-
1
-
-
0001784424
-
Justifying Investments in Flexible Manufacturing Technology
-
Aggarwal, R. 1991. Justifying Investments in Flexible Manufacturing Technology, Managerial Finance, 17(2), 77-88.
-
(1991)
Managerial Finance
, vol.17
, Issue.2
, pp. 77-88
-
-
Aggarwal, R.1
-
3
-
-
84974402937
-
Risk-Adjusted Values, Timing and Uncertainty Resolution, and the Measurement of Project Worth
-
Bernhard, R.H. 1984. Risk-Adjusted Values, Timing and Uncertainty Resolution, and the Measurement of Project Worth, Journal of Financial and Quantitative Analysis, 19(1), 83-99.
-
(1984)
Journal of Financial and Quantitative Analysis
, vol.19
, Issue.1
, pp. 83-99
-
-
Bernhard, R.H.1
-
4
-
-
0032628183
-
Real Options and Product Life Cycles
-
Bollen, N.P.B. 1999. Real Options and Product Life Cycles, Management Science, 45(5), 670-684.
-
(1999)
Management Science
, vol.45
, Issue.5
, pp. 670-684
-
-
Bollen, N.P.B.1
-
5
-
-
0032656506
-
Cross-Utilization of Workers Whose Capabilities Differ
-
Campbell, G.M. 1999. Cross-Utilization of Workers Whose Capabilities Differ, Management Science, 45(5), 722-732.
-
(1999)
Management Science
, vol.45
, Issue.5
, pp. 722-732
-
-
Campbell, G.M.1
-
7
-
-
0001571982
-
Cross-training Effectiveness and Profitability
-
Ebeling, A.C., and Lee, C.Y. 1994. Cross-training Effectiveness and Profitability, International Journal of Production Research, 32(12), 2843-2859.
-
(1994)
International Journal of Production Research
, vol.32
, Issue.12
, pp. 2843-2859
-
-
Ebeling, A.C.1
Lee, C.Y.2
-
8
-
-
0002910445
-
Multi-Product Manufacturing with Stochastic Input Process and Output Yield Uncertainty
-
Trigeorgis, L. (Ed.), New York: Praeger
-
Ernst, R., and Kamrad, B. 1995. Multi-Product Manufacturing with Stochastic Input Process and Output Yield Uncertainty, in Real Options in Capital Investment: New Contributions, Trigeorgis, L. (Ed.), New York: Praeger.
-
(1995)
Real Options in Capital Investment: New Contributions
-
-
Ernst, R.1
Kamrad, B.2
-
9
-
-
0031066567
-
Industry Costs of Equity
-
Fama, E.F., and French, K.R. 1997. Industry Costs of Equity, Journal of Financial Economics, 43(2), 153-193.
-
(1997)
Journal of Financial Economics
, vol.43
, Issue.2
, pp. 153-193
-
-
Fama, E.F.1
French, K.R.2
-
10
-
-
0027580682
-
Manufacturing Flexibility: A Strategic Perspective
-
Gerwin, D. 1993. Manufacturing Flexibility: A Strategic Perspective, Management Science, 39(4), 395-410.
-
(1993)
Management Science
, vol.39
, Issue.4
, pp. 395-410
-
-
Gerwin, D.1
-
11
-
-
0003890315
-
-
5th ed., Upper Saddle River, NJ: Prentice Hall
-
Hull, J. 2003. Options, Futures, and Other Derivatives. 5th ed., Upper Saddle River, NJ: Prentice Hall.
-
(2003)
Options, Futures, and Other Derivatives
-
-
Hull, J.1
-
12
-
-
0024107189
-
Valuing the Flexibility of Flexible Manufacturing Systems
-
Kulatilaka, N. 1988. Valuing the Flexibility of Flexible Manufacturing Systems, IEEE Transactions in Engineering Management, 35(4), 250-257.
-
(1988)
IEEE Transactions in Engineering Management
, vol.35
, Issue.4
, pp. 250-257
-
-
Kulatilaka, N.1
-
13
-
-
0032137432
-
Strategic Growth Options
-
Kulatilaka, N., and Perotti, E.C. 1998. Strategic Growth Options, Management Science, 44(8), 1021-1031.
-
(1998)
Management Science
, vol.44
, Issue.8
, pp. 1021-1031
-
-
Kulatilaka, N.1
Perotti, E.C.2
-
14
-
-
0001522113
-
The General Flexibility to Switch: Real Options Revisited
-
Kulatilaka, N., and Trigeorgis, L. 1994. The General Flexibility to Switch: Real Options Revisited, International Journal of Finance, 6(2), 778-798.
