메뉴 건너뛰기




Volumn 13, Issue 2, 2008, Pages 85-95

Perceptions of Singapore construction contractors on construction risk identification

Author keywords

Construction industry; Decision making; Risk analysis; Risk management; Singapore

Indexed keywords


EID: 84864539783     PISSN: 13664387     EISSN: 17598443     Source Type: Journal    
DOI: 10.1108/13664380810898104     Document Type: Article
Times cited : (43)

References (25)
  • 2
    • 0025491311 scopus 로고
    • Systematic risk management approach for construction projects
    • Al-Bahar, J.F. and Crandall, K.C. (1990), “Systematic risk management approach for construction projects”, Construction Engineering and Management, Vol. 116 No. 3, pp. 533-546.
    • (1990) Construction Engineering and Management , vol.116 , Issue.3 , pp. 533-546
    • Al-Bahar, J.F.1    Crandall, K.C.2
  • 4
    • 0008752005 scopus 로고    scopus 로고
    • An analysis of contractors' approaches to risk identification in New South Wales, Australia
    • Bajaj, D., Oluwoye, J. and Lenard, D. (1997), “An analysis of contractors' approaches to risk identification in New South Wales, Australia”, Construction Management and Economics, Vol. 15, pp. 363-369.
    • (1997) Construction Management and Economics , vol.15 , pp. 363-369
    • Bajaj, D.1    Oluwoye, J.2    Lenard, D.3
  • 5
    • 0242411261 scopus 로고    scopus 로고
    • Risk response techniques employed currently for major projects
    • Baker, S., Ponniah, D. and Smith, S. (1999), “Risk response techniques employed currently for major projects”, Construction Management and Economics, Vol. 7, pp. 205-213.
    • (1999) Construction Management and Economics , vol.7 , pp. 205-213
    • Baker, S.1    Ponniah, D.2    Smith, S.3
  • 6
    • 51849102640 scopus 로고    scopus 로고
    • Building and Construction Authority Singapore available at: (accessed March 13, 2005)
    • BCA (2005), BCA Contractors Registry, Building and Construction Authority, Singapore, available at: www.dir.bca.gov.sg/bca/index.asp (accessed March 13, 2005).
    • (2005) BCA Contractors Registry
  • 7
    • 0032346794 scopus 로고    scopus 로고
    • The effectiveness of working group risk identification and assessment techniques
    • Chapman, R.J. (1998), “The effectiveness of working group risk identification and assessment techniques”, International Journal of Project Management, Vol. 16 No. 6, pp. 333-343.
    • (1998) International Journal of Project Management , vol.16 , Issue.6 , pp. 333-343
    • Chapman, R.J.1
  • 10
    • 0032272899 scopus 로고    scopus 로고
    • Survey of tendering practices in the Australian construction industry
    • Fayek, A. and Rolla, A. (1998), “Survey of tendering practices in the Australian construction industry”, Engineering Management Journal, Vol. 10 No. 4, pp. 29-34.
    • (1998) Engineering Management Journal , vol.10 , Issue.4 , pp. 29-34
    • Fayek, A.1    Rolla, A.2
  • 13
    • 0029296896 scopus 로고
    • Elements of cost estimation: a survey in Canada and the United States
    • Hegazy, T. and Moselhi, O. (1995), “Elements of cost estimation: a survey in Canada and the United States”, Cost Engineering, Vol. 37 No. 5, pp. 27-31.
    • (1995) Cost Engineering , vol.37 , Issue.5 , pp. 27-31
    • Hegazy, T.1    Moselhi, O.2
  • 14
    • 0345098580 scopus 로고    scopus 로고
    • Project risk management in the Queensland engineering construction industry: a survey
    • Lyons, T. and Skitmore, M. (2004), “Project risk management in the Queensland engineering construction industry: a survey”, International Journal of Project Management, Vol. 22, pp. 51-61.
    • (2004) International Journal of Project Management , vol.22 , pp. 51-61
    • Lyons, T.1    Skitmore, M.2
  • 15
    • 84912996561 scopus 로고
    • Research on construction industry development at the crossroads
    • Ofori, G. (1993), “Research on construction industry development at the crossroads”, Construction Management and Economics, Vol. 11, pp. 175-185.
    • (1993) Construction Management and Economics , vol.11 , pp. 175-185
    • Ofori, G.1
  • 16
  • 18
    • 0035201702 scopus 로고    scopus 로고
    • Use and benefits of tools for project risk management
    • Raz, T. and Michael, E. (2001), “Use and benefits of tools for project risk management”, International Journal of Project management, Vol. 19, pp. 9-17.
    • (2001) International Journal of Project management , vol.19 , pp. 9-17
    • Raz, T.1    Michael, E.2
  • 19
    • 0001918185 scopus 로고    scopus 로고
    • Risk management: the undiscovered dimension of project management
    • 36770 ed.
    • Royer, P.S. (2000), “Risk management: the undiscovered dimension of project management”, Project Management Network, Vol. 14, 36770 ed., pp. 31-40.
    • (2000) Project Management Network , vol.14 , pp. 31-40
    • Royer, P.S.1
  • 20
    • 0011739273 scopus 로고
    • The effect of contractor size on mark-up size decision in Saudi Arabia
    • Shash, A.A. and Abudul-Hadi, N.H. (1993), “The effect of contractor size on mark-up size decision in Saudi Arabia”, Construction Management and Economics, Vol. 11, pp. 421-428.
    • (1993) Construction Management and Economics , vol.11 , pp. 421-428
    • Shash, A.A.1    Abudul-Hadi, N.H.2
  • 21
    • 0002945913 scopus 로고
    • Usage and benefits of project risk analysis and management
    • Simister, S. (1994), “Usage and benefits of project risk analysis and management”, International Journal of Project Management, Vol. 12, pp. 5-8.
    • (1994) International Journal of Project Management , vol.12 , pp. 5-8
    • Simister, S.1
  • 24
    • 0024053852 scopus 로고    scopus 로고
    • Questionnaire survey on bidding in construction
    • Ahmad, I. and Minkarah, I. (1998), “Questionnaire survey on bidding in construction”, Journal of Management in Engineering, Vol. 3 No. 4, pp. 229-243.
    • (1998) Journal of Management in Engineering , vol.3 , Issue.4 , pp. 229-243
    • Ahmad, I.1    Minkarah, I.2
  • 25
    • 0000643379 scopus 로고
    • Factors considered in tendering decisions by top UK contractors
    • Shash, A.A. (1993), “Factors considered in tendering decisions by top UK contractors”, Construction Management and Economics, Vol. 11, pp. 111-118.
    • (1993) Construction Management and Economics , vol.11 , pp. 111-118
    • Shash, A.A.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.