메뉴 건너뛰기




Volumn 2, Issue 3, 2009, Pages 244-266

A simulated annealing algorithm for optimal supplier selection using the reliability-based total cost of ownership model

Author keywords

Reliability; SAA; Simulated annealing algorithm; Supplier selection; TCO; Total cost of ownership

Indexed keywords


EID: 84864130323     PISSN: 17538432     EISSN: 17538440     Source Type: Journal    
DOI: 10.1504/IJPM.2009.024809     Document Type: Article
Times cited : (19)

References (64)
  • 1
    • 34247531855 scopus 로고    scopus 로고
    • Supplier selection and order lot sizing modeling: A review
    • DOI 10.1016/j.cor.2006.01.016, PII S0305054806000153
    • Aissaoui, N., Haouari, M. and Hassini, E. (2007) 'Supplier selection and order lot sizing modeling: A review', Computers and Operations Research, Vol. 34, No. 12, pp.3516-3540. (Pubitemid 46661030)
    • (2007) Computers and Operations Research , vol.34 , Issue.12 , pp. 3516-3540
    • Aissaoui, N.1    Haouari, M.2    Hassini, E.3
  • 2
    • 60249100377 scopus 로고    scopus 로고
    • An integrated fuzzy model for supplier management: A case study of ISP selection and evaluation
    • doi:10.1016/j.eswa.2008.10.012
    • Amin, S.H. and Razmi, J. (2008) 'An integrated fuzzy model for supplier management: A case study of ISP selection and evaluation', Expert Systems with Applications, doi:10.1016/j.eswa.2008.10.012.
    • (2008) Expert Systems with Applications
    • Amin, S.H.1    Razmi, J.2
  • 3
    • 0031361862 scopus 로고    scopus 로고
    • A simulated annealing algorithm for system cost minimization subject to reliability constraints
    • Angus, J.E. and Kevin, A. (1997) 'A simulated annealing algorithm for system cost minimization subject to reliability constraint', Communications in Statistics-Simulation and Computation, Vol. 26, No. 2, pp.783-790. (Pubitemid 127449296)
    • (1997) Communications in Statistics Part B: Simulation and Computation , vol.26 , Issue.2 , pp. 783-790
    • Angus, J.E.1    Ames, K.2
  • 4
    • 79952673236 scopus 로고    scopus 로고
    • How to ensure your outsourcing/supplier partnership is the best
    • Anonymous
    • Anonymous (1999) 'How to ensure your outsourcing/supplier partnership is the best', Supplier Selection and Management Report, Vol. 99, No. 1.
    • (1999) Supplier Selection and Management Report , vol.99 , Issue.1
  • 6
    • 0011714195 scopus 로고    scopus 로고
    • ABM and the procurement cost model
    • March
    • Bennett, P. (1996) 'ABM and the procurement cost model', Management Accounting, March, pp.28-32.
    • (1996) Management Accounting , pp. 28-32
    • Bennett, P.1
  • 7
    • 1842449646 scopus 로고    scopus 로고
    • Investigating the decision criteria used in electronic components procurement
    • DOI 10.1016/S0019-8501(03)00081-6, PII S0019850103000816
    • Bharadwaj, N. (2004) 'Investigating the decision criteria used in electronic components procurement', Industrial Marketing Management, Vol. 33, pp.317-323. (Pubitemid 38457886)
    • (2004) Industrial Marketing Management , vol.33 , Issue.4 , pp. 317-323
    • Bharadwaj, N.1
  • 8
    • 0242698519 scopus 로고    scopus 로고
    • Supplier selection problem: A comparison of the total cost of ownership and analytic hierarchy process approaches
    • DOI 10.1108/13598540210436586
    • Bhutta, K.S. and Huq, F. (2002) 'Supplier selection problem: A comparison of the total cost of ownership and analytic hierarchy process approaches', Supply Chain Management: An International Journal, Vol. 7, No. 3, pp.126-135. (Pubitemid 38947721)
    • (2002) Supply Chain Management , vol.7 , Issue.3 , pp. 126-135
    • Bhutta, K.S.1    Huq, F.2
  • 12
    • 0038981414 scopus 로고
    • Measuring the cost of ownership
    • Carr, L.P. and Ittner, C.D. (1992) 'Measuring the cost of ownership', Journal of Cost Management, Vol. 6, No. 3, pp.7-13.