-
(1994)
International Journal of Finance
, vol.6
, Issue.2
, pp. 778-798
-
-
Kulatilaka, N.1
Trigeorgis, L.2
-
15
-
-
0018037554
-
Learning as Accumulation: A Reexamination of the Learning Curve
-
Mazur, J.E., and Hastie, R. 1978. Learning as Accumulation: A Reexamination of the Learning Curve, Psychological Bulletin, 85(6), 1256-1274.
-
(1978)
Psychological Bulletin
, vol.85
, Issue.6
, pp. 1256-1274
-
-
Mazur, J.E.1
Hastie, R.2
-
16
-
-
0032632662
-
Functional Flexibility and Team Performance
-
Molleman, E., and Slomp, J. 1999 Functional Flexibility and Team Performance, International Journal of Production Research, 37(8), 1837-1858.
-
(1999)
International Journal of Production Research
, vol.37
, Issue.8
, pp. 1837-1858
-
-
Molleman, E.1
Slomp, J.2
-
18
-
-
85111170988
-
A Real Options Model for Workforce Cross Training
-
Nembhard, D.A., H.B. Nembhard, and R. Qin. 2005a. A Real Options Model for Workforce Cross Training, The Engineering Economist, 36(10), 919-940.
-
(2005)
The Engineering Economist
, vol.36
, Issue.10
, pp. 919-940
-
-
Nembhard, D.A.1
Nembhard, H.B.2
Qin, R.3
-
20
-
-
24944592113
-
A Real Options Based Analysis for Supply Chain Decisions
-
Nembhard, H.B., Shi, L., and Aktan, M. 2005c. A Real Options Based Analysis for Supply Chain Decisions, IIE Transactions (special issue on Financial Engineering), 37(10), 945-956.
-
(2005)
IIE Transactions (special issue on Financial Engineering)
, vol.37
, Issue.10
, pp. 945-956
-
-
Nembhard, H.B.1
Shi, L.2
Aktan, M.3
-
22
-
-
84888611565
-
A Real Options Design for Quality Control Charts
-
Nembhard, H.B., Shi, L., and Aktan, M. 2001. A Real Options Design for Quality Control Charts, The Engineering Economist, 47(1), 28-59.
-
(2001)
The Engineering Economist
, vol.47
, Issue.1
, pp. 28-59
-
-
Nembhard, H.B.1
Shi, L.2
Aktan, M.3
-
23
-
-
22444438982
-
A Real Options Design for Product Outsourcing
-
Nembhard, H.B., Shi, L., and Aktan, M. 2003. A Real Options Design for Product Outsourcing, The Engineering Economist, 48(3), 199-217.
-
(2003)
The Engineering Economist
, vol.48
, Issue.3
, pp. 199-217
-
-
Nembhard, H.B.1
Shi, L.2
Aktan, M.3
-
24
-
-
0007896451
-
Real Options Models for Managing Manufacturing System Changes in the New Economy
-
Nembhard, H.B., Shi, L., and Park, C.S. 2000. Real Options Models for Managing Manufacturing System Changes in the New Economy, The Engineering Economist, 45(3), 232-258.
-
(2000)
The Engineering Economist
, vol.45
, Issue.3
, pp. 232-258
-
-
Nembhard, H.B.1
Shi, L.2
Park, C.S.3
-
25
-
-
0032324684
-
Multi-Stage Real Options: The Cases of Information Technology Infrastructure and International Bank Expansion
-
Panayi, S., and Trigeorgis, L. 1998. Multi-Stage Real Options: The Cases of Information Technology Infrastructure and International Bank Expansion, The Quarterly Review of Economics and Finance, 38(3), 675-692.
-
(1998)
The Quarterly Review of Economics and Finance
, vol.38
, Issue.3
, pp. 675-692
-
-
Panayi, S.1
Trigeorgis, L.2
-
27
-
-
84985788526
-
A Study of Labor Allocation Strategies in Cellular Manufacturing
-
Russell, R.S., Huang, P.Y., and Leu, Y. 1991. A Study of Labor Allocation Strategies in Cellular Manufacturing, Decision Sciences, 22(3), 594-611.
-
(1991)
Decision Sciences
, vol.22
, Issue.3
, pp. 594-611
-
-
Russell, R.S.1
Huang, P.Y.2
Leu, Y.3
-
29
-
-
0032157696
-
Multifunctionality: Driving and Constraining Forces
-
van den Beukel, A.L., and Molleman, E. 1998. Multifunctionality: Driving and Constraining Forces, Human Factors and Ergonomics in Manufacturing, 8(4), 303-321.
-
(1998)
Human Factors and Ergonomics in Manufacturing
, vol.8
, Issue.4
, pp. 303-321
-
-
van den Beukel, A.L.1
Molleman, E.2
|