    Carlo, H.2
  • 10
    • 79952443916 scopus 로고    scopus 로고
    • A genetic algorithm-based scheduler for multiproduct parallel machine sheet metal job shop
    • F.T.S. Chan, K.L. Choy, and Bibhushan A genetic algorithm-based scheduler for multiproduct parallel machine sheet metal job shop Expert Systems with Applications 38 2011 8703 8715
    • (2011) Expert Systems with Applications , vol.38 , pp. 8703-8715
    • Chan, F.T.S.1    Choy, K.L.2    Bibhushan3
  • 11
    • 78149335985 scopus 로고    scopus 로고
    • To Wave or Not to Wave? Order Release Policies for Warehouse with an Automated Sorter
    • J. Gallien, and T. Weber To Wave or Not to Wave? Order Release Policies for Warehouse with an Automated Sorter Manufacturing & Service Operations Management 12 4 2010 642 662
    • (2010) Manufacturing & Service Operations Management , vol.12 , Issue.4 , pp. 642-662
    • Gallien, J.1    Weber, T.2
  • 13
    • 0033226199 scopus 로고    scopus 로고
    • Effects of trailer scheduling on the layout of freight terminals
    • K.R. Gue The effect of trailer scheduling on the layout of freight terminals Transportation Science 33 1999 419 428 (Pubitemid 30519521)
    • (1999) Transportation Science , vol.33 , Issue.4 , pp. 419-428
    • Gue, K.R.1
  • 15
    • 78651446515 scopus 로고    scopus 로고
    • A hybrid genetic algorithm for the location routing problem with simultaneous pickup and delivery
    • I. Karaoglan, and F. Altiparmak A hybrid genetic algorithm for the location routing problem with simultaneous pickup and delivery Industrial Engineering & Management Systems 10 1 2011 24 33
    • (2011) Industrial Engineering & Management Systems , vol.10 , Issue.1 , pp. 24-33
    • Karaoglan, I.1    Altiparmak, F.2
  • 17
    • 26444538890 scopus 로고    scopus 로고
    • The parcel hub scheduling problem: A simulation-based solution approach
    • DOI 10.1016/j.cie.2005.07.002, PII S0360835205001038
    • D.L. McWilliams, P.M. Stanfield, and C.D. Geiger The parcel hub scheduling problem: a simulation-based solution approach Computers & Industrial Engineering 49 2005 393 412 (Pubitemid 41436337)
    • (2005) Computers and Industrial Engineering , vol.49 , Issue.3 , pp. 393-412
    • McWilliams, D.L.1    Stanfield, P.M.2    Geiger, C.D.3
  • 18
    • 50849137192 scopus 로고    scopus 로고
    • Truck dock assignment with operational time constraint within crossdocks
    • Z. Miao, A. Lim, and H. Ma Truck dock assignment with operational time constraint within crossdocks European Journal of Operational Research 192 2009 105 115
    • (2009) European Journal of Operational Research , vol.192 , pp. 105-115
    • Miao, Z.1    Lim, A.2    Ma, H.3
  • 19
    • 33749996642 scopus 로고    scopus 로고
    • A dock door assignment problem for the Korean mail distribution center
    • Y. Oh, H. Hwang, C.N. Cha, and S. Lee A dock door assignment problem for the Korean mail distribution center Computers & Industrial Engineering 51 2006 588 596
    • (2006) Computers & Industrial Engineering , vol.51 , pp. 588-596
    • Oh, Y.1    Hwang, H.2    Cha, C.N.3    Lee, S.4
  • 20
    • 77952671660 scopus 로고    scopus 로고
    • Scheduling trucks in cross-docking systems: Robust meta-heuristics approach
    • R. Soltani, and S.J. Sadjadi Scheduling trucks in cross-docking systems: Robust meta-heuristics approach Transportation Part-E 46 2010 650 666
    • (2010) Transportation Part-E , vol.46 , pp. 650-666
    • Soltani, R.1    Sadjadi, S.J.2
  • 21
    • 0025628962 scopus 로고
    • A microcomputer based decision support tool for assigning dock doors in freight yards
    • L.Y. Tsui, and C.H. Chang A microcomputer based decision support tool for assigning dock doors in freight yards Computers & Industrial Engineering 19 1990 309 312
    • (1990) Computers & Industrial Engineering , vol.19 , pp. 309-312
    • Tsui, L.Y.1    Chang, C.H.2
  • 22
  • 23
    • 72149124796 scopus 로고    scopus 로고
    • Scheduling trucks in cross-docking systems: Robust meta-heuristics
    • B. Vahdani, and M. Zandieh Scheduling trucks in cross-docking systems: Robust meta-heuristics Computers & Industrial Engineering 58 2010 12 24
    • (2010) Computers & Industrial Engineering , vol.58 , pp. 12-24
    • Vahdani, B.1    Zandieh, M.2
  • 24
    • 34548432064 scopus 로고    scopus 로고
    • Scheduling of inbound and outbound trucks in cross docking systems with temporary storage
    • DOI 10.1016/j.ejor.2006.10.047, PII S0377221706011052
    • W. Yu, and P.J. Egbelu Scheduling of inbound and outbound trucks in cross docking system with temporary storage European Journal of Operational Research 184 2008 377 396 (Pubitemid 47368913)
    • (2008) European Journal of Operational Research , vol.184 , Issue.1 , pp. 377-396
    • Yu, W.1    Egbelu, P.J.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.