    • (1992) Journal of Cost Management , vol.6 , Issue.3 , pp. 7-13
    • Carr, L.P.1    Ittner, C.D.2
  • 13
    • 0026839215 scopus 로고
    • Integrating life-cycle cost and cost-of-ownership in the commercial sector
    • 21-23 January
    • Carrubba, E.R. (1992) 'Integrating life-cycle cost and cost-of-ownership in the commercial sector', Reliability and Maintainability Symposium, Annual Proceedings, 21-23 January, pp.101-108.
    • (1992) Reliability and Maintainability Symposium, Annual Proceedings , pp. 101-108
    • Carrubba, E.R.1
  • 14
    • 0000057765 scopus 로고
    • A total cost/value model for supply chain competitiveness
    • Cavinato, J.L. (1992) 'A total cost/value model for supply chain competitiveness', Journal of Business Logistics, Vol. 13, No. 2, pp.285-301.
    • (1992) Journal of Business Logistics , vol.13 , Issue.2 , pp. 285-301
    • Cavinato, J.L.1
  • 15
    • 48749128392 scopus 로고    scopus 로고
    • An integrated neural network and data envelopment analysis for supplier evaluation under incomplete information
    • Celebi, D. and Bayraktar, D. (2008) 'An integrated neural network and data envelopment analysis for supplier evaluation under incomplete information', Expert Systems with Applications, Vol. 35, pp.1698-1710.
    • (2008) Expert Systems with Applications , vol.35 , pp. 1698-1710
    • Celebi, D.1    Bayraktar, D.2
  • 19
    • 0347698558 scopus 로고    scopus 로고
    • Managing your IT total cost of ownership
    • DOI 10.1145/502269.502273
    • David, J.S., Schuff, D. and St. Louis, R. (2002) 'Managing your IT total cost of ownership', Communications of the ACM, Vol. 45, No. 1, pp.101-106. (Pubitemid 135702397)
    • (2002) Communications of the ACM , vol.45 , Issue.1 , pp. 101-106
    • David, J.S.1    Schuff, D.2    St. Louis, R.3
  • 20
    • 0012074924 scopus 로고    scopus 로고
    • A review of methods supporting supplier selection
    • DOI 10.1016/S0969-7012(00)00028-9, PII S0969701200000289
    • De Boer, L., Labro, E. and Morlacchi, P. (2001) 'A review of methods supporting supplier selection', European Journal of Purchasing and Supply Management, Vol. 7, No. 2, pp.75-89. (Pubitemid 33632140)
    • (2001) European Journal of Purchasing and Supply Management , vol.7 , Issue.2 , pp. 75-89
    • De Boer, L.1    Labro, E.2    Morlacchi, P.3
  • 21
    • 0033704252 scopus 로고    scopus 로고
    • An evaluation of vendor selection models from a total cost of ownership perspective
    • Degraeve, Z., Labro, E. and Roodhooft, F. (2000) 'An evaluation of vendor selection models from a total cost of ownership perspective', European Journal of Operational Research, Vol. 125, pp.34-58.
    • (2000) European Journal of Operational Research , vol.125 , pp. 34-58
    • Degraeve, Z.1    Labro, E.2    Roodhooft, F.3
  • 22
    • 20744449366 scopus 로고    scopus 로고
    • Constructing a Total Cost of Ownership supplier selection methodology based on Activity-Based Costing and mathematical programming
    • Degraeve, Z., Labro, E. and Roodhooft, F. (2005) 'Constructing a total cost of ownership supplier selection methodology based on activity-based costing and mathematical programming', Accounting and Business Research, Vol. 35, No. 1, pp.3-27. (Pubitemid 40856090)
    • (2005) Accounting and Business Research , vol.35 , Issue.1 , pp. 3-27
    • Degraeve, Z.1    Labro, E.2    Roodhooft, F.3
  • 23
  • 24
    • 0002750342 scopus 로고
    • An analysis of vendor selection systems and decisions
    • Dickson, G.W. (1966) 'An analysis of vendor selection systems and decisions', Journal of Purchasing, Vol. 2, No. 1, pp.5-17.
    • (1966) Journal of Purchasing , vol.2 , Issue.1 , pp. 5-17
    • Dickson, G.W.1
  • 25
    • 84990374161 scopus 로고    scopus 로고
    • Reliability and maintainability allocation to minimize total cost of ownership in a series-parallel system
    • Dinesh Kumar, U., Ramirez-Marquez, J.E., Nowicki, D. and Verma, D. (2007) 'Reliability and maintainability allocation to minimize total cost of ownership in a series-parallel system', Journal Risk and Reliability, Vol. 221, pp.133-140.
