메뉴 건너뛰기




Volumn 27, Issue 3, 2012, Pages 1594-1601

Incorporating large-scale distant wind farms in probabilistic transmission expansion planning-part II: Case studies

Author keywords

IEEE RTS; Non Dominated Sorting Genetic Algorithm II (NSGA II); Point Estimation Method (PEM); transmission expansion planning (TEP); wind farm

Indexed keywords

IEEE-RTS; NSGA-II; POINT ESTIMATION METHOD; TRANSMISSION EXPANSION PLANNING; WIND FARM;

EID: 84864278812     PISSN: 08858950     EISSN: None     Source Type: Journal    
DOI: 10.1109/TPWRS.2011.2182364     Document Type: Article
Times cited : (53)

References (8)
  • 1
    • 84864276565 scopus 로고    scopus 로고
    • Incorporating large-scale distant wind farms in probabilistic transmission expansion planning-Part I: Theory and algorithm
    • Aug.
    • M. Moeini-Aghtaie, A. Abbaspour, and M. Fotuhi-Firuzabad, "Incorporating large-scale distant wind farms in probabilistic transmission expansion planning-Part I: Theory and algorithm," IEEE Trans. Power Syst., vol. 27, no. 3, pp. 1585-1593, Aug. 2012.
    • (2012) IEEE Trans. Power Syst. , vol.27 , Issue.3 , pp. 1585-1593
    • Moeini-Aghtaie, M.1    Abbaspour, A.2    Fotuhi-Firuzabad, M.3
  • 2
    • 0018544097 scopus 로고
    • IEEE reliability test system
    • Reliability test system task force of the application of probability methods subcommittee Nov./Dec.
    • Reliability test system task force of the application of probability methods subcommittee, "IEEE reliability test system," IEEE Trans. Power App. Syst., vol. PAS-98, no. 6, pp. 2047-2054, Nov./Dec. 1979.
    • (1979) IEEE Trans. Power App. Syst. , vol.PAS-98 , Issue.6 , pp. 2047-2054
  • 3
    • 67349261557 scopus 로고    scopus 로고
    • A multi-objective framework for transmission expansion planning in deregulated environments
    • May
    • P. Maghouli, S. H. Hoseini, M. Oloomi, and M. Shahidehpour, "A multi-objective framework for transmission expansion planning in deregulated environments," IEEE Trans. Power Syst., vol. 24, no. 2, pp. 1051-1061, May 2009.
    • (2009) IEEE Trans. Power Syst. , vol.24 , Issue.2 , pp. 1051-1061
    • Maghouli, P.1    Hoseini, S.H.2    Oloomi, M.3    Shahidehpour, M.4
  • 4
    • 0037292318 scopus 로고    scopus 로고
    • A new strategy for transmission expansion in competitive electricity markets
    • Feb.
    • R. Fang and D. J. Hill, "A new strategy for transmission expansion in competitive electricity markets," IEEE Trans. Power Syst., vol. 18, no. 1, pp. 374-380, Feb. 2003.
    • (2003) IEEE Trans. Power Syst. , vol.18 , Issue.1 , pp. 374-380
    • Fang, R.1    Hill, D.J.2
  • 5
    • 33750196982 scopus 로고    scopus 로고
    • Probabilistic reliability criterion for planning transmission system expansions
    • DOI 10.1049/ip-gtd:20050205
    • J. Choi, T. D.Mount, R. J. Thomas, and R. Billinton, "Probabilistic reliability criterion for planning transmission system expansions," Proc. Inst. Elect. Eng., Gen., Transm., Distrib., vol. 153, no. 6, pp. 719-727, Nov. 2006. (Pubitemid 44601634)
    • (2006) IEE Proceedings: Generation, Transmission and Distribution , vol.153 , Issue.6 , pp. 719-727
    • Choi, J.1    Mount, T.D.2    Thomas, R.J.3    Billinton, R.4
  • 7
    • 79151482681 scopus 로고    scopus 로고
    • A scenario-based multi-objective model for multi-stage transmission expansion planning
    • Feb.
    • P.Maghouli, S. H. Hoseini, M. Oloomi, andM. Shahidehpour, "A scenario-based multi-objective model for multi-stage transmission expansion planning," IEEE Trans. Power Syst., vol. 26, no. 1, pp. 470-478, Feb. 2011.
    • (2011) IEEE Trans. Power Syst. , vol.26 , Issue.1 , pp. 470-478
    • Maghouli, P.1    Hoseini, S.H.2    Oloomi, M.3    Shahidehpour, M.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.