    • (2007) Journal Risk and Reliability , vol.221 , pp. 133-140
    • Dinesh Kumar, U.1    Ramirez-Marquez, J.E.2    Nowicki, D.3    Verma, D.4
  • 29
    • 0002102239 scopus 로고    scopus 로고
    • Total cost of ownership: A key concept in strategic cost management decisions
    • Ellram, L.M. and Siferd, S.P. (1998) 'Total cost of ownership: A key concept in strategic cost management decisions', Journal of Business Logistics, Vol. 19, No. 1, pp.55-76.
    • (1998) Journal of Business Logistics , vol.19 , Issue.1 , pp. 55-76
    • Ellram, L.M.1    Siferd, S.P.2
  • 30
    • 0001875028 scopus 로고
    • Decision criteria used in buying different categories of products
    • August
    • Evans, D.R. (1981) 'Decision criteria used in buying different categories of products', Journal of Purchasing and Materials Management, August, pp.9-14.
    • (1981) Journal of Purchasing and Materials Management , pp. 9-14
    • Evans, D.R.1
  • 31
    • 33750689577 scopus 로고    scopus 로고
    • A data envelopment analysis approach based on total cost of ownership for supplier selection
    • DOI 10.1108/17410390610708526
    • Garfamy, R.M. (2006) 'A data envelopment analysis approach based on total cost of ownership for supplier selection', Journal of Enterprise Information Management, Vol. 19, No. 6, pp.662-678. (Pubitemid 44704579)
    • (2006) Journal of Enterprise Information Management , vol.19 , Issue.6 , pp. 662-678
    • Garfamy, R.M.1
  • 32
    • 0032156562 scopus 로고    scopus 로고
    • A decision support system for supplier selection using an integrated analytic hierarchy process and linear programming
    • PII S0925527397000091
    • Ghodsypour, S.H. and O'Brien, C. (1998) 'A decision support system for supplier selection using an integrated analytic hierarchy process and linear programming', International Journal of Production Economics, Vols. 56-57, Nos. 1-3, pp.199-212. (Pubitemid 128400944)
    • (1998) International Journal of Production Economics , vol.56-57 , pp. 199-212
    • Ghodsypour, S.H.1    O'Brien, C.2
  • 33
    • 33746861470 scopus 로고    scopus 로고
    • Total cost of ownership analysis for modular final assembly systems
    • DOI 10.1080/00207540600806448, PII T12453H867838742
    • Heilala, J., Helin, K. and Montonen, J. (2006) 'Total cost of ownership analysis for modular final assembly systems', International Journal of Production Research, Vol. 44, Nos. 18-19, pp.3967-3988. (Pubitemid 44181133)
    • (2006) International Journal of Production Research , vol.44 , Issue.18-19 , pp. 3967-3988
    • Heilala, J.1    Helin, K.2    Montonen, J.3
  • 34
    • 0032098746 scopus 로고    scopus 로고
    • Which contractor selection methodology?
    • PII S0263786397000355
    • Holt, G.D. (1998) 'Which contractor selection methodology?', International Journal of Project Management, Vol. 16, No. 3, pp.153-164. (Pubitemid 128403398)
    • (1998) International Journal of Project Management , vol.16 , Issue.3 , pp. 153-164
    • Holt, G.D.1
  • 36
    • 0037290097 scopus 로고    scopus 로고
    • A simulated annealing methodology to distribution network design and management
    • DOI 10.1016/S0377-2217(02)00153-4, PII S0377221702001534
    • Jayaraman, V. and Ross, A. (2003) 'A simulated annealing methodology to distribution network design and management', European Journal of Operational Research, Vol. 144, pp.629-645. (Pubitemid 35276387)
    • (2003) European Journal of Operational Research , vol.144 , Issue.3 , pp. 629-645
    • Jayaraman, V.1    Ross, A.2
  • 37
    • 0041650320 scopus 로고    scopus 로고
    • An application of visual interactive goal programming: A case in vendor selection decisions
    • Karpak, B., Kumcu, E. and Kasuganti, R. (1999) 'An application of visual interactive goal programming: A case in vendor selection decisions', Journal of Multi-Criteria Decision Analysis, Vol. 8, pp.93-105.
    • (1999) Journal of Multi-Criteria Decision Analysis , vol.8 , pp. 93-105
    • Karpak, B.1    Kumcu, E.2    Kasuganti, R.3
  • 38
    • 54449099768 scopus 로고    scopus 로고
    • Cost of ownership model for the RFID logistics system
    • doi:10.1016/j.ejor.2007.12.015
    • Kim, H.S. and Sohn, S.Y. (2008) 'Cost of ownership model for the RFID logistics system', European Journal of Operational Research, doi:10.1016/j.ejor.2007.12.015.
    • (2008) European Journal of Operational Research
    • Kim, H.S.1    Sohn, S.Y.2
  • 39
    • 26444479778 scopus 로고
    • Optimization by simulated annealing
    • Kirkpatrick, S., Gelatt, C.D., Jr. and Vecchi, M.P. (1983) 'Optimization by simulated annealing', Science, Vol. 220, pp.671-680.
    • (1983) Science , vol.220 , pp. 671-680
    • Kirkpatrick, S.1    Gelatt Jr., C.D.2    Vecchi, M.P.3
  • 40
    • 0035416014 scopus 로고    scopus 로고
    • Supplier selection and management system considering relationships in supply chain management
    • DOI 10.1109/17.946529, PII S0018939101067034
    • Lee, E.K., Ha, S. and Kim, S.K. (2001) 'Supplier selection and management system considering relationships in supply chain management', IEEE Transactions on Engineering Management, Vol. 48, pp.307-318. (Pubitemid 32933090)
    • (2001) IEEE Transactions on Engineering Management , vol.48 , Issue.3 , pp. 307-318
    • Lee, E.-K.1    Ha, S.2    Kim, S.-K.3
  • 41
    • 0002795009 scopus 로고
    • Difference in attribute importance for different industrial products
    • Lehmann, D.R. and O'Shaughnessy, J. (1974) 'Difference in attribute importance for different industrial products', Journal of Marketing, Vol. 38, pp.36-42.
    • (1974) Journal of Marketing , vol.38 , pp. 36-42
    • Lehmann, D.R.1    O'Shaughnessy, J.2
  • 43
    • 33750358829 scopus 로고    scopus 로고
    • A multi-objective supplier selection model under stochastic demand conditions
    • DOI 10.1016/j.ijpe.2006.03.001, PII S0925527306000715
    • Liao, Z. and Rittscher, J. (2007) 'A multi objective supplier selection model under stochastic demand conditions', International Journal of Production Economics, Vol. 105, No. 1, pp.150-159. (Pubitemid 44636203)
    • (2007) International Journal of Production Economics , vol.105 , Issue.1 , pp. 150-159
    • Liao, Z.1    Rittscher, J.2
  • 44
    • 0030375168 scopus 로고    scopus 로고
    • Optimal reliability allocation in series parallel systems from component's discrete cost-reliability data sets: A nested simulated annealing approach
    • Minneapolis, Minnesota, May
    • Majesty, S.V., Venkatasubramanian, S. and Smith, A.E. (1996) 'Optimal reliability allocation in series parallel systems from component's discrete cost-reliability data sets: A nested simulated annealing approach', Proceedings of the Fifth International Industrial Engineering Research Conference, Minneapolis, Minnesota, May, pp.435-440.
    • (1996) Proceedings of the Fifth International Industrial Engineering Research Conference , pp. 435-440
    • Majesty, S.V.1    Venkatasubramanian, S.2    Smith, A.E.3
  • 45
    • 0001892254 scopus 로고
    • Computer-assisted decision-making in purchasing
    • Moore, D.L. and Fearon, H.E. (1973) 'Computer-assisted decision-making in purchasing', Journal of Purchasing, Vol. 9, No. 4, pp.5-25.
    • (1973) Journal of Purchasing , vol.9 , Issue.4 , pp. 5-25
    • Moore, D.L.1    Fearon, H.E.2
  • 46
    • 0001886332 scopus 로고
    • Using the analytic hierarchy process to structure the supplier selection procedure
    • Nydick, R. and Hill, R. (1992) 'Using the analytic hierarchy process to structure the supplier selection procedure', Journal of Purchasing Materials Management, Vol. 25, No. 2, pp.31-36.
    • (1992) Journal of Purchasing Materials Management , vol.25 , Issue.2 , pp. 31-36
    • Nydick, R.1    Hill, R.2
  • 47
    • 0002523947 scopus 로고
    • Allocation of order quantity among suppliers
    • Pan, A.C. (1989) 'Allocation of order quantity among suppliers', Journal of Purchasing and Materials Management, Vol. 25, No. 3, pp.36-39.
    • (1989) Journal of Purchasing and Materials Management , vol.25 , Issue.3 , pp. 36-39
    • Pan, A.C.1
  • 48
    • 0032019125 scopus 로고    scopus 로고
    • A systematic procedure for setting parameters in simulated annealing algorithms
    • Park, M-W. and Kim, Y-D. (1998) 'A systematic procedure for setting parameters in simulated annealing algorithms', Computers Operations Research, Vol. 25, No. 3, pp.207-217.
    • (1998) Computers Operations Research , vol.25 , Issue.3 , pp. 207-217
    • Park, M.-W.1    Kim, Y.-D.2
  • 49
    • 28544447455 scopus 로고    scopus 로고
    • Supplier evaluation and selection via Taguchi loss functions and an AHP
    • DOI 10.1007/s00170-004-2227-z
    • Pi, W.N. and Low, C. (2006) 'Supplier evaluation and selection via Taguchi loss functions and an AHP', International Journal of Advanced Manufacturing Technology, Vol. 27, Nos. 5-6, pp.625-630. (Pubitemid 41744293)
    • (2006) International Journal of Advanced Manufacturing Technology , vol.27 , Issue.5-6 , pp. 625-630
    • Pi, W.-N.1    Low, C.2
  • 50
    • 34250341835 scopus 로고    scopus 로고
    • Supplier selection problem: Integrating DEA with the approaches of total cost of ownership and AHP
    • Ramanathan, R. (2007) 'Supplier selection problem: Integrating DEA with the approaches of total cost of ownership and AHP', Supply Chain Management: An International Journal, Vol. 12, No. 4, pp.258-261.
    • (2007) Supply Chain Management: An International Journal , vol.12 , Issue.4 , pp. 258-261
    • Ramanathan, R.1
  • 53
    • 0027927439 scopus 로고
    • A procurement decision support system in business volume discount environments
    • Sadrian, A.A. and Yoon, Y.S. (1994) 'A procurement decision support system in business volume discount environments', Operations Research, Vol. 42, No. 1, pp.14-23.
    • (1994) Operations Research , vol.42 , Issue.1 , pp. 14-23
    • Sadrian, A.A.1    Yoon, Y.S.2
  • 54
    • 0000580905 scopus 로고
    • Multiple source procurement competitions
    • Seshadri, S., Chatterjee, K. and Lilien, G.L. (1991) 'Multiple source procurement competitions', Marketing Science, Vol. 10, No. 3, pp.246-253.
    • (1991) Marketing Science , vol.10 , Issue.3 , pp. 246-253
    • Seshadri, S.1    Chatterjee, K.2    Lilien, G.L.3
  • 56
    • 78651551585 scopus 로고    scopus 로고
    • A review and critique of supplier selection process and practices
    • ISBN: 1 85901 197 7
    • Sonmez, M. (2006) 'A review and critique of supplier selection process and practices', Business School Occasional Papers Series Paper, Vol. 1, ISBN: 1 85901 197 7.
    • (2006) Business School Occasional Papers Series Paper , vol.1
    • Sonmez, M.1
  • 57
    • 0142059125 scopus 로고    scopus 로고
    • Simulated annealing-based multi objective algorithms and their application for system reliability
    • Suman, B. (2003) 'Simulated annealing-based multi objective algorithms and their application for system reliability', Engineering Optimization, Vol. 35, No. 4, pp.391-416.
    • (2003) Engineering Optimization , vol.35 , Issue.4 , pp. 391-416
    • Suman, B.1
  • 58
    • 13844254272 scopus 로고    scopus 로고
    • A note on "A methodology for supply base optimization"
    • DOI 10.1109/TEM.2004.839960
    • Talluri, S. and Narasimhan, R. (2005) 'A note on a methodology for supply base optimization', IEEE Transactions on Engineering Management, Vol. 52, No. 1, pp.130-139. (Pubitemid 40241905)
    • (2005) IEEE Transactions on Engineering Management , vol.52 , Issue.1 , pp. 130-139
    • Talluri, S.1    Narasimhan, R.2
  • 61
    • 0032188457 scopus 로고    scopus 로고
    • Interactive simulated annealing in a multi objective framework: Application to an industrial problem
    • Ulungu, L.E., Teghem, J. and Ost, C. (1998) 'Interactive simulated annealing in a multi objective framework: Application to an industrial problem', J. Oper. Res. Soc., Vol. 49, pp.1044-1050.
    • (1998) J. Oper. Res. Soc. , vol.49 , pp. 1044-1050
    • Ulungu, L.E.1    Teghem, J.2    Ost, C.3
  • 64
    • 0001875028 scopus 로고
    • Decision criteria used in buying different categories of products
    • August
    • Wilson, D.R. (1984) 'Decision criteria used in buying different categories of products', Journal of Purchasing and Materials Management, August, pp.9-14.
    • (1984) Journal of Purchasing and Materials Management , pp. 9-14
    • Wilson, D.R.